# How to get hired on a Texas power-plant or grid job

Texas is already financing new gas plants and a large grid rebuild.  That work belongs to electricians, linemen, pipefitters, welders, and instrumentation techs, whether or not any one customer class stays hot.  This page sticks to projects we can source, and it says plainly when a project is approved, under construction, or still waiting on a final decision.

   $2.08B  disbursed   5,446 MW  awarded   Mid-2028  Entergy target  Checked November 13, 2026
  Funded plants  Crafts and certs

DC  By the DataCenterSkilledTrades research desk.  Figures checked November 13, 2026.

  $2.08B Texas Energy Fund disbursements as of November 2, 2026, on nine in-ERCOT loan awards.

 Source: [Texas Energy Fund awards](https://www.txenergyfund.texas.gov/texas-energy-fund-awards)
  1,200+ MW Entergy Legend in Port Arthur and Lone Star near Cleveland, approved, aimed at mid-2028.

 Source: [Entergy newsroom](https://www.entergy.com/news/entergy-texas-receives-puct-approval-for-two-power-plants-to-support-southeast-texas-growth)
  2,800 miles Approximate mileage in AEP’s Texas grid loan, announced July 8, 2026, at up to $3.26 billion.

 Source: [Reuters](https://www.reuters.com/business/energy/aeps-texas-unit-secures-up-326-billion-federal-loan-upgrade-power-grid-2026-07-08/)

## On this page

- [How to read a project](#read)

- [Texas Energy Fund plants](#txef)

- [Entergy Legend and Lone Star](#entergy)

- [AEP Texas grid loan](#aep)

- [Seadrift nuclear permit](#seadrift)

- [The pending permitting bill](#policy)

- [Trades and credentials](#certs)

- [Texas pay we already hold](#pay)

- [Training and locals](#training)

- [Questions people ask](#faq)

- [Sources](#sources)

## How to read a project

Hiring follows money and a start date, not a press conference.  Use three tests before you relocate or turn down other work.

- Is the money real?   A state loan already disbursed, a utility commission approval, or a signed federal loan is stronger than a concept drawing.

- Has construction started?   We only say that when a primary source does.  On this page, NRG Cedar Bayou 5 is the gas unit we can describe as under construction.

- Is there still a decision left?   A construction permit without a final investment decision, as at Seadrift, is not a hiring date.

Data centers are one reason Texas utilities and generators talk about new load.  They are not the test above.  A combined-cycle plant or a 2,800-mile grid program has to serve industrial demand and community growth as well.  If you also want the data-center job board we maintain in Texas, use the [North and Central Texas](/markets/north-and-central-texas/) and [West Texas](/markets/west-texas/) market pages.  Those pages are a parallel labor pool, not the project list on this one.

## Texas Energy Fund plants

As of November 2, 2026, nine in-ERCOT loan awards totaled about 5,446 MW, and $2.08 billion had already been disbursed.  That is the policy actually moving dirt.  It is state law, not a pending federal bill.

   Largest award

### CPV Basin Ranch

1,350 MW · ERCOT West

The largest award in the current Texas Energy Fund list.  ERCOT West is oilfield and open-country grid country, closer in labor-market terms to Midland and Abilene than to Dallas.  Expect generation, pipe, and electrical crafts, not a downtown commercial job.

   Under construction

### NRG Cedar Bayou 5

721 MW combined cycle · Chambers County, near Baytown

State materials describe this unit as under construction, backed by a $562 million fund loan, with a target of coming online in summer 2028.  Combined-cycle work is mechanical and electrical at once: pipe, weld, instrumentation, and switchgear, with industrial safety rules at the gate.

   Loan awards

### Other named awards

Part of the same nine-award list

The same official awards list also names NRG Houston units, Calpine Pin Oak Creek, Vistra Permian Power I (860 MW), and Pecos Power Plant (452 MW).  We have names and sizes for those awards.  We do not have a later independent source in this pass that confirms a construction start for each one, so we do not claim one.

