# Power and cooling careers that keep a data hall online

Electricians and power technicians own the feed, switchgear, UPS, and generators. HVAC technicians own CRAH units, chillers, and refrigerant circuits. Pipefitters own building water and glycol. IT raises the ticket. IT does not own the breakers or the refrigerant.

NFPA 70E is safety training, not an electrician license. NETA levels depend on the employer. EPA Section 608 applies to covered refrigerant work, not every HVAC task.

- Facility systems: /facility-systems/
- EPA 608: /certifications/epa-608-universal-guide/
- NFPA 70E checklist: /certifications/nfpa-70e-electrical-safety-standard/
- Jobs: /jobs/
- Data center power: https://highpayingtrades.com/guides/data-center-power/
- Commercial HVAC and controls: https://highpayingtrades.com/guides/commercial-hvac-bas/
- Time to $100k, national baseline for electrician and HVAC among nine trades: https://highpayingtrades.com/tools/time-to-100k/
- Trade ROI calculator (apprenticeship vs. college): https://highpayingtrades.com/tools/trade-roi-calculator/
- Base vs. overtime calculator: https://highpayingtrades.com/tools/base-vs-overtime-calculator/

Canonical HTML: https://datacenterskilledtrades.com/guides/power-and-cooling-careers/
