# How to get ready for the planned Brownsville refinery

Canonical: https://datacenterskilledtrades.com/power/brownsville-refinery-jobs/

1. [Home](/)
2. [Power and Industrial Trades](/power/)
3. Brownsville refinery jobs

- [Home](/)
- [Power and Industrial Trades](/power/)
- Brownsville refinery

Power and industrial trades · Brownsville

# How to get ready for the planned Brownsville refinery

America First Refining has announced a planned refinery at the Port of Brownsville.  Fluor is doing the front-end engineering.  Here is what the project is, which trades a build like this typically needs, and how to get ready now.

DC  By the DataCenterSkilledTrades research desk.

Status as of November 13, 2026

Planned.  Engineering underway as of July 2026.  Groundbreaking date to be announced.

- Announced March 10, 2026, as a planned refinery at the Port of Brownsville.

- Planned capacity is about 60 million barrels a year, or about 164,000 barrels a day.  Fluor has described it as more than 60 million barrels a year.

- There is a 20-year offtake term sheet with Reliance.

- Fluor was selected in April 2026 to execute front-end engineering and design (FEED).  The contract value was not disclosed.

- The company said it would officially break ground in the second quarter of 2026.  A groundbreaking date is still to be announced.

- As of July 2026, local reporting said the company was still finishing engineering.

The useful move now is to get credentials and local training in order, then watch for a groundbreaking date.

## On this page

- [Current status](#status)

- [Credentials to get now](#prepare)

- [Crafts by phase](#phases)

- [Rio Grande Valley training and pay](#training)

- [Questions people ask](#faq)

- [Sources](#sources)

## Credentials to get now

These cards travel with you on Gulf plant, port, and industrial work, including this project when hiring starts.  They are typical gate items on those sites.  Confirm the contractor’s list before you pay a fee.

### TWIC
A Transportation Worker Identification Credential is a common ask on Port of Brownsville and other port or plant sites.

### NCCER
Many industrial contractors use NCCER credentials to screen craft skill.  Useful on plant jobs up and down the Gulf, including this one.

### OSHA 30
A 30-hour construction or general-industry card is a frequent gate requirement.  OSHA 10 is a shorter first step if you are starting out.

### ASME Section IX
The welding qualification industrial plants actually test to, often alongside an AWS card.  Get this if you weld.

Electricians should also carry a state license and NFPA 70E training.  Pipefitters often see ASME B31.3 work on process units.  Those are the same credentials we describe on the [Texas plant and grid jobs](/power/texas-power-plant-grid-jobs/#certs) guide.

## Crafts by phase

Here is the usual sequence on a greenfield refinery, so you can prepare in the right order.

- First, when construction starts

### Civil and site work

 Clearing, piling, foundations, underground utilities, roads, and drainage.  Operators, carpenters, ironworkers, laborers, and concrete finishers show up first.  A TWIC card and OSHA 30 are the credentials that usually get you through a port-site gate.

- Then mechanical erection

### Pipe and welding

 Process pipe, racks, and vessel work are the heart of a refinery build.  Pipefitters, combo welders, boilermakers, and insulators are the tight crafts.  ASME Section IX (and the code of the job, such as B31.3) is what a welding test will follow.

- Alongside the pipe

### Electrical and instrumentation

 Power distribution, lighting, cable tray, motors, and the instruments that make a unit runnable.  Industrial electricians, instrumentation techs, and controls hands.  License, NFPA 70E, and NCCER credentials are the usual asks.

- After startup, years later

### Operations and turnarounds

 A running plant needs operators and a maintenance crew, then periodic outages that pull traveling welders, pipefitters, boilermakers, millwrights, and inspectors.  That work comes after the unit is built and in service.

## Rio Grande Valley training and pay

Use these local schools and the Brownsville-Harlingen wage table to plan training close to the port.  Check the school or sponsor for current programs, because offerings change.

- Texas State Technical College, Harlingen.   We already note this TSTC campus on our [West Texas and Rio Grande Valley market page](/markets/west-texas/).

