Role · Electrician pay
Data Center Electrician Salary
There is no official BLS table labeled “data center electrician.” Hiring managers still use the all-industries Electricians (SOC 47-2111) wage distribution as the transparent public benchmark, then adjust for shift, travel, and specialty (UPS, generators, medium voltage) in the offer.
Where this trade works
Campus electrical work lives at the UPS, generators, switchgear, PDUs, and the utility interface. Licensed electricians do closely related work inside generating stations, in industrial plants, and on the facility side of substations and interconnection yards. The BLS OEWS electrician wages below already cover those industries, not data halls alone. Read Power and Industrial for plant, grid, and industrial context.
Sourced national wages (BLS OEWS May 2025)
From BLS OEWS national estimates (May 2025):
| Percentile | Annual wage (Electricians, SOC 47-2111) |
|---|---|
| 10th | $42,640 |
| 25th | $49,430 |
| Median (50th) | $63,190 |
| 75th | $83,940 |
| 90th | $108,510 |
Sources: BLS OEWS Electricians (SOC 47-2111); OOH Electricians; live posting example Cologix Data Center Electrician. Pay data reviewed Nov 2026.
Source: BLS OEWS May 2025 national estimates as compiled in the site pay dataset (also mirrored for tooling via O*NET local wages). These figures cover electricians across industries—not hyperscale campuses alone.
Metro medians (O*NET local wages, BLS OEWS May 2025 underlying)
| Metro label | OEWS area used | Median annual |
|---|---|---|
| Ashburn / Northern Virginia | Washington-Arlington-Alexandria, DC-VA-MD-WV | $75,930 |
| Columbus | Columbus, OH | $64,700 |
| Phoenix | Phoenix-Mesa-Chandler, AZ | $61,210 |
| Dallas | Dallas-Fort Worth-Arlington, TX | $59,010 |
| Silicon Valley | San Jose-Sunnyvale-Santa Clara, CA | $91,030 |
Interactive view: data center pay calculator.
What the role owns on a campus
- UPS, generators, switchgear, PDUs, and utility interfaces on the facility side
- Procedure-driven switching and LOTO with NFPA 70E discipline
- Coordination with HVAC, pipefitters, and commissioning during energization
Pathway reading: electrical transition, medium voltage & liquid cooling specialties, first 90 days.
Credentials that show up in hiring
- State electrical license where required
- NFPA 70E
- OSHA 30 General Industry (planning cost on the roadmap tool)
- Optional: medium-voltage switching training, EPSS/generator familiarization
Sequence them on the hire-ready roadmap.
Shift, overtime, and travel (no invented premiums)
Published OEWS medians are base-occupation wages. Data-center employers may add shift differentials, on-call stipends, overtime, or travel per diem. Those adders are employer-specific—confirm in the offer. For travel mechanics, see travel & per diem and the GSA per diem look-up.
How to use these numbers responsibly
- 1. Start with the OEWS median for your metro on the calculator.
- 2. Read the 25th–75th band as a realistic bargaining window for journeyman-level work.
- 3. Treat 90th-percentile figures as senior/specialty territory, not a promise.
- 4. Compare postings that list UPS, generators, or MV explicitly—those often sit higher in the band.
- 5. Do not confuse planning estimates on older site guides with OEWS cells; this page prefers OEWS.
Related occupations for context
- HVAC/R mechanics (SOC 49-9021) — CF HVAC role
- Plumbers/pipefitters (SOC 47-2152) — liquid cooling pipefitter
- Construction managers (SOC 11-9021) — PM salary page
FAQ
Why isn’t there a “data center electrician” OEWS row?
OEWS publishes standard occupations. Employers map facility electrical work to Electricians (47-2111) or related codes. NAICS detail for hosting is often suppressed for this occupation.
Are Silicon Valley wages typical everywhere?
No. San Jose-area medians run well above many inland metros. Always select the metro on the calculator.
Does a license guarantee the median wage?
No. License is often required to be employable; wage depends on market, shift, and scope.
Where do I go next for credentials?
NFPA 70E, roadmap tool, certifications hub.
Bottom Line
Use SOC 47-2111 OEWS May 2025 wages as the honest public baseline, layer employer differentials carefully, and invest in electrical safety credentials that clear site access.
Career progression examples (illustrative titles)
Titles vary by employer. Patterns you will see:
- 1. Apprentice / Tech I — assists on MOPs, pulls wire, learns lockout culture
- 2. Journeyman / Tech II — executes switching under procedure, owns PM routes
- 3. Specialist — UPS, generators, or MV focus
- 4. Lead / Supervisor — directs a crew, interfaces with operations and vendors
- 5. Field engineer / assistant PM — documentation and coordination heavy
Each step still sits on OEWS electrician wages until you are reclassified into a management SOC.
Interview prompts that map to pay bands
- Describe verifying absence of voltage with live-dead-live.
- Walk through transferring load before isolating a UPS input.
- Explain what you do when the MOP and the field labels disagree.
- Name the edition of NFPA 70E you last trained to.
Strong answers matter more than claiming a salary number in the interview.
FAQ
Why isn’t there a “data center electrician” OEWS row?
OEWS publishes standard occupations. Employers map facility electrical work to Electricians (47-2111) or related codes. NAICS detail for hosting is often suppressed for this occupation.
Are Silicon Valley wages typical everywhere?
No. San Jose-area medians run well above many inland metros. Always select the metro on the calculator.
Does a license guarantee the median wage?
No. License is often required to be employable; wage depends on market, shift, and scope.
Where do I go next for credentials?
NFPA 70E, roadmap tool, certifications hub.
Day-to-day work
Construction seats focus on gear setting, terminations, and energization support. Facility seats focus on UPS, generators, switchgear, PDUs/RPPs, EPMS alarms, and tightly controlled maintenance.
How to get hired
Bring license proof, NFPA 70E culture, and examples of LOTO and hold-point discipline. Read the electrical transition pathway and run the roadmap tool.
Mistakes to avoid
Working energized without authorization, skipping verification, and treating EPMS alarms casually. The load is the product.
Internal links: HVAC, roles hub, NFPA 70E, Compare Pay by City.
FAQ
Is the published pay an offer?
No. It is planning context from the page and calculator.
Construction or operations first?
Either path works. Construction builds gear familiarity; operations builds alarm and MOP maturity.
What should I study first?
Site single-lines, LOTO, and the electrical transition guide.