Electrical
Journeyman Electrician - Testing Technician
RosendinSterling, VASchedule WeekendType Full Time
Pay $62.00 - $76.40
Rosendin is hiring a Journeyman Electrician - Testing Technician in Sterling, VA.
The Electrical Testing Technician is responsible for inspecting, testing, troubleshooting, and verifying performance and safety of electrical equipment, systems, and components.
Perform electrical tests such as insulation resistance, continuity, dielectric, power factor, and functional tests on switchgear, transformers.
Identify electrical faults and equipment failures.
The posting lists more than one location, and this city is one of them.
Key requirements
- Minimum 5 years’ experience in an electrical testing role, with experience performing preventive and predictive electrical maintenance.
- NETA Level II-III and/or NICET Level II-III certifications.
- Minimum 5 years experience managing an operations team.
- OEM Certifications.
Electrical
Senior Electrical Testing Technician
RosendinSterling, VASchedule WeekendType Full Time
Pay $62.00 - $76.40
Rosendin is hiring a Senior Electrical Testing Technician in Sterling, VA.
The Electrical Testing Technician is responsible for inspecting, testing, troubleshooting, and verifying performance and safety of electrical equipment, systems, and components.
Perform electrical tests such as insulation resistance, continuity, dielectric, power factor, and functional tests on switchgear, transformers.
Identify electrical faults and equipment failures.
The posting lists more than one location, and this city is one of them.
Key requirements
- Minimum 5 years’ experience in an electrical testing role, with experience performing preventive and predictive electrical maintenance.
- NETA Level II-III and/or NICET Level II-III certifications.
- Minimum 5 years experience managing an operations team.
- OEM Certifications.
Electrical
Journeyman - Electrical
EverOnMesa, AZType Full Time
Pay Not stated in the posting
EverOn is hiring a Journeyman - Electrical in Mesa, AZ.
The Journeyman should be a outside linemen, inside wiremen, installer technician, electrician, or Master Electrician who has been engaged at the trade for at least five (5) years.
The Journeyman will be responsible for performing journey-level electrical duties in the diagnosis, maintenance and repair of electrical equipment.
RESPONSIBILITIES.
Key requirements
- At least five (5) years of experience in the trade.
- Unlimited Electrical or Contractor's license (required).
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
Electrical
Electrical Apprentice
EverOnMidlothian, TXType Full Time
Pay Not stated in the posting
EverOn is hiring an Electrical Apprentice in Midlothian, TX.
The Electrical Apprentice will be responsible for performing apprentice-level electrical duties in the diagnosis, maintenance.
Rack moves, deployments, and decommissioning.
Security gate repair.
Key requirements
- At least 1 year of experience in the trade.
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
- Ability to stoop, kneel, crouch and crawl using both arms and legs.
Electrical
Journeyman - Electrical
EverOnMidlothian, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a Journeyman - Electrical in Midlothian, TX.
The Journeyman should be a outside linemen, inside wiremen, installer technician, electrician, or Master Electrician who has been engaged at the trade for at least five (5) years.
The Journeyman will be responsible for performing journey-level electrical duties in the diagnosis, maintenance and repair of electrical equipment.
The first requirement listed is: formal training in approved vocational schools in the fundamentals of the trade.
Key requirements
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to pick-up minimum 60 lbs.
- Ability to see at close and distance ranges and the ability to see and correctly distinguish color.
Electrical
Generator Technician
CologixAshburn, VASchedule 24/7Type Full- Time - Temps Plein
Pay $42 - $52 per hour wage
Cologix is hiring a Generator Technician in Ashburn, VA.
The Generator Technician ensures our data center's backup power systems are highly reliable and ready to engage at a moment's notice.
This hands-on role is vital to maintaining 24/7 mission-critical uptime.
The first requirement listed is: 2+ years of hands-on experience with generator maintenance and troubleshooting, preferably in mission critical environments like data.
Key requirements
- 2+ years of hands-on experience with generator maintenance and troubleshooting, preferably in mission critical environments like data.
- Solid understanding of diesel-powered generators and associated equipment (experience with Rolls Royce MTU systems preferred).
- Ability to read and accurately interpret technical manuals, electrical schematics, and mechanical single-line blueprints.
- Familiarity with the operational layout of data center infrastructure, including basic power distribution, ATS, switchgear.
Electrical
Critical Power Systems Specialist, NA
Vantage Data CentersNew Albany, OHType Full Time
Pay $70.00 - $72.00 per hour
Vantage Data Centers is hiring a Critical Power Systems Specialist, NA in New Albany, OH.
The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.
The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.
Perform detailed, specialized maintenance, troubleshooting, and operational tasks within your area of expertise.
Independently manage complex maintenance projects and system enhancements with minimal supervision.
Key requirements
- Minimum 8 years (10+ years preferred) of direct hands-on experience specializing in maintenance.
- Extensive knowledge of maintenance practices and operational standards relevant to your specialization.
- Proven ability to read and interpret technical schematics, blueprints, and operational manuals.
- Strong technical writing capabilities, with experience creating and updating method of procedures (MOPs).
Electrical
Data Center Electrician- 1st shift (Sunday- Wednesday)
CologixColumbus, OHType Full- Time - Temps Plein
Pay $50 - $55 per hour wage
Cologix posted this opening for its Columbus, OH site.
The first requirement listed is: licensed Electrician or equivalent electrical certification required.
Key requirements
- Licensed Electrician or equivalent electrical certification required.
- 5+ years of experience working with electrical systems in mission-critical, industrial, or similar environments.
- Strong knowledge of electrical distribution systems, including UPS, generators, switchgear, and DC power systems.
- Experience with installation, maintenance, and troubleshooting of AC and DC systems.
Electrical
Electrical Journeyman
RosendinCoppell, TXSchedule WeekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring an Electrical Journeyman in Coppell, TX.
This position functions as a Journeyman Electrician for Rosendin; installing new electrical systems while maintaining compliance with national, state, and local electrical codes along with all Rosendin policies and procedures.
Install, repair, maintain, and test commercial and industrial electrical systems in full support of Rosendin safety, operations.
Communicate effectively with Foremen and crew members.
The posting lists more than one location, and this city is one of them.
Key requirements
- State Issued Electrical license, where applicable by state requirement.
- 5 years of Electrical Experience.
- Power, lighting, etc.
- Ability to verify compliance and functionality of installations.
Electrical
Electrician
Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring an Electrician in Phoenix, AZ.
The Licensed Electrician I is responsible for electrical installations, troubleshooting, and maintenance within the commercial and industrial settings.
Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development.
All previous classification requirements must be continually satisfied.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Mechanical and HVAC
Transitioning Military | Critical Facilities (Electrical or Mechanical) | 2026 -2027
Vantage Data CentersAshburn, VASchedule Weekend, on-callType Full Time
Pay $ 40/hour - $70/hour
Vantage Data Centers posted this opening for its Ashburn, VA site.
The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.
The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.
New Albany, OH (Columbus).
New Sites not yet announced.
Key requirements
- Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Mechanical and HVAC
CDU & Mechanical Systems Specialist
CyrusOneAllen, TXType Full Time
Pay Not stated in the posting
CyrusOne is hiring a CDU & Mechanical Systems Specialist in Allen, TX.
Provide guidance and oversight of the operation and maintenance of all mechanical systems critical to the data center’s functioning.
Provide guidance to ensure that all mechanical systems are running efficiently, minimizing downtime.
Develop best practices and procedures for routine inspection, cleaning, troubleshooting.
Key requirements
- Bachelor’s degree in Mechanical Engineering, Facilities Management, or a related field (preferred), Equivalent military, trade school.
- 7+ years of experience in the maintenance and operation of critical mechanical systems.
- Demonstrated expertise in troubleshooting and resolving complex mechanical issues in high-availability environments.
- Strong understanding of energy management and efficiency practices for mechanical systems.
Mechanical and HVAC
Mechanical - HVAC
EverOnDenton, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a Mechanical - HVAC in Denton, TX.
The Journeyman will be responsible for performing journey-level mechanical duties in the diagnosis, maintenance and repair of gasoline, diesel, battery, and electric equipment.
The first requirement listed is: formal training in approved vocational schools in the fundamentals of the trade.
Key requirements
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to pick-up minimum 60 lbs.
- Ability to see at close and distance ranges and the ability to see and correctly distinguish color.
Mechanical and HVAC
Mechanical Apprentice
EverOnRed Oak, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a Mechanical Apprentice in Red Oak, TX.
The Journeyman will be responsible for performing journey-level mechanical duties in the diagnosis, maintenance and repair of gasoline, diesel.
RESPONSIBILITIES.
Break fix of all Electro-mechanical systems (HVAC, Hydronics, Appliances, Rollup doors, dock locks, air compressors, etc.).
Key requirements
- At least one (1) years of experience in the trade.
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
- Ability to stoop, kneel, crouch and crawl using both arms and legs.
Mechanical and HVAC
Journeyman - Mechanical
EverOnMesa, AZType Full Time
Pay Not stated in the posting
EverOn is hiring a Journeyman - Mechanical in Mesa, AZ.