If you are chasing a 2028 commercial operation date, the craft peak is earlier than the in-service date.  Civil and underground work comes first.  Pipe, weld, electrical, and instrumentation stack in the middle.  Commissioning and startup close the job.  A summer 2028 online date, like Cedar Bayou 5, is a reason to watch contractor hiring in 2026 and 2027, not a reason to wait until the unit is already running.

## Entergy Legend and Lone Star

Entergy Texas received Public Utility Commission of Texas approval for two plants: Legend in Port Arthur and Lone Star near Cleveland.  Together they are more than 1,200 MW.  The company budgets $1.6 billion and $799 million, with a mid-2028 in-service target.  Entergy says the work supports about 9,000 construction jobs, and that it supports southeast Texas growth.  The job count and the growth phrase are the company’s, not a state staffing plan.

Port Arthur and the Cleveland area are industrial Gulf Coast work.  TWIC is a common ask on plant and port sites in this corridor.  Confirm it with the contractor, because we are not citing a project-by-project badge list.

## AEP Texas grid loan

On July 8, 2026, AEP’s Texas unit secured a federal loan of up to $3.26 billion for about 2,800 miles of upgrades, including Permian demand.  This is the clearest industrial, non-campus driver on the page.  Permian load is oil, gas, and midstream electricity use, not a single data hall.

Grid programs hire linemen first, then substation electricians, equipment operators, and the traffic and civil crews that keep a linear job moving.  The work is spread over miles and years, which is why it is a more stable planning bet than any one plant announcement.  OSHA 10 or 30 and a utility or contractor orientation are the usual entry tickets.  TWIC is less typical on a transmission right of way than at a ship-channel plant, unless the contractor says otherwise.

## Seadrift nuclear permit

In the week of November 9 to 12, 2026, the Nuclear Regulatory Commission issued a construction permit for four 80 MW X-energy Xe-100 reactors, 320 MW in all, at Dow’s Seadrift / Long Mott site, between Houston and Corpus Christi.  Dow still must make a final investment decision.  If the project proceeds, construction could begin before 2030.  It is not under construction.

A construction permit is permission to build, not a notice to mobilize.  Treat Seadrift as a project to watch, especially if you already hold nuclear or process-plant credentials, not as a 2026 hiring event.

## The pending permitting bill

The Bipartisan American Affordability and Jobs Act of 2026, or BAAJA, is S.5653.  The Senate is using H.R. 2347 as the vehicle.  It is broad permitting reform: environmental reviews, Clean Water Act and Endangered Species Act changes, some FERC transmission siting authority, and ratepayer protections for large computational loads such as data centers.  Chairman language around the bill has described help for many project types, not only plants built to serve those loads.

On November 9, 2026, the Senate invoked cloture on the motion to proceed, 73 to 25.  On November 10 it agreed to proceed, 62 to 21.  On November 11, cloture on the substitute and on the measure was filed, not invoked.  The bill has not passed and is not law.  Do not build a 2026 or 2027 work plan on it.

## Trades and credentials

Match the craft to the job, then add the safety card the gate is likely to want.  The list below is what industry staffing sources and Gulf practice commonly cite.  It is not a counted survey, and it is not a substitute for the contractor’s bid package.

 Crafts these Texas projects typically need, and the credentials commonly asked for

  Craft  Where it shows up  Common credentials

  Electricians  Plant electrical, switchgear, and generation; substation work on the AEP program  State license, NFPA 70E / arc-flash, often NCCER, OSHA 10 or 30
  Linemen  AEP Texas mileage and other transmission rebuilds  Line apprenticeship or equivalent, OSHA 10 or 30, utility or contractor qualifications
  Pipefitters  Combined-cycle and industrial process pipe, fuel gas, and utilities  ASME B31.3; API 570 familiarity is often cited; NCCER; OSHA 10 or 30
  Welders  Plant and industrial fabrication, especially combo weld seats  AWS, plus ASME Section IX or API 1104 to the code of the job
  Instrumentation techs  Controls and loop work on gas plants and process units  Trade or instrument qualification, NCCER where the contractor uses it, OSHA 10 or 30
  TWIC  Common on Gulf plant and port sites, including the Port Arthur corridor  Transportation Worker Identification Credential, when the site is a regulated port or plant.  Confirm before you apply.

