First 90-Days Checklist

A printable plan for your first quarter in a mission-critical facility. Use it beside the First 90 Days guide.

Goal: look hire-ready by day 90. Focus on access, diagrams, MOP discipline, and proof you can work inside change control.

How to use this checklist

Print it or copy it into your notes app. Check items only when you can show evidence: a completed shadow round, a diagram you can redraw from memory, or a MOP you walked without prompts.

Days 1–30 · Orientation and access

  • Complete site safety orientation and badge access without shortcuts.
  • Learn who owns electrical, mechanical, and Cx decisions on your shift.
  • Shadow senior techs on rounds; write down alarm labels you do not know.
  • Locate single-line and cooling flow diagrams for your assigned area.
  • Practice radio etiquette and escalation paths before you need them.
  • Read the site MOP template end to end; note hold points and rollback steps.
  • Confirm LOTO points for one piece of equipment with a qualified person.
  • Ask what “stop work” looks like on this campus and who can call it.

Days 31–60 · Independent rounds with oversight

  • Run rounds with oversight and log readings the way the site expects.
  • Trace one power path from switchgear or UPS to a rack PDU on paper.
  • Trace one cooling path from plant to CRAH/CRAC or CDU serving your area.
  • Participate in a change-window briefing; capture prerequisites and backout.
  • Draft a simple MOP for a low-risk task and have a senior tech mark it up.
  • Review recent incident notes; list what early signals were missed or caught.
  • Confirm EPA 608 / NFPA 70E / site badges required for your seat are current.
  • Build a personal glossary of site acronyms; cross-check the DCST glossary.

Days 61–90 · Prove you can be trusted alone

  • Lead a routine round and hand off cleanly at shift change.
  • Respond to a supervised alarm using the site EOP/SOP path.
  • Submit one improvement: labeling gap, diagram error, or spare missing.
  • Complete a mock interview using the MOP interview prep.
  • Update your resume with mission-critical verbs: isolation, hold point, IST, SOO.
  • Run the Hire-Ready Roadmap and close one credential gap.
  • Compare target metros with Compare Pay by City.
  • Decide whether you are applying to construction Cx, facility ops, or both.

Evidence to keep

Keep copies of completed orientation records, training cards, and redacted examples of logs or MOPs you can discuss. Hiring managers ask for proof, not slogans.

FAQ

Is this checklist site-specific?

No. Adapt it to your campus procedures. Site SOPs always win over a general checklist.

What if I am still on a construction site?

Use the same discipline: drawings, RFIs, hold points, and energization readiness instead of live rounds.

How does this tie to placement?

When you can check most day-61–90 items, file a placement profile with certifications and target metros.

Print and share

Use this page as a working document. Print it, keep it in your locker binder, or paste the checklist into your notes app. Check items only when you can show evidence to a supervisor or interviewer.

Quality bar

Mission-critical sites care about written procedure, hold points, and calm escalation. If a step is unclear, stop and ask. Guessing is how halls go dark.

Related tools

Weekly review prompts

  • What procedure did I follow exactly as written this week?
  • What alarm or RFI taught me something new?
  • Which diagram can I redraw from memory now?
  • Which credential gap still blocks interviews?
  • Who on my shift gives the clearest handoff, and what do they do differently?

Keep answers short and factual. Bring them to one-on-ones or interviews as proof of judgment.

After you finish

Update your resume with mission-critical language, then submit a placement profile. Recruiters need contact details, certifications, target metro, travel willingness, and a current resume.