The Journeyman will be responsible for performing journey-level mechanical duties in the diagnosis, maintenance and repair of gasoline, diesel.
RESPONSIBILITIES.
Break fix of all Electro-mechanical systems (HVAC, Hydronics, Appliances, Rollup doors, dock locks, air compressors, etc.).
Key requirements
- At least five (5) years of experience in the trade.
- Unlimited Mechanical or Contractor's license (required).
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
Controls and BMS
SCADA and PLC Service Technician
Faith TechnologiesAtlanta, GASchedule Monday through friday, weekendType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a SCADA and PLC Service Technician in Atlanta, GA.
Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development.
Focus on the deployment of Electrical Power Monitoring Systems (EPMS) and Building Management Systems (BMS) at data center facilities.
Customer-facing position - the successful candidate must work well in a team environment and will interface directly with contractors.
The posting lists more than one location, and this city is one of them.
Key requirements
- Education: Associate’s degree in electrical engineering, with emphasis on control systems.
- Experience: Experience related to Electrical Power Monitoring Systems; Building Automation Systems, Systems Integration.
Controls and BMS
Lead, Automation & Controls Technician, NA
Vantage Data CentersAshburn, VAType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Lead, Automation & Controls Technician, NA in Ashburn, VA.
The Automation Systems Group is responsible for the design, construction and support of cutting-edge data center automation and control infrastructure.
The department collaborates with Operations, Sales, Construction, Engineering, Information Technology and Management to ensure the system continues to fulfill Vantage customer requirements.
Monitor automation systems for power and cooling infrastructure across assigned data center sites.
Assist in diagnosing and resolving issues related to PLCs, HMIs, SCADA, and field devices.
Key requirements
- 3-5 years of experience in Industrial Automation required, 5 to 7 years preferred.
- Data Center experience is strongly preferred, but not required.
- Knowledge of automation systems (control loops, field IO, etc.) in a mission critical environment.
- Advanced Knowledge of PLC programming to include Rockwell Automation and Carel software platform is required.
Controls and BMS
DC Controls Engineer - Colo
Amazon Web Services (AWS)Dallas, TXSchedule On-callType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a DC Controls Engineer - Colo in Dallas, TX.
As part of the global controls team, you will work with highly motivated experts and innovators in the data center industry.
You will be responsible for troubleshooting, project management, and maintaining the building management system (BMS) and electrical power monitoring system (EPMS).
Train and assist internal customers and stakeholders with the creation, design, configuration, validation, installation, commissioning.
Provide technical assistance and support to operations during life cycle of the data center. Review results.
Key requirements
- Experience with Industrial control systems, both hardware and software.
- 4+ years of general contractor and vendor management work.
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 5+ years of relevant.
- 5+ years of experience with industrial controls in critical environment.
Controls and BMS
Data Center Controls Tech
Amazon Web Services (AWS)Manassas, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Controls Tech in Manassas, VA.
As a member of the Global Controls Team, you will collaborate with highly motivated operators, engineers and technicians in the data center industry to maintain and optimize critical infrastructure systems.
AWS data centers utilize sophisticated industrial control systems to automatically operate mechanical equipment, maintaining optimal temperature and pressure conditions throughout the facilities.
The first requirement listed is: high school or equivalent diploma.
Key requirements
- High school or equivalent diploma.
- Associate’s degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
- Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
- 1+ years of experience working with low voltage controls, wiring, networking signals, electrical and mechanical systems, computers.
Controls and BMS
Data Center Controls Tech
Amazon Web Services (AWS)Lithia Springs, GASchedule On-callType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Controls Tech in Lithia Springs, GA.
The candidate will possess technical background and experience in installation, troubleshooting, operations and/or maintenance of field sensors, controllers, wiring, networking and programming associated with the industrial controls systems.
The candidate may also have relevant experience operating and maintaining mission critical electrical and mechanical systems.
Primarily work in and support multiple Data Centers by Deploying, Servicing, and Upgrading BMS and EPMS systems.
Mentor and train Facilities team members on operation and control of the BMS and EPMS systems.
Key requirements
- Walk job-sites in uneven terrain and work at heights and from ladders.
- Regularly walk, use hands and fingers, handle or feel, reach with hands and arms, stoop, kneel, crouch.
- On occasions, lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
- The mission of the Data Center Controls Engineering team is to manage the design, deployment.
Controls and BMS
Data Center Controls Technician
Amazon Web Services (AWS)Avondale, AZType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Controls Technician in Avondale, AZ.
As a member of the Global Controls Team, you will collaborate with highly motivated operators, engineers and technicians in the data center industry to maintain and optimize critical infrastructure systems.
AWS data centers utilize sophisticated industrial control systems to automatically operate mechanical equipment, maintaining optimal temperature and pressure conditions throughout the facilities.
The first requirement listed is: high school or equivalent diploma.
Key requirements
- High school or equivalent diploma.
- Associate's degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
- Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
- 1+ years of experience working with low voltage controls, wiring, networking signals, electrical and mechanical systems, computers.
Controls and BMS
Data Center Controls Engineer
Amazon Web Services (AWS)New Albany, OHSchedule On-callType Full-Time
Pay Range shown on the AWS posting pageOpenings 7 with this title here
Amazon Web Services (AWS) is hiring a Data Center Controls Engineer in New Albany, OH.
As part of the global controls team, you will work with highly motivated experts and innovators in the data center industry.
You will be responsible for troubleshooting, project management, and maintaining the building management system (BMS) and electrical power monitoring system (EPMS).
The first requirement listed is: experience with Industrial control systems, both hardware and software.
Key requirements
- Experience with Industrial control systems, both hardware and software.
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 3+ years of relevant.
- 3+ years of experience with industrial controls in critical environment.
- 2+ years of general project or vendor management experience.
Controls and BMS
Data Center Controls Tech
Amazon Web Services (AWS)Midlothian, TXType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Data Center Controls Tech in Midlothian, TX.
The candidate will possess technical background and experience in installation, troubleshooting, operations and/or maintenance of field sensors, controllers, wiring, networking and programming associated with the industrial controls systems.
The candidate may also have relevant experience operating and maintaining mission critical electrical and mechanical systems.
Primarily work in and support multiple data centers by deploying, servicing, and upgrading BMS and EPMS systems.
Mentor and train Facilities team members on the operation and control of BMS and EPMS systems.
Key requirements
- Walk job-sites in uneven terrain and work at heights and from ladders.
- Regularly walk, use hands and fingers, handle or feel, reach with hands and arms, stoop, kneel, crouch.
- On occasions, lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
- The mission of the Data Center Controls Engineering team is to manage the design, deployment.
Controls and BMS
Senior Controls Engineer
CyrusOneDallas, TXType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Senior Controls Engineer in Dallas, TX.
Serve as the engineering lead and subject matter expert for BMS, EPMS, and related controls systems supporting mission-critical facilities.
Develop, review, and maintain controls design criteria, engineering standards, sequences of operation, controls narratives, points lists.
Support development of controls architecture and ensure designs align with operational, customer, and Engineering requirements.
Key requirements
- Translate customer requirements, operational requirements, and technical standards into clear engineering design criteria.
- Support customer design reviews and participate in technical discussions with hyperscale, enterprise, and colocation customers.
- Coordinate closely with design consultants and Engineers of Record to ensure customer requirements are incorporated into project.
- Participate in projects from pre-construction planning through commissioning and turnover.
Controls and BMS
Controls Technician
Amazon Web Services (AWS)New Albany, OHType Full-Time
Pay Range shown on the AWS posting pageOpenings 4 with this title here
Amazon Web Services (AWS) is hiring a Controls Technician in New Albany, OH.
As a member of the Global Controls Team, you will collaborate with highly motivated operators, engineers and technicians in the data center industry to maintain and optimize critical infrastructure systems.
AWS data centers utilize sophisticated industrial control systems to automatically operate mechanical equipment, maintaining optimal temperature and pressure conditions throughout the facilities.
The first requirement listed is: high school or equivalent diploma.
Key requirements
- High school or equivalent diploma.
- Candidate must meet ITAR compliance.
- Associate’s degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
- Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
Controls and BMS
Systems Engineer Protections and Controls III
RosendinSterling, VAType Full Time
Pay Not stated in the posting
Rosendin is hiring a Systems Engineer Protections and Controls III in Sterling, VA.
Want to be part of the team that design and develop complex power distribution systems for a hyper-scale data center campus?
Have strong problem-solving skills that you can make things work as intended?
Pre-construction design and development of the complete power system protection and control by deploying overcurrent protection relays.
Design and Develop site wide electrical distribution Sequence of Operation that ensures system reliability and resiliency.
Key requirements
- Bachelor’s degree in Electrical Engineering and minimum of 8+ years of engineering design experience in electrical power systems.
- Self-starting, avid learners on new technologies and products.
- Strong understanding on power distribution systems, relaying, automation systems.