Related skill pages we already keep, useful even when the job is a plant or a line rather than a data hall: [electrician pay](/roles/data-center-electrician-salary/), [NFPA 70E](/certifications/nfpa-70e-electrical-safety-standard/), [pipefitter career guide](/guides/pipefitter-data-center-career-guide/), and [travel and per diem](/guides/travel-and-per-diem-construction-work/).

## Texas pay we already hold

These are BLS Occupational Employment and Wage Statistics figures for May 2025, for all employers in each metro, not plant premiums and not data-center premiums.  We already publish them on our Texas market pages.  Overtime, per diem, and travel pay on a construction job can sit well above the median.  We do not invent those adders here.

We do not have a published Houston-Beaumont OEWS row on this site, so we will not pretend a Dallas median is a Baytown or Port Arthur wage.  Use the closest official metro table for southeast Texas, and use Midland or Abilene as the better published benchmark for ERCOT West work such as CPV Basin Ranch, Vistra Permian Power I, or Pecos.

 BLS OEWS May 2025, Dallas-Fort Worth and Austin metros, all industries

  Occupation  Dallas-Fort Worth-Arlington  Austin-Round Rock-San Marcos

  Electricians (47-2111)
 $59,010 median; $38,740 to $81,660 (10th to 90th); 20,930 employed
 $60,390 median; $39,260 to $78,820 (10th to 90th); 7,340 employed
  Plumbers, pipefitters, steamfitters (47-2152)
 $61,250 median; $39,350 to $82,230 (10th to 90th); 11,980 employed
 $62,810 median; $40,810 to $80,920 (10th to 90th); 5,260 employed

 BLS OEWS May 2025, Abilene, Midland and Lubbock metros, all industries

  Occupation  Abilene  Midland  Lubbock

  Electricians (47-2111)
 $47,400 median; $35,900 to $77,190 (10th to 90th); 500 employed
 $59,530 median; $38,960 to $77,950 (10th to 90th); 980 employed
 $47,000 median; $35,130 to $76,920 (10th to 90th); 690 employed
  Plumbers, pipefitters, steamfitters (47-2152)
 $51,790 median; $35,360 to $76,250 (10th to 90th); 320 employed
 $60,700 median; $41,580 to $80,760 (10th to 90th); 510 employed
 $48,950 median; $36,400 to $80,100 (10th to 90th); 550 employed

National context we already publish: electricians, $63,190 median; plumbers, pipefitters, and steamfitters, $63,800; lineworkers (SOC 49-9051), $95,320, with about 10,900 openings a year and 10% projected growth from 2025 to 2035.  See the [electrician salary page](/roles/data-center-electrician-salary/), [roles overview](/roles/), [pay calculator](/tools/data-center-pay-calculator/), and [jobs outlook](/briefs/jobs-outlook/).

## Training and locals

Texas has both union and merit-shop paths.  We already verified the halls and training programs below on our Texas market pages.  Use those pages for the official links and any updates.  Power-plant and line contractors hire from the same locals and JATCs as other industrial work in the region.

- Dallas-Fort Worth electrical work: IBEW Local 20, which runs an apprenticeship program.

- Central Texas electrical work: IBEW Local 520, which posts a jurisdiction map.

- Dallas-area pipe trades: UA Local 100, including a joint apprenticeship.

- Merit-shop craft training in the Austin area: Associated Builders and Contractors, Central Texas chapter.