- Texas Southmost College, Brownsville.   Listed on our [VeteranTradeSchools electrician directory for Texas](https://veterantradeschools.com/electrician/texas/) as a regionally accredited, VA-approved school.

- South Texas College, McAllen.   Also in our VeteranTradeSchools electrician and [welding](https://veterantradeschools.com/welding/texas/) directories.

- Rio Grande Valley Chapter of Independent Electrical Contractors, Harlingen.   A merit-shop electrical apprenticeship sponsor in our VeteranTradeSchools Texas electrician listings.

- Super Welders Academy, Brownsville.   Listed as a welding apprenticeship sponsor in our [RegisteredTradeSchools Texas welding apprenticeships](https://registeredtradeschools.com/apprenticeships/tx/welding/) directory.

For the wider Texas lists, including other Valley programs, use those two sister directories.

 BLS OEWS May 2025, Brownsville-Harlingen metro, all industries

  Occupation  Median annual  10th to 90th percentile  Employment

  Electricians (47-2111)
 $46,080
 $32,180 to $66,420
 450
  Plumbers, pipefitters, steamfitters (47-2152)
 $46,850
 $32,670 to $63,820
 250

These are all-employer medians for the Brownsville-Harlingen metro.  Construction work can add overtime or per diem when a contractor offers it.  For planning, our West Texas market page already cites the GSA FY2027 benchmark for Cameron County, listed under South Padre Island: $123 lodging and $74 meals.


## Questions people ask

  Has the Brownsville refinery broken ground? A groundbreaking date is still to be announced.  The company said on March 10, 2026 that it would officially break ground in the second quarter of 2026.  As of July 2026, local reporting said engineering was still in progress.

  Who is doing the engineering? America First Refining selected Fluor in April 2026 to execute front-end engineering and design, known as FEED.  The contract value was not disclosed.

  How large is the planned plant? The company described capacity of about 60 million barrels a year of U.S. light shale oil, or about 164,000 barrels a day.  Fluor described it as more than 60 million barrels a year.  A 168,000 barrel-a-day figure sometimes appears elsewhere; we stay with the official company number.

  Should I move to the Rio Grande Valley for this job now? The useful move now is to earn transferable credentials (TWIC, NCCER, OSHA 30, and ASME Section IX for welders) and learn the local training options.  Wait for a groundbreaking date before you relocate for this project.

## Sources

One official or major-news source per fact cluster.  Training and wage figures are from directories and tables we already publish.

- Project announcement, capacity of about 60 million barrels a year, Reliance offtake term sheet, and the second-quarter 2026 groundbreaking target: [America First Refining release, March 10, 2026](https://www.prnewswire.com/news-releases/america-first-refining-secures-landmark-20-year-offtake-agreement-and-capital-investment-to-construct-first-new-us-refinery-in-50-years-302710137.html).

- Fluor selected for FEED: [Fluor newsroom, April 7, 2026](https://newsroom.fluor.com/news-releases/news-details/2026/Fluor-Awarded-Contract-to-Engineer-and-Design-the-America-First-Refining-Facility-in-Brownsville-Texas/default.aspx).

- Engineering still in progress as of July 2026: [Rio Grande Valley Business Journal, July 4, 2026](https://www.rgvbusinessjournal.com/news/07/04/2026/brownsville-refinery-contracts-project-advances/).

- Brownsville-Harlingen wages and the TSTC Harlingen campus: [West Texas market page](/markets/west-texas/), BLS OEWS May 2025.  Valley schools and apprenticeship sponsors: [VeteranTradeSchools Texas electrician](https://veterantradeschools.com/electrician/texas/), [welding](https://veterantradeschools.com/welding/texas/), and [RegisteredTradeSchools Texas welding apprenticeships](https://registeredtradeschools.com/apprenticeships/tx/welding/).

## Next steps

- [Texas grid projects with signed agreements](/power/texas-grid-projects/)


Prepare the transferable credentials first.  For Texas work that is already financed, use the plant and grid guide.

Texas plant and grid jobs