- In-depth working knowledge of SEL-751, SEL-787, SEL-487E, SEL-2411, SEL-3350 RTAC, Siemens 7SX82/85, Siemens 7UT, ABB REF615 etc.
Controls and BMS
Data Center Controls Engineer
Amazon Web Services (AWS)Covington, GASchedule On-callType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Controls Engineer in Covington, GA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
As part of the AWS Controls Team, you will work with highly motivated experts and innovators in the data center industry.
Manage scope of Building Management System (BMS) and Electrical Power Monitoring System (EPMS) for construction of AWS data centers.
Ensure data center controls are deployed in accordance with scope of work (SOW) and specifications.
Key requirements
- 4+ years of general contractor and vendor management work.
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 5+ years of relevant.
- 5+ years with industrial controls in critical environment.
Commissioning and QA/QC
Quality Control Engineer
Amazon Web Services (AWS)Herndon, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Quality Control Engineer in Herndon, VA.
The Quality Control Engineer (QCE) plays an essential role in AWS Data Center Capacity Delivery’s (DCCD) Integrated Project Quality (IPQ) program.
This position is responsible for overseeing and executing quality assurance and control (QAQC) processes throughout the lifecycle of data center construction projects, ensuring that all work meets AWS's high standards for quality, safety, and performance.
The first requirement listed is: 4+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
Key requirements
- 4+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
- Bachelor's degree in Electrical Engineering or a related field.
- Knowledge of Microsoft Office including Outlook, Word, and Excel.
- Experience researching new designs, technologies, and construction methods of data center equipment and facilities.
Commissioning and QA/QC
QA/QC Field Technician
Faith TechnologiesAtlanta, GASchedule WeekendType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a QA/QC Field Technician in Atlanta, GA.
The QA/QC Field Engineer is a technical assistant to the field, acting as an internal liaison between the field, Project Management team, Preconstruction Team, and remote support teams.
The QA/QC Field Engineer is expected to attend regular project meetings, support the setup and maintenance of the QA/QC software(s), coordinate internally and with other contractors, and assist the Project Manager with tracking of status, labor, financials.
Lead training needs for technology tools, software applications, and SOP’s.
Understand relational data sets for equipment and feeders and able to generate reports from such data.
Key requirements
- Education: Bachelor of Science in Engineering, Engineering Technology, or Construction Management.
Commissioning and QA/QC
Project Manager, Quality & Commissioning, NA
Vantage Data CentersNew Albany, OHType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Vantage Data Centers is hiring a Project Manager, Quality & Commissioning, NA in New Albany, OH.
The Construction team is responsible for the entire process flow of delivering the physical data centers from shovel ready state through commissioning, working with Sales, Operations, and management along the way.
Construction implements and executes upon the work product developed by the Development & Engineering (D&E) team.
Facilitate the mentoring of core Vantage team members within the area of quality and commissioning process.
Drive knowledge transfer of quality and commissioning procedures to Vantage team members and project stakeholders.
Key requirements
- A Bachelor of Science in either Construction Management, Mechanical, Electrical, Computer Science, or Building Services Engineering.
- 5+ years of experience in Commissioning, Construction Management, Automation Systems or related industries.
- Expected travel is 25%, but may evolve over time.
Commissioning and QA/QC
Commissioning & Reliability Manager
Aligned Data CentersNorthern VirginiaType Full Time
Pay $135,000 - $165,000 a yearOpenings 2 with this title here
Aligned Data Centers is hiring a Commissioning & Reliability Manager in Northern Virginia.
It's fun to work in a company where people truly BELIEVE in what they're doing.
We're committed to bringing passion and customer focus to the business.
Support coordination with third-party Commissioning Agents on assigned projects. Assist with review of scripts/deliverables.
Perform spot checks of field testing and documentation. Help ensure that passing a test requires adherence to the Sequence of Operations (SOO).
Key requirements
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, Facilities Engineering.
- O Minimum of 3-6 years of experience in commissioning, reliability, or mission-critical facilities delivery.
- O Experience supporting Level 4 functional testing and Level 5 Integrated Systems Testing (IST), including readiness tracking.
- O Experience supporting issue management and closeout (Cx log), coordinating corrective actions across trades/vendors.
Commissioning and QA/QC
Quality Manager
RosendinLewisville, TXType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring a Quality Manager in Lewisville, TX.
This position owns the execution of project- and product-specific Quality Plans at the facility level and ensures that quality requirements are defined early, implemented consistently, and verified at each stage of design, procurement, fabrication, assembly.
This role reports to and is functionally managed by the Regional Quality Manager, who provides the overarching Quality Management System (QMS), policies, and guidelines.
Serve as the on-site quality authority, ensuring adherence to corporate and regional Quality Management Systems (QMS).
Approve and maintain facility-level Quality Plans, Inspection & Test Plans (ITPs), and all quality documentation.
Key requirements
- Bachelor’s degree in engineering, Quality, Manufacturing, or a related field (or equivalent experience).
- Minimum 10-12 years of quality experience in manufacturing, fabrication, construction, or industrial assembly environments.
- Experience with modular systems, skid-mounted equipment, enclosures, or industrial integration projects.
- Strong working knowledge of quality systems, inspections, and NCR/CAPA processes.
Commissioning and QA/QC
Commissioning Engineer
Amazon Web Services (AWS)Avondale, AZSchedule WeekendType Full-Time
Pay Range shown on the AWS posting pageOpenings 6 with this title here
Amazon Web Services (AWS) is hiring a Commissioning Engineer in Avondale, AZ.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Are you experienced in Critical Infrastructure Commissioning and looking for a fast paced environment to work in.
Medium and low voltage power systems.
HVAC (Air Handlers / Exhaust Fans / VFD).
Key requirements
- Regularly walk, use hands and fingers, reach with hands and arms, stoop, kneel, crouch or crawl.
- Lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
- Work shifts longer than eight hours in duration with potential for night and weekends.
- Work in environments that are colder or hotter than a normal office environment.
Commissioning and QA/QC
Senior Engineer - Commissioning
CologixColumbus, OHType Full- Time - Temps Plein
Pay $150,000 - $165,000 per year salary
Cologix is hiring a Senior Engineer - Commissioning in Columbus, OH.
Engineer - Commissioning is responsible for directing and/or supporting planning, coordinating, and executing all commissioning activities associated with mission-critical data center projects.
This role ensures that mechanical, electrical, plumbing (MEP), controls, and security are designed, installed, tested, and operated in accordance with project requirements and industry best practices.
Commissioning and QA/QC
Data Center Commissioning Project Manager
Faith TechnologiesPhoenix, AZSchedule Monday - fridayType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a Data Center Commissioning Project Manager in Phoenix, AZ.
The Cx Project Manager responsible for providing general management of electrical and/or specialty systems QAQC and Commissioning scopes of work, as well as successfully managing commissioning and startup schedules.
The ideal candidate must be proficient in the use of a PC and Microsoft Office Suite, must be proficient in the use of Google G-suit, and knowledge of the electrical construction trade is preferred.
Develop the QAQC/Cx scope, schedule, and budget. Reviews outgoing QAQC/Cx estimates with Estimating Department to ensure accuracy. Properly utilizes.
Develop the QAQC/Cx safety plan. Effectively involves internal safety departments to ensure a complete.
Key requirements
- Education: Bachelor’s Degree in Engineering, Construction Management, or equivalent technical training/experience.
- Experience: 5 years of Project Management, Construction Management, Project Engineering.
Commissioning and QA/QC
HV Power Gen Commissioning Engineer
Amazon Web Services (AWS)Atlanta, GASchedule WeekendType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a HV Power Gen Commissioning Engineer in Atlanta, GA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Successful candidates shall be willing to travel and will be based in Herndon VA.
The first requirement listed is: regularly walk, use hands and fingers, reach with hands and arms, stoop, kneel, crouch or crawl.
Key requirements
- Regularly walk, use hands and fingers, reach with hands and arms, stoop, kneel, crouch or crawl.
- Lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
- Work shifts longer than eight hours in duration with potential for night and weekends.
- Work in environments that are colder or hotter than a normal office environment.
Commissioning and QA/QC
Commissioning Engineer
Amazon Web Services (AWS)Dallas, TXSchedule WeekendType Full-Time
Pay Range shown on the AWS posting pageOpenings 13 with this title here
Amazon Web Services (AWS) is hiring a Commissioning Engineer in Dallas, TX.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Are you experienced in Critical Infrastructure Commissioning and looking for a fast paced environment to work in.
Medium and low voltage power systems.
HVAC (Air Handlers / Exhaust Fans / VFD).
Key requirements
- Regularly walk, use hands and fingers, reach with hands and arms, stoop, kneel, crouch or crawl.
- Lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
- Work shifts longer than eight hours in duration with potential for night and weekends.
- Work in environments that are colder or hotter than a normal office environment.
Commissioning and QA/QC
Construction Quality Manager, NA
Vantage Data CentersPhoenix, AZType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Construction Quality Manager, NA in Phoenix, AZ.