- Abilene and surrounding electrical work: IBEW Local 681, and the Wichita Falls and Abilene Electrical JATC.

- Texas State Technical College has campuses in Abilene, Sweetwater, and Harlingen, in the same parts of the state as several West Texas and Gulf projects.  TSTC also offers a short data-center maintenance pathway.  That program is one option for career changers, not the standard path into a line crew or a combined-cycle pipe gang.

Details and official links: [North and Central Texas](/markets/north-and-central-texas/), [West Texas](/markets/west-texas/), and the [union versus merit-shop guide](/guides/union-vs-merit-shop-guide/).  Registered programs in other ZIPs can be searched on Apprenticeship.gov from those pages.

## Questions people ask

  Is the Texas Energy Fund actually paying out money? Yes.  As of November 2, 2026, the fund had disbursed $2.08 billion across nine in-ERCOT loan awards totaling about 5,446 MW.  A disbursement is not, by itself, proof that every awarded plant is under construction.

  Is NRG Cedar Bayou 5 under construction? Yes.  Official state materials describe the 721 MW combined-cycle unit in Chambers County, near Baytown, as under construction, with a $562 million Texas Energy Fund loan and a target of coming online in summer 2028.

  Has the Senate permitting bill known as BAAJA passed? No.  The Bipartisan American Affordability and Jobs Act of 2026 is S.5653.  The Senate began debate in mid-November 2026, but cloture on the bill itself was only filed on November 11, and the measure is not law.

  Is the Dow and X-energy project at Seadrift hiring construction crews? Not as a plant under construction.  The Nuclear Regulatory Commission issued a construction permit in the week of November 9 to 12, 2026, for four 80 MW reactors, 320 MW in all.  Dow still has to make a final investment decision.  If it proceeds, construction could begin before 2030.

  What credentials do these sites usually ask for? Expect a trade qualification plus safety training.  Industrial electricians are commonly asked for a license and NFPA 70E.  Welders are often asked for AWS and ASME Section IX or API 1104.  Pipefitters often see ASME B31.3.  On Gulf plant and port sites, NCCER, OSHA 10 or 30, and a TWIC card are common asks, but we do not have a study that counts them, and a transmission job may not use TWIC.

## Sources

One official or major-news source per fact cluster.  Wage tables are the BLS OEWS May 2025 figures we already publish on this site.

- Texas Energy Fund awards, disbursements, megawatts, and named plants: [txenergyfund.texas.gov](https://www.txenergyfund.texas.gov/texas-energy-fund-awards).  Cedar Bayou 5 construction status, loan amount, and summer 2028 target: [Office of the Governor](https://gov.texas.gov/news/post/governor-abbott-announces-texas-energy-fund-loan-to-721-mw-natural-gas-facility-in-southeast-texas).

- Entergy Legend and Lone Star: [Entergy newsroom](https://www.entergy.com/news/entergy-texas-receives-puct-approval-for-two-power-plants-to-support-southeast-texas-growth).

- AEP Texas federal loan: [Reuters, July 8, 2026](https://www.reuters.com/business/energy/aeps-texas-unit-secures-up-326-billion-federal-loan-upgrade-power-grid-2026-07-08/).

- Dow / X-energy Seadrift construction permit: [Texas Tribune, November 12, 2026](https://www.texastribune.org/2026/11/12/nuclear-texas-dow-x-energy-permit-reactors-seadrift/).

- BAAJA (S.5653) and Senate actions: [congress.gov](https://www.congress.gov/bill/119th-congress/senate-bill/5653).

- Metro wages: BLS OEWS May 2025, as compiled on [North and Central Texas](/markets/north-and-central-texas/) and [West Texas](/markets/west-texas/).  National occupation medians and lineworker projections: [roles](/roles/) and [jobs outlook](/briefs/jobs-outlook/).

## Next steps

- [Texas grid projects with signed agreements](/power/texas-grid-projects/): 577 signed ERCOT agreements, 137,409.68 MW.