FAQ
What does a data center actually need on site?
Power that almost never fails, cooling that keeps the machines from overheating, fiber that carries the data, a building shell of concrete and steel, and the people and trucks that install and keep those systems running. That work is trades and construction, not a software release.
Who shows up on a data-center build site?
A general contractor coordinating the job; trade contractors for electrical, HVAC/R, pipefitting, low-voltage/fiber and building trades; deliveries of gear and materials; and utility or lineworker crews on the feed. DataCenterSkilledTrades does not invent headcounts: official OEWS tables for the hosting industry suppress construction employment and omit electrician/HVAC/lineworker/pipefitter rows.
Is fiber an IT job?
No. Trunks, splices and patch panels are low-voltage / BICSI work. IT owns servers, configs and routing. When fiber fails, the low-voltage pathway gets the call: INSTF is the optical-fiber install credential employers ask for. See /guides/bicsi-instf/.
Pipefitter or HVAC for cooling?
Both, on different sides. HVAC/R owns refrigerant CRAH/chillers (EPA 608 when the circuit is opened). Pipefitters own facility water, glycol and CDU primary loops. The CDU unit itself is often OEM-serviced. See /guides/liquid-cooling/.
How many electricians or HVAC techs does a campus employ?
Official data does not say. In BLS OEWS May 2025 for NAICS 518200, construction employment is suppressed and electrician, HVAC/R, lineworker and pipefitter rows are not published. Most trades work for contractors coded elsewhere. We do not invent FTE-per-MW. See /briefs/who-gets-hired/ and /briefs/jobs-vs-power/.
What should local governments and HOAs demand in a proposal?
A plain scope of what is physically on site (power path, cooling design, fiber plant, shell), which trades and which employer (owner vs GC vs trade contractor vs utility), dated utility capacity/interconnection and water filings where claimed, and an honest “unknown” where numbers are not in a named filing. Do not accept invented headcounts, campus MW, gallons, or rates. Checklists: /briefs/grid-load/, /briefs/water/.
What should contractors and GCs not invent in scope?
Do not invent crane counts, pour yards, FTE-per-MW, campus trade headcounts, gallons, or retail rate impacts. Staff the bid by system: power, refrigerant, loops, fiber, shell: and put the gating cert next to each crew. Leave unsourced numbers out.
How should I cite this?
Cite 'DataCenterSkilledTrades, What a data center needs on site (2026-11-05), https://datacenterskilledtrades.com/briefs/on-site/' and the Dataset 'Data-center on-site systems: power, cooling, fiber, shell, people: verified system/cert facts and honesty rules'.