The project Construction team is responsible for the project execution, delivering the physical data centers from project planning and design through procurement to construction and commissioning, working with Sales, Operations, and management along the way.
The team manages Vantage’s design and build partners to success through technical feedback and review and actively participates in review of schedule and budget.
Participate in design and specification reviews - Identify quality risks and mitigation strategies - Align quality requirements with procurement.
Enforce QA/QC plans and inspection protocols - Perform first-work inspections and audits - Track.
Key requirements
- 7+ years of construction QA/QC experience (data center or mission critical preferred) - Strong understanding of mechanical, electrical.
Commissioning and QA/QC
Commissioning Engineer II
QTS Data CentersPhoenix, AZSchedule Weekend
Pay Not stated in the posting
QTS Data Centers is hiring a Commissioning Engineer II in Phoenix, AZ.
The Commissioning Engineer II is responsible for but not limited to Level 1, 2, 3, 4 and 5 commissioning of base building systems, security systems, life safety systems, Electrical, Mechanical, and EPMS/BMS systems of a Data Center environment.
This role will oversee, document, and track various aspects of commissioning activities.
The first requirement listed is: Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
The posting lists more than one location, and this city is one of them.
Key requirements
- Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
- Five or more years of work experience in data center engineering, commissioning, project management, or equivalent.
- Background in areas of building maintenance, CCTV and Access control systems, network, telecommunications.
- Ability to travel to other Data Center locations as required.
Commissioning and QA/QC
Electrical Assistant Project Manager - Commissioning
Faith TechnologiesAtlanta, GASchedule Monday - fridayType Full Time
Pay Not stated in the posting
Faith Technologies posted this opening for its Atlanta, GA site.
Commissioning Assistant Project Managers, under the guidance of the Project or Program Manager, are responsible for providing general management for el ectrical and/or specialty systems QAQC and Commissioning sco p es of work.
The ideal candidate must be proficient in the use of a PC and Microsoft Office Suite, and knowledge of the electrical construction trade is preferred.
Contact vendors to obtain materials for construction projects.
Participate in bi-annual performance evaluation process; conducts employee performance reviews in an effective and timely manner.
Key requirements
- Education: Bachelor’s Degree in Construction Management/Electrical Engineering.
- Experience: Minimum of 1-2 years of Project Management, Construction Management, Project Engineering.
Commissioning and QA/QC
Commissioning Associate Project Manager
Faith TechnologiesAtlanta, GAType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a Commissioning Associate Project Manager in Atlanta, GA.
Cx Associate Project Managers are responsible for generating business, providing general management of electrical and/or specialty systems construction projects, and overseeing staff.
The ideal candidate must be proficient in the use of a PC and Microsoft Office Suite, knowledge of Accubid and AutoCAD is preferred, and knowledge of the electrical construction trade is preferred.
Support generation of new business. Networks, establishes, and maintains customer relationships.
Support the development of the QAQC/Cx scope, schedule, and budget. Reviews outgoing QAQC/Cx estimates with Estimating Department to ensure accuracy.
Key requirements
- Education: Bachelor's Degree in Construction Management, or Electrical Engineering, or equivalent technical training.
- Experience: Five years of Project Management, Construction Management, Project Engineering.
Commissioning and QA/QC
Quality Assistant Superintendent
EverOnAtlanta, GA (also Dallas or Chicago)Type Full Time
Pay Not stated in the posting
EverOn is hiring a Quality Assistant Superintendent in Atlanta, Dallas, or Chicago, GA, TX, or IL.
The Quality Assistant Superintendent is responsible for supporting the execution of the Quality Assurance and Quality Control program in the field by assisting with inspections, documentation, deficiency tracking, and system readiness activities.
This role works closely with QA/QC Superintendents, Construction Teams, MEP Teams, Commissioning Personnel, and Trade Partners to ensure installations comply with project specifications, client requirements, and company quality standards.
Support field execution of the QA/QC program for assigned project areas and disciplines.
Assist with inspections of Civil, Structural, Architectural, Mechanical, Electrical, Plumbing, Controls, and Life Safety systems.
Key requirements
- Excellence to enable the transformation of the world.
- Associate’s degree or Bachelor’s degree in Engineering , Construction Management, Quality Management, or related field preferred.
- Equivalent combination of education, technical training, military service, and industry experience may be considered.
- 2-5 years of experience in construction, QA/QC, commissioning, inspections, or related technical disciplines.
Commissioning and QA/QC
Quality Superintendent
EverOnAtlanta, GA (also Dallas or Chicago)Type Full Time
Pay Not stated in the posting
EverOn is hiring a Quality Superintendent in Atlanta, Dallas, or Chicago, GA, TX, or IL.
The Quality Superintendent is responsible for overseeing and executing field quality activities to ensure all construction, MEP systems, and commissioning-related installations comply with project specifications, client requirements, company standards.
This role serves as the primary field quality leader for assigned scopes and areas, ensuring inspections, testing, documentation, and deficiency management activities are completed in accordance with project requirements.
Lead field execution of QA/QC activities for assigned project areas and disciplines.
Verify installations comply with approved drawings, specifications, submittals, manufacturer requirements, and project standards.
Key requirements
- Excellence to enable the transformation of the world.
- Bachelor's degree in Engineering , Construction Management, Quality Management, or related field preferred.
- Equivalent combination of education, military service, technical training, and industry experience may be considered.
- 5-8 years of experience in construction, QA/QC, commissioning, or related technical disciplines.
Commissioning and QA/QC
Commissioning Project Manager I
CyrusOneSterling, VAType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Commissioning Project Manager I in Sterling, VA.
Attend meetings with design, construction, operations, and third party commissioning teams to understand project goals, schedule, and commissioning requirements and to help ensure commissioning activities are completed in alignment with project milestones.
Participate in meetings with design, construction, operations, and third party commissioning teams to support alignment on project objectives.
Review commissioning related documentation, including equipment submittals, shop drawings, test scripts, operating sequences, and turnover materials.
The posting lists more than one location, and this city is one of them.
Key requirements
- Bachelor’s Degree in Mechanical, Electrical Engineering, Computer Science or equivalent work experience.
- 3-5 years of experience in commissioning, construction management, facility operations, startup, testing, project management.
- Experience supporting commissioning, turnover, startup, testing, construction closeout.
- Working knowledge of mechanical, electrical, controls, and critical infrastructure systems.
Commissioning and QA/QC
Data Center Commissioning Project Manager
Faith TechnologiesAtlanta, GASchedule Monday - fridayType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a Data Center Commissioning Project Manager in Atlanta, GA.
The Cx Project Manager responsible for providing general management of electrical and/or specialty systems QAQC and Commissioning scopes of work, as well as successfully managing commissioning and startup schedules.
The ideal candidate must be proficient in the use of a PC and Microsoft Office Suite, must be proficient in the use of Google G-suit, and knowledge of the electrical construction trade is preferred.
Develop the QAQC/Cx scope, schedule, and budget. Reviews outgoing QAQC/Cx estimates with Estimating Department to ensure accuracy. Properly utilizes.
Develop the QAQC/Cx safety plan. Effectively involves internal safety departments to ensure a complete.
Key requirements
- Education: Bachelor’s Degree in Engineering, Construction Management, or equivalent technical training/experience.
- Experience: 5 years of Project Management, Construction Management, Project Engineering.
Commissioning and QA/QC
QTS Commissioning Team
QTS Data CentersGlendale, AZSchedule Weekend
Pay Not stated in the posting
QTS Data Centers is hiring a QTS Commissioning Team in Glendale, AZ.
The Commissioning Engineers I, II, & III are responsible for but not limited to Level 1, 2, 3, 4 and 5 commissioning of base building systems, security systems, life safety systems, Electrical, Mechanical, and EPMS/BMS systems of a Data Center environment.
This role will oversee, document, and track various aspects of commissioning activities.
Assist in all site construction activity and installations, in coordination with QTS Development Team, external construction resources.
Develop comprehensive commissioning plans for Level 1, Level 2, Level 3, Level 4, and Level 5 systems, including connectivity.
Key requirements
- Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
- Five or more years of work experience in data center engineering, commissioning, project management, or equivalent.
- Background in areas of building maintenance, CCTV and Access control systems, network, telecommunications.
- Ability to travel to other Data Center locations as required.
Commissioning and QA/QC
Quality & Reliability Manager
Aligned Data CentersPlano, TXSchedule 24/7Type Full Time
Pay Not stated in the posting
Aligned Data Centers is hiring a Quality & Reliability Manager in Plano, TX.
It's fun to work in a company where people truly BELIEVE in what they're doing.
We're committed to bringing passion and customer focus to the business.
Enforce the project’s QA/QC Policy. Define exactly what a passing installation looks like.
Don’t just track individual issues, identify systemic patterns, quantify risk, and drive closure. When repeat failures occur.
Key requirements
- Minimum 3-6 years experience creating documents used in creating standards for building, testing, repairs, troubleshooting.
- Fluent in technical and common office software.
- Strong oral and written communication skills.
- Ability to prioritize and execute tasks in a fast-paced environment.
Critical facilities operations
Data Center Facility Manager-Nights
Amazon Web Services (AWS)Hampton, GASchedule Night shift, overnight, on-callType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Facility Manager-Nights in Hampton, GA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
We are seeking an Data Center Facility Manager to serve as a technical resource and leader within Amazon data centers.
Oversee all aspects of the data center's critical physical infrastructure. Ensure that all work performed within the space is done to high quality.
Manage teams of 24x7 engineering technicians in all facets of their career.
Key requirements
- 5+ years of in a managerial/supervisory role with 5 or more direct reports experience.
- 3+ years of electrical or mechanical experience.
- 3+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
Critical facilities operations
Clearable Engineering Operations Technician
Amazon Web Services (AWS)Hilliard, OHSchedule 12 hour, rotating shift, on callType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Clearable Engineering Operations Technician in Hilliard, OH.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
The Data Center Engineering Operations Technician (EOT) are Amazon’s front line responders for hands-on electrical and mechanical equipment troubleshooting and operation.
Operate and maintain mechanical and electrical, mechanical, emergency generator, and fire/life safety equipment within the data center.
Troubleshoot of facility and rack-level events within internal SLAs.
Key requirements
- 2+ years of relevant work experience.
- Experience in relevant work.
- Can bend or twist the body into unusual positions while working.
- Can use hands to manipulate small wires and objects.
Critical facilities operations
Data Center Facility Manager
Amazon Web Services (AWS)Mesa, AZSchedule On-call, 24x7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Data Center Facility Manager in Mesa, AZ.
Data Center Facility Manger role acts as Amazon’s front line when it comes to hands-on electrical and mechanical equipment troubleshooting.
Mechanical equipment includes CRAC units, centrifugal chillers, cooling towers/water chemical systems, air handlers and associated systems, pumps, and motors.
Oversee all aspects of the data center's critical physical infrastructure. Ensure that all work performed within the space is done to high quality.
Manage teams of 24x7 engineering technicians in all facets of their career.
Key requirements
- 2+ years of in a managerial/supervisory role with 5 or more direct reports experience.
- 3+ years of in industrial electrical or mechanical systems experience.
- 3+ years of administrative experience including Microsoft Office products experience.
Critical facilities operations
Critical Operations Technician (Night Shift)
STACK InfrastructureLeesburg, VASchedule Night shift, weekend, on-callType Full Time
Pay Not stated in the posting
STACK Infrastructure is hiring a Critical Operations Technician (Night Shift) in Leesburg, VA.
STACK is looking for a Critical Operations Technician (COT) to support a local data center campus.
As a member of STACK’s Critical Operations team, the Critical Operations Technician must possess strong knowledge in maintaining the mechanical, electrical, fire life safety, base building, and other various internal data center systems.
Operate, monitor, maintain, and respond to abnormal conditions in facilities systems. Areas include Electrical, Mechanical, Building Monitoring.
Tracking and trending operational characteristics.
Key requirements
- High school diploma or equivalent.
- Minimum of 3-5 years’ experience in a data center or other related mission-critical operations role.
- Experience working with various Microsoft Office applications and other database housing software.
- Ability to handle a multitude of tasks and work well in stressful situations.
Critical facilities operations
Critical Facilities Engineer, NA
Vantage Data CentersSterling, VASchedule Weekend, on-callType Full Time
Pay $38-55 / hourOpenings 3 with this title here
Vantage Data Centers is hiring a Critical Facilities Engineer, NA in Sterling, VA.
The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.
The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.
Work under limited supervision, both independently and within a team environment.
Manage multiple one-time and/or ongoing projects.
Key requirements
- Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Critical facilities operations
Data Center Chief Engineer - Nights
Amazon Web Services (AWS)Jeffersonville, OHType Full-Time
Pay Range shown on the AWS posting pageOpenings 6 with this title here
Amazon Web Services (AWS) is hiring a Data Center Chief Engineer - Nights in Jeffersonville, OH.
The Data Center Chief Engineer (CE) is responsible for ensuring that all electrical, mechanical, and fire/life safety equipment within the data center is operating at peak efficiency.
This involves both planned preventative maintenance of equipment, daily corrective work, and emergency response to emergent issues.
Oversee the day-to-day operations and maintenance of mechanical and electrical equipment in a data center.
Operate independently with limited direct management.
Key requirements
- Walk job sites in uneven terrain.
- Work at heights and from ladders.
- Regularly lift and/or move up to 39 pounds; and participate in group lifts for 40 pounds or more.
- Coordinate body movements when using tools or equipment.
Critical facilities operations
Critical Operations Technician I
STACK InfrastructurePlano, TXSchedule Weekend, on-callType Full Time
Pay Not stated in the posting
STACK Infrastructure is hiring a Critical Operations Technician I in Plano, TX.
STACK is looking for a Critical Operations Technician (COT) to support a local data center campus.
As a member of STACK’s Critical Operations team, the Critical Operations Technician must possess strong knowledge in maintaining the mechanical, electrical, fire life safety, base building, and other various internal data center systems.
Operate, monitor, maintain, and respond to abnormal conditions in facilities systems. Areas include Electrical, Mechanical, Building Monitoring.
Tracking and trending operational characteristics.
Key requirements
- High school diploma or equivalent.
- Minimum of 1-3 years' experience in a data center or other related mission-critical operations role.
- Experience working with various Microsoft Office applications and other database housing software.
- Ability to handle a multitude of tasks and work well in stressful situations.
Critical facilities operations
Data Center Operations Technician IV
Amazon Web Services (AWS)Plain City, OHSchedule WeekendType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Operations Technician IV in Plain City, OH.
You will perform hands-on work across the full lifecycle of data center IT infrastructure , installing, maintaining, troubleshooting, and decommissioning the servers, racks, and cabling that our customers depend on every day.
Your technical judgment and ability to execute procedures safely and accurately will directly impact customer capacity and service reliability.
Perform procedures on data center IT infrastructure including rack installation and decommission, server deployment, component replacement.
Troubleshoot and resolve hardware and systems issues by gathering data, conducting root cause analysis, documenting findings.
Key requirements
- 2+ years of computer/server hardware troubleshooting experience, or experience related IT.
- 2+ years of computer layer 1/2 networking (including troubleshooting and repair) experience.
- Work flexible schedule including weekends, nights, and holidays.
Critical facilities operations
Data Center Facility Manager II
Amazon Web Services (AWS)New Albany, OHSchedule 24x7Type Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Facility Manager II in New Albany, OH.
Data Center Facility Manger role acts as Amazon’s front line when it comes to hands-on electrical and mechanical equipment troubleshooting.
Mechanical equipment includes CRAC units, centrifugal chillers, cooling towers/water chemical systems, air handlers and associated systems, pumps, and motors.
Oversee all aspects of the data center's critical infrastructure. Ensure that all work performed within the space is done to high quality.
Oversee the safety, security, availability, quality, and performance of the team, while driving a positive customer experience across multiple shift.
Key requirements
- 5+ years of in a managerial/supervisory role with 5 or more direct reports experience.
- 3+ years of electrical or mechanical experience.
- 3+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
Critical facilities operations
Structural Engineer
Amazon Web Services (AWS)Columbus, OHType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Structural Engineer in Columbus, OH.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
The Structural Engineer in Fleet remediation engineering, Civil Structural and Architectural (FRE-CSA) team has the ability to understand the customer demand as well as the technology & business opportunities that exist in order to achieve the organization’s.
Work with a team of multi-disciplinary professionals on a wide variety of conceptual design, build, and retrofit projects at existing data center.
Create, review and release data center structural improvements and designs.
Key requirements
- Experience with the design, construction, operation, or maintenance of mission critical facilities, especially data centers.
- Bachelor's degree or equivalent in Structural Engineering.
- Experience reading and interpreting construction drawings and specifications, or experience reading and writing procedures.
- Travel up to 50% domestic travel with short notice.
Critical facilities operations
Critical Environments Operator I
CyrusOneChandler, AZType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Critical Environments Operator I in Chandler, AZ.
The first requirement listed is: ability to organize, prioritize, and expedite projects from conception to closure.
Key requirements
- Project Leadership - Ability to organize, prioritize, and expedite projects from conception to closure. .
- Problem Identification / Resolution - Ability to identify malfunctions and deviations in equipment performance and control.
- Supervision Required - Ability to interface effectively with managers and more experienced technicians as well as work independently when.
- Decision Making Capability / Impact - Ability to make the best choice with the available information at hand. Experience, training.
Critical facilities operations
Critical Environments Operator IV
CyrusOneSterling, VASchedule Night shift, rotating shift, weekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
CyrusOne is hiring a Critical Environments Operator IV in Sterling, VA.
Perform operations and maintenance activities for critical data center infrastructure, including electrical, mechanical, and HVAC/R systems.
Utilize and maintain the Computerized Maintenance Management System (CMMS) to manage preventive and corrective maintenance activities.
Execute and adhere to approved SOPs, MOPs, EOPs, and MMRs to ensure safe and reliable facility operations.
Critical facilities operations
Critical Facilities Engineer I
FlexentialDouglasville, GASchedule Weekend, on-call, 24x7
Pay $34.00 - 36.00
Flexential is hiring a Critical Facilities Engineer I in Douglasville, GA.
Responsibilities include learning and utilizing skills to perform preventative and corrective maintenance of all electrical, mechanical, and HVAC equipment for all data center(s) assigned and maintaining mission-critical uptime of 99.999% or higher.
Must build and maintain a strong working relationship with the Technical Assistance Associate team (TAC) and provide hands-on training as required.
24x7 facility on-call responsibility.
Monitor and maintain the operations, maintenance, and repair of all mission-critical equipment.
Key requirements
- 1 year of data center experience.
- 1+ years of experience with root cause analysis and troubleshooting/problem solving.
- Experience working with building automation.
- 1+ years of experience within a critical infrastructure environment.
Critical facilities operations
Supervisor, Critical Operations
QTS Data CentersFayetteville, GA
Pay Not stated in the posting
QTS Data Centers is hiring a Supervisor, Critical Operations in Fayetteville, GA.
Critical facilities operations
Facility Manager
CyrusOneChandler, AZType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Facility Manager in Chandler, AZ.
Manage day to day operations of cooling (production & distribution) and electrical systems.
Troubleshoot issues related to the critical infrastructure using test equipment, observation and automation, monitoring and control applications.
Proactively develop and implement maintenance activities to include both critical infrastructure.
Key requirements
- Extensive experience and knowledge of electrical and mechanical equipment and systems operations and maintenance including.
- Cable plant design and management.
- Experience with building automation, monitoring and control systems.
- Energy audits.
Critical facilities operations
OSC Facilities Support Engineer I
QTS Data CentersAshburn, VASchedule WeekendType Full Time
Pay Not stated in the posting
QTS Data Centers is hiring an OSC Facilities Support Engineer I in Ashburn, VA.
The first requirement listed is: AAS or BS degree in Mechanical or Electrical Engineering, or a related field or equivalent professional experience.
The posting mentions weekend work.
The posting lists more than one location, and this city is one of them.
Key requirements
- AAS or BS degree in Mechanical or Electrical Engineering, or a related field or equivalent professional experience.
- Two or more years of experience in a data center or other critical environment.
- One or more years of experience with CMMS, ticketing, and monitoring platforms, such as ScienceLogic, ServiceNow, or similar applications.
- One or more years of experience with monitoring systems such as BMS and EPMS.
Critical facilities operations
Critical Environment Engineer
QTS Data CentersManassas, VASchedule 24x7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Environment Engineer in Manassas, VA.
Provide technical support to all aspects of data center operations including the operation, maintenance.
Assist in all site construction activity and installations, in coordination with QTS Development Team, external construction resources.
Provide technical support for all local customer installations, in coordination with key stakeholders to coordinate site technical solutions.
The posting lists more than one location, and this city is one of them.
Key requirements
- Bachelor’s degree or professional equivalent.
- Five or more years of direct experience with engineering related activities in a technical or critical environment.
- HVAC or critical power certifications or equivalent professional experience.
- Ability to travel up to 50% to other Data Center locations as required.
Critical facilities operations
Critical Environments Operator IV
CyrusOneChandler, AZSchedule 24/7Type Full Time
Pay Not stated in the postingOpenings 3 with this title here
CyrusOne is hiring a Critical Environments Operator IV in Chandler, AZ.
Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.
The first requirement listed is: demonstrated desire to provide the highest levels of customer service.
The posting mentions 24/7 work.
Key requirements
- Demonstrated desire to provide the highest levels of customer service.
- Cheerful and enthusiastic attitude.
- Strong verbal and written communication skills.
- Good problem solving, decision-making skills.
Critical facilities operations
Critical Operations Technician
QTS Data CentersPhoenix, AZSchedule 24x7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Operations Technician in Phoenix, AZ.
The Critical Operations Technician I is responsible for the installation, repair, and maintenance of IT, electrical, mechanical, plumbing/piping equipment, machinery and controls located in the interior and exterior of building.
This role monitors operations and conducts a routine and ongoing assessment of the building systems, operations, and performance.
Apply learning, knowledge, skills, and company policies to a wide range of tasks pertaining to IT, electrical and mechanical equipment, controls.
Leads, maintains, monitors, and performs preventive maintenance on mechanical and electrical equipment; records readings.
Key requirements
- Two or more years of technical training, military training, or workplace equivalency.
- Background in areas of IT, electrical, and/or mechanical.
- Proficiency with MS Office Suite.
- Customer focus with excellent interpersonal skills, and the ability to interface with all levels within the organization.
Critical facilities operations
Critical Operations Technician I
QTS Data CentersAtlanta, GASchedule 24x7Type Full Time
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Operations Technician I in Atlanta, GA.
The Critical Operations Technician I is responsible for the installation, repair, and maintenance of IT, electrical, mechanical, plumbing/piping equipment, machinery and controls located in the interior and exterior of building.
This role monitors operations and conducts a routine and ongoing assessment of the building systems, operations, and performance.
Apply learning, knowledge, skills, and company policies to a wide range of tasks pertaining to IT, electrical and mechanical equipment, controls.
Leads, maintains, monitors, and performs preventive maintenance on mechanical and electrical equipment; records readings.
Key requirements
- Two or more years of technical training, military training, or workplace equivalency.
- Background in areas of IT, electrical, and/or mechanical.
- Proficiency with MS Office Suite.
- Customer focus with excellent interpersonal skills, and the ability to interface with all levels within the organization.
Critical facilities operations
Critical Environments Operator II-7
CyrusOneChandler, AZSchedule 24/7Type Full Time
Pay Not stated in the posting
CyrusOne is hiring a Critical Environments Operator II-7 in Chandler, AZ.
Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.
The first requirement listed is: cheerful and enthusiastic attitude.
The posting mentions 24/7 work.
Key requirements
- Cheerful and enthusiastic attitude.
- Strong verbal and written communication skills.
- Good problem solving, decision-making skills.
- Strong PC skills including word processing and spreadsheets.
Critical facilities operations
Critical Environments Operator III
CyrusOneSterling, VASchedule 12 hour, weekend, on-callType Full Time
Pay Not stated in the postingOpenings 2 with this title here
CyrusOne is hiring a Critical Environments Operator III in Sterling, VA.
Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.
The first requirement listed is: journeyman level skills in electrical, mechanical, HVAC/R disciplines. These skills maybe acquired by obtaining an associate’s degree or in.
The posting mentions 12 hour, weekend, on-call work.
Key requirements
- Journeyman level skills in electrical, mechanical, HVAC/R disciplines. These skills maybe acquired by obtaining an associate’s degree or in.
- 5 to 7 years working in Tier 2, Tier 3 or Tier 4 Data Center(s) or experience in operations & maintenance and/or building engineering roles.
- Familiarity and knowledge of Work Order Control procedures and Computerized Maintenance Management Systems.
- Experienced with subcontractor and vendor contract management.
Critical facilities operations
Critical Environments Operator I
CyrusOneNew Albany, OHType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Critical Environments Operator I in New Albany, OH.
The first requirement listed is: ability to organize, prioritize, and expedite projects from conception to closure.
Key requirements
- Project Leadership - Ability to organize, prioritize, and expedite projects from conception to closure. .
- Problem Identification / Resolution - Ability to identify malfunctions and deviations in equipment performance and control.
- Supervision Required - Ability to interface effectively with managers and more experienced technicians as well as work independently when.
- Decision Making Capability / Impact - Ability to make the best choice with the available information at hand. Experience, training.
Critical facilities operations
Critical Facilities Technician
Aligned Data CentersPlano, TXSchedule 12 hour, weekend, 24x7Type Full Time
Pay $35.00-45.00
Aligned Data Centers is hiring a Critical Facilities Technician in Plano, TX.
It's fun to work in a company where people truly BELIEVE in what they're doing.
We're committed to bringing passion and customer focus to the business.
Maintains, monitors, and performs preventive, predictive, and corrective maintenance on critical and non-critical equipment.
Mechanical areas to include operation and maintenance of multiple components within the HVAC system, plumbing installation/maintenance.
Key requirements
- High school diploma and minimum 3-5 years’ experience in electrical or mechanical critical facilities support.
- Electrical/Mechanical certifications preferred.
- Able to work overtime and longer shifts (12 hour).
- Shifts may require work day/night/weekend/holiday .
Critical facilities operations
Critical Facilities Maintenance Technician
Aligned Data CentersDallas-Fort Worth area, TXSchedule WeekendType Full Time
Pay $35.00 - $45.00/hr
Aligned Data Centers is hiring a Critical Facilities Maintenance Technician in Dallas-Fort Worth area, TX.
It's fun to work in a company where people truly BELIEVE in what they're doing.
We're committed to bringing passion and customer focus to the business.
Under supervision, assist with maintenance of multiple mechanical areas including components within the HVAC system.
Maintain and monitor electronic work-order ticketing system(s) to perform and track all preventive, predictive.
Key requirements
- High school diploma or GED and minimum 2-5 years’ working experience.
- Working knowledge of electrical and/or mechanical critical facilities systems a plus.
- Able to work 40 hours plus occasional overtime.
Critical facilities operations
Critical Facilities Engineer, NA
Vantage Data CentersNew Albany, OHType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Critical Facilities Engineer, NA in New Albany, OH.
The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.
The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.
Work under limited supervision, both independently and within a team environment.
Manage multiple one-time and/or ongoing projects.
Key requirements
- Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Critical facilities operations
Critical Facilities Engineer II
FlexentialNorcross, GASchedule Weekend, on-call, 24x7
Pay $42.00 - $44.00
Flexential is hiring a Critical Facilities Engineer II in Norcross, GA.
Responsibilities for this position include utilizing advanced skills to perform preventative and corrective maintenance of all electrical, mechanical, and HVAC equipment for all data center(s) assigned.
Other responsibilities include vendor management, scheduling and documentation control.
24x7 facility on-call responsibility.
Monitor and maintain the operations, maintenance and repair of all mission-critical equipment.
Key requirements
- 2 Years of data center experience.
- 4+ years of experience with root cause analysis and troubleshooting/problem solving.
- Experience working with building automation.
- 4+ years of experience within a critical infrastructure environment.
Critical facilities operations
Critical Environments Operator IV
CyrusOneNew Albany, OHSchedule 24/7Type Full Time
Pay Not stated in the posting
CyrusOne is hiring a Critical Environments Operator IV in New Albany, OH.
Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.
The first requirement listed is: cheerful and enthusiastic attitude.
The posting mentions 24/7 work.
Key requirements
- Cheerful and enthusiastic attitude.
- Strong verbal and written communication skills.
- Good problem solving, decision-making skills.
- Strong PC skills including word processing and spreadsheets.
Critical facilities operations
Supervisor, Critical Operations
QTS Data CentersAtlanta, GA
Pay Not stated in the posting
QTS Data Centers is hiring a Supervisor, Critical Operations in Atlanta, GA.
The Supervisor, Critical Operations is responsible for the supervision, tactical execution, installation, repair, and maintenance of electrical, mechanical, FLS, plumbing/piping equipment, machinery, and controls located in the interior.
In addition, this person must assist customers on the Data Center floor with their requests, assist with customer installs, and other customer related projects.
Critical facilities operations
Critical Operations Technician I
QTS Data CentersNew Albany, OHSchedule 24x7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Operations Technician I in New Albany, OH.
The Critical Operations Technician I is responsible for the installation, repair, and maintenance of IT, electrical, mechanical, plumbing/piping equipment, machinery and controls located in the interior and exterior of building.
This role monitors operations and conducts a routine and ongoing assessment of the building systems, operations, and performance.
Apply learning, knowledge, skills, and company policies to a wide range of tasks pertaining to IT, electrical and mechanical equipment, controls.
Leads, maintains, monitors, and performs preventive maintenance on mechanical and electrical equipment; records readings.
Key requirements
- Two or more years of technical training, military training, or workplace equivalency.
- Background in areas of IT, electrical, and/or mechanical.
- Proficiency with MS Office Suite.
- Customer focus with excellent interpersonal skills, and the ability to interface with all levels within the organization.
Critical facilities operations
Supervisor, Critical Facilities Operations
NTT Global Data CentersAshburn, VASchedule WeekendType Full Time
Pay $108,900 - $155,600
NTT Global Data Centers is hiring a Supervisor, Critical Facilities Operations in Ashburn, VA.
Supervise the Data Center Technicians and the Facilities Technicians.
Operate and maintains data center in such a condition as to assure the most optimal uptime to customers for facilities services.
Task out the CFOps team in such a way that complies with all local, state, and federal requirements for fire, health and Life Safety.
Key requirements
- Strong background in electrical and mechanical systems design review, layout, installation, commissioning and operations.
- Expert knowledge of low voltage systems, including fire, security and PLCs.
- Expert knowledge of NFPA Electrical, Fire and Life Safety and building codes.
- Expert knowledge of NEC, NFPA 70E, NFPA 72, NFPA 25 and compliance issues.
Critical facilities operations
Supervisor, Critical Facilities Operations
NTT Global Data CentersGainesville, VASchedule WeekendType Full Time
Pay $108,900 - $155,600
NTT Global Data Centers is hiring a Supervisor, Critical Facilities Operations in Gainesville, VA.
Supervise the Data Center Technicians and the Facilities Technicians.
Operate and maintains data center in such a condition as to assure the most optimal uptime to customers for facilities services.
Task out the CFOps team in such a way that complies with all local, state, and federal requirements for fire, health and Life Safety.
Key requirements
- Strong background in electrical and mechanical systems design review, layout, installation, commissioning and operations.
- Expert knowledge of low voltage systems, including fire, security and PLCs.
- Expert knowledge of NFPA Electrical, Fire and Life Safety and building codes.
- Expert knowledge of NEC, NFPA 70E, NFPA 72, NFPA 25 and compliance issues.
Critical facilities operations
Data Center Technician L2
NTT Global Data CentersGarland, TXSchedule WeekendType Full Time
Pay $27.80 - $50.00Openings 3 with this title here
NTT Global Data Centers is hiring a Data Center Technician L2 in Garland, TX.
Key Roles and Responsibilities: Develops creative approaches to keep operational costs to a minimum, improves efficiency, and implements new strategies.
Tests performance of electromechanical assemblies and electronic voltmeters.
The posting mentions weekend work.
Critical facilities operations
Data Center Technician L1
NTT Global Data CentersAshburn, VASchedule WeekendType Full Time
Pay $33.00 - $61.25Openings 3 with this title here
NTT Global Data Centers is hiring a Data Center Technician L1 in Ashburn, VA.
Develop creative approaches to keep operational costs to a minimum, improve efficiency.
Mechanical responsibilities will include chilled water systems and components, HVAC systems such as roof top units, CRAC/CRAH units.
Electrical responsibilities will include electrical/critical power distribution from the Utility/Generator main switchgear through the UPS systems.
Key requirements
- Possess an understanding of the mechanical, electrical, and fire life safety systems used in a data center environment including.
- Knowledge of NEC, NFPA 70E, NFPA 72, NFPA 25, and compliance issues as well as building codes in regard to fire life safety.
- Current knowledge in industrial safety best practices (i.e. lockout/tag out, arc flash protection, OSHA and state regulations).
- Familiarity with data trending / tracking and analysis and the ability to utilize a PC based integrated critical monitoring systems.
Critical facilities operations
Critical Environment Engineer
QTS Data CentersSuwanee, GASchedule 24x7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Environment Engineer in Suwanee, GA.
This role requires work hours to support a 7X24X365 data center environment.
Provide technical support to all aspects of data center operations including the operation, maintenance.
Assist in all site construction activity and installations, in coordination with QTS Development Team, external construction resources.
Key requirements
- Bachelor’s degree or professional equivalent.
- Five or more years of direct experience with engineering related activities in a technical or critical environment.
- HVAC or critical power certifications or equivalent professional experience.
- Ability to travel up to 50% to other Data Center locations as required.
Low voltage and fiber
Installation Technician
Amazon Web Services (AWS)Avondale, AZSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 32 with this title here
Amazon Web Services (AWS) is hiring an Installation Technician in Avondale, AZ.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber
Installation Technician
Amazon Web Services (AWS)Mesa, AZSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 38 with this title here
Amazon Web Services (AWS) is hiring an Installation Technician in Mesa, AZ.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Aldie, VASchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 5 with this title here
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Aldie, VA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber
Infra Delivery Technician
Amazon Web Services (AWS)Wilmer, TXSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 3 with this title here
Amazon Web Services (AWS) is hiring an Infra Delivery Technician in Wilmer, TX.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Traveling within and outside of the regional work area is required.
The first requirement listed is: 1+ years of computer networking experience.
Key requirements
- 1+ years of computer networking experience.
- High school or equivalent diploma.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Avondale, AZSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Avondale, AZ.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Traveling within and outside of the regional work area is required.
The first requirement listed is: regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
- Ascending and descending ladders, stairs, and gangways safely and without limitation.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Garland, TXSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Garland, TX.
Transform network infrastructure by joining our dynamic team.
Infra Delivery Install Technicians will collaborate with cross-functional teams, troubleshoot.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber
Electrical Apprentice/Low Voltage Apprentice
Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time
Pay Not stated in the posting
Faith Technologies is hiring an Electrical Apprentice/Low Voltage Apprentice in Phoenix, AZ.
The Faith Apprentice I is responsible for electrical and specialty systems installations, troubleshooting and maintenance through well-versed knowledge of the National Electric Code (NEC).
Our job site professionals thrive under self-directed management to complete projects safely and on time.
Travel to customer premises to install, maintain, and provide basic troubleshooting of electrical and specialty systems.
Install and bends conduit using manual, mechanical, and hydraulic benders.
Low voltage and fiber
Infra-Delivery Install Technician
Amazon Web Services (AWS)Lithia Springs, GASchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 4 with this title here
Amazon Web Services (AWS) is hiring an Infra-Delivery Install Technician in Lithia Springs, GA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber
Installation Technician
Amazon Web Services (AWS)Aldie, VASchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 5 with this title here
Amazon Web Services (AWS) is hiring an Installation Technician in Aldie, VA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber
Infra-Delivery Install Technician - Night Shift
Amazon Web Services (AWS)Lithia Springs, GASchedule Night shift, 24/7Type Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring an Infra-Delivery Install Technician - Night Shift in Lithia Springs, GA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Construction leadership
Construction Manager
Amazon Web Services (AWS)Avondale, AZType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Construction Manager in Avondale, AZ.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Construction leadership
Construction Manager
Amazon Web Services (AWS)Stafford, VAType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Construction Manager in Stafford, VA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Construction leadership
Construction Manager
Amazon Web Services (AWS)Manassas, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Construction Manager in Manassas, VA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Construction leadership
Construction Manager
Amazon Web Services (AWS)Jeffersonville, OHType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Construction Manager in Jeffersonville, OH.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Construction leadership
Electrical General Foreman
RosendinCoppell, TXSchedule WeekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring an Electrical General Foreman in Coppell, TX.
The General Foreman is responsible for Rosendin; managing the labor, materials and production for electrical construction projects.
Provide technical expertise in installing and troubleshooting electrical wiring and equipment.
Responsible for supervision of all field production activities; provide assistance to the Foreman in planning the job, ordering materials.
Work with appropriate Project Managers and Superintendents to establish project goals at the beginning of the project.
Key requirements
- State Issued Electrical license, where applicable by state requirement.
- 5 years of Electrical Experience.
- A minimum of three to five years of experience working as an Electrical Foreman/General Foreman or in a similar role in electrical.
- Advanced abilities in reading and interpreting electrical plans and specifications with in-depth knowledge of the NFPA codes.
Construction leadership
Electrical Foreman
RosendinCoppell, TXSchedule WeekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring an Electrical Foreman in Coppell, TX.
The Foreman is responsible for monitoring installations and ensuring work is performed according to Rosendin standards and project specifications.
Achieve Rosendin productivity objectives by effectively managing and assigning tasks to crew members.
Establish project goals and monitor success in reaching those objectives on an ongoing basis.
The posting lists more than one location, and this city is one of them.
Key requirements
- State Issued Electrical license, where applicable by state requirement.
- 5 years of Electrical Experience.
- Experience in a Foreman, Superintendent or other electrical leadership role.
Construction leadership
Senior Construction Manager, NA
Vantage Data CentersAtlanta, GAType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Senior Construction Manager, NA in Atlanta, GA.
The Construction team is responsible for the entire process flow of delivering the physical data centers from shovel ready state through commissioning, working with Sales, Operations, and management along the way.
Construction implements and executes upon the work product developed by the Development & Engineering (D&E) team.
This role will be based on-site 5 days/week in Atlanta, GA.
RFP development and overall project budgeting.
Key requirements
- Bachelor of Science in Construction Management, similar field, or equivalent experience.
- Minimum of 7 years of experience in leading construction projects of increasing complexity required, 7-10 years preferred.
- Data Center experience is a plus.
- Multi-prime or alternate procurement delivery experience is preferred.
Construction leadership
Construction Manager
Amazon Web Services (AWS)New Albany, OHType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Construction Manager in New Albany, OH.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Construction leadership
Project Engineer
Amazon Web Services (AWS)New Albany, OHType Full-Time
Pay Range shown on the AWS posting pageOpenings 6 with this title here
Amazon Web Services (AWS) is hiring a Project Engineer in New Albany, OH.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.
As our Data Center Project Engineer, you will support the teams that build some of the most interesting electrical and mechanical systems in the world.
Leading cross-functional communication and coordination between regional general contractors, stakeholders, and internal teams.
Developing and maintaining comprehensive tracking systems for design modifications, RFIs, and change orders.
Key requirements
- 3+ years of vendor management experience.
- 4+ years of relevant work in a data center or other critical environment experience.
- 5+ years of data center engineering or operations experience.
- 5+ years of Microsoft Office including Outlook, Word, and Excel experience.
Construction leadership
MEP Superintendent
EverOnDenton, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a MEP Superintendent in Denton, TX.
We’re the only solutions provider in the data center.
The Quality Superintendent is responsible for overseeing and executing field quality activities to ensure all construction, MEP systems, and commissioning-related installations comply with project specifications, client requirements, company standards.
Lead field execution of QA/QC activities for assigned project areas and disciplines.
Verify installations comply with approved drawings, specifications, submittals, manufacturer requirements, and project standards.
Key requirements
- Bachelor's degree in Engineering, Construction Management, Quality Management, or related field preferred.
- Equivalent combination of education, military service, technical training, and industry experience may be considered.
- 5-8 years of experience in construction, QA/QC, commissioning, or related technical disciplines.
- Experience in mission-critical, hyperscale data center, industrial, healthcare, pharmaceutical.
Construction leadership
Electrical Superintendent
Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring an Electrical Superintendent in Phoenix, AZ.
Licensed Superintendents are responsible for leading our electrical teams on the job site.
Superintendents have a well versed knowledge of the National Electric Code (NEC) and a strong passion for safety, training, leadership development, and commitment to excellence.
All previous classification requirements must be continually satisfied.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Construction leadership
Electrical Foreman
Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring an Electrical Foreman in Phoenix, AZ.
The Licensed Foreman I is responsible for supervising electrical installations, troubleshooting, and maintenance within the commercial and industrial settings.
Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development.
All previous classification requirements must be continually satisfied.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Construction leadership
DC Construction Manager
Amazon Web Services (AWS)Douglasville, GAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a DC Construction Manager in Douglasville, GA.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
The Data Center Construction Manager will be responsible for construction project management and oversight of construction related activities as they relate to new builds or general capital projects which includes the ownership of the project scope, quality.
The first requirement listed is: experience directly related to the design or construction of data centers or critical infrastructure or large-scale mechanical.
Key requirements
- Experience directly related to the design or construction of data centers or critical infrastructure or large-scale mechanical.
- Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure.
- Experience in construction management of large, complex projects involving large-scale mechanical, electrical and plumbing (MEP) plants.
- Experience defining data center system-level architecture, documenting performance and equipment requirements, creating.
Construction leadership
Superintendent II
Faith TechnologiesDallas, TXSchedule Monday through friday, weekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring a Superintendent II in Dallas, TX.
Superintendents are responsible for leading our electrical teams on the job site.
Superintendents have a well versed knowledge of the National Electric Code (NEC) and a strong passion for safety, training, leadership development, and commitment to excellence.
All previous classification requirements must be continually satisfied.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Construction leadership
Construction Manager
Amazon Web Services (AWS)Plain City, OHType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Construction Manager in Plain City, OH.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.
You will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Safety
Health and Safety Manager
Amazon Web Services (AWS)Ashburn, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Health and Safety Manager in Ashburn, VA.
As the Regional Safety Engineer you will own the Health and Safety function of your respective area.
They are working with electrical switching equipment, large scale air handling mechanical systems, and critical IT gear.
The first requirement listed is: Bachelor's degree or equivalent.
Key requirements
- Bachelor's degree or equivalent.
- Experience handling confidential information.
- Knowledge of global environmental, health and safety regulations.
- 3+ years of risk management or safety management experience in industrial, construction, data center, or similar high-hazard environments.
Safety
Health & Safety Manager - LCK
Amazon Web Services (AWS)Hilliard, OHType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Health & Safety Manager - LCK in Hilliard, OH.
As the Regional Safety Engineer you will own the Health and Safety function of your respective area.
They are working with electrical switching equipment, large scale air handling mechanical systems, and critical IT gear.
Implement health and safety standards, policies and practices including but not limited to; safety management systems, training, risk assessments.
Conduct health and safety audits of data centers and active construction sites to ensure compliance with health.
Key requirements
- Bachelor's degree or equivalent.
- Experience handling confidential information.
- Bachelor’s Degree and 4+ years of compliance program management, legal, governance, audit, risk prevention.
- Implement health and safety standards, policies and practices including but not limited to; safety management systems, training.
Safety
Construction Safety Manager
Amazon Web Services (AWS)Jeffersonville, OHType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Construction Safety Manager in Jeffersonville, OH.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Review due diligence risk assessments with real estate, preconstruction, construction operations on H&S aspects of the AWS H&S management program to.
Coordinate with DCPD managers to prioritize H&S in planning and execution in all phases of DCPD projects.
Key requirements
- 5+ years of program or project Management experience.
- 6+ years of construction health & safety experience on active construction projects.
- 2+ years experience leading EHS Programs on construction projects.
- Construction Health & Safety Technician (CHST) Certification OR one of the Preferred Qualification Certifications.