Electrical
Journeyman Electrician - Testing Technician
RosendinSterling, VASchedule Weekend workType Full Time
Pay $62.00 - $76.40
Rosendin is hiring a Journeyman Electrician - Testing Technician in Sterling, VA.
The Electrical Testing Technician is responsible for inspecting, testing, troubleshooting, and verifying performance and safety of electrical equipment, systems, and components.
Perform electrical tests such as insulation resistance, continuity, dielectric, power factor, and functional tests on switchgear, transformers.
Identify electrical faults and equipment failures.
The posting lists more than one location, and this city is one of them.
Key requirements
- Minimum 5 years’ experience in an electrical testing role, with experience performing preventive and predictive electrical maintenance.
- NETA Level II-III and/or NICET Level II-III certifications.
- Minimum 5 years experience managing an operations team.
- OEM Certifications.
Electrical
Senior Electrical Testing Technician
RosendinSterling, VASchedule Weekend workType Full Time
Pay $62.00 - $76.40
Rosendin is hiring a Senior Electrical Testing Technician in Sterling, VA.
The Electrical Testing Technician is responsible for inspecting, testing, troubleshooting, and verifying performance and safety of electrical equipment, systems, and components.
Perform electrical tests such as insulation resistance, continuity, dielectric, power factor, and functional tests on switchgear, transformers.
Identify electrical faults and equipment failures.
The posting lists more than one location, and this city is one of them.
Key requirements
- Minimum 5 years’ experience in an electrical testing role, with experience performing preventive and predictive electrical maintenance.
- NETA Level II-III and/or NICET Level II-III certifications.
- Minimum 5 years experience managing an operations team.
- OEM Certifications.
Mechanical and HVAC
Transitioning Military, Critical Facilities (Electrical or Mechanical)
Vantage Data CentersAshburn, VASchedule Weekend work, on-callType Full Time
Pay $ 40/hour - $70/hour
Vantage is hiring transitioning service members for critical facilities roles, with New Albany, OH among the listed sites.
You would help keep the mechanical and electrical systems in Vantage's data halls running.
The site is staffed 24/7 with critical facility engineers on every shift, so the job includes weekend and on-call work.
Vantage asks for at least 3 years of hands-on maintenance and repair of industrial electrical or mechanical systems.
Key requirements
- Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Controls and BMS
Lead, Automation & Controls Technician, NA
Vantage Data CentersAshburn, VAType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Lead, Automation & Controls Technician, NA in Ashburn, VA.
The Automation Systems Group is responsible for the design, construction and support of cutting-edge data center automation and control infrastructure.
The department collaborates with Operations, Sales, Construction, Engineering, Information Technology and Management to ensure the system continues to fulfill Vantage customer requirements.
Monitor automation systems for power and cooling infrastructure across assigned data center sites.
Assist in diagnosing and resolving issues related to PLCs, HMIs, SCADA, and field devices.
Key requirements
- 3-5 years of experience in Industrial Automation required, 5 to 7 years preferred.
- Data Center experience is strongly preferred, but not required.
- Knowledge of automation systems (control loops, field IO, etc.) in a mission critical environment.
- Advanced Knowledge of PLC programming to include Rockwell Automation and Carel software platform is required.
Controls and BMS
Data Center Controls Tech
Amazon Web Services (AWS)Manassas, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Data Center Controls Tech in Manassas, VA.
As a member of the Global Controls Team, you will collaborate with highly motivated operators, engineers and technicians in the data center industry to maintain and optimize critical infrastructure systems.
AWS data centers utilize sophisticated industrial control systems to automatically operate mechanical equipment, maintaining optimal temperature and pressure conditions throughout the facilities.
The first requirement listed is: high school or equivalent diploma.
Key requirements
- High school or equivalent diploma.
- Associate’s degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
- Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
- 1+ years of experience working with low voltage controls, wiring, networking signals, electrical and mechanical systems, computers.
Controls and BMS
Systems Engineer Protections and Controls III
RosendinSterling, VAType Full Time
Pay Not stated in the posting
Rosendin is hiring a Systems Engineer Protections and Controls III in Sterling, VA.
Pre-construction design and development of the complete power system protection and control by deploying overcurrent protection relays.
Design and Develop site wide electrical distribution Sequence of Operation that ensures system reliability and resiliency.
Key requirements
- Bachelor’s degree in Electrical Engineering and minimum of 8+ years of engineering design experience in electrical power systems.
- Self-starting, avid learners on new technologies and products.
- Strong understanding on power distribution systems, relaying, automation systems.
- In-depth working knowledge of SEL-751, SEL-787, SEL-487E, SEL-2411, SEL-3350 RTAC, Siemens 7SX82/85, Siemens 7UT, ABB REF615 etc.
Commissioning and QA/QC
Quality Control Engineer
Amazon Web Services (AWS)Herndon, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Quality Control Engineer in Herndon, VA.
The Quality Control Engineer (QCE) plays an essential role in AWS Data Center Capacity Delivery’s (DCCD) Integrated Project Quality (IPQ) program.
This position is responsible for overseeing and executing quality assurance and control (QAQC) processes throughout the lifecycle of data center construction projects, ensuring that all work meets AWS's high standards for quality, safety, and performance.
The first requirement listed is: 4+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
Key requirements
- 4+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
- Bachelor's degree in Electrical Engineering or a related field.
- Knowledge of Microsoft Office including Outlook, Word, and Excel.
- Experience researching new designs, technologies, and construction methods of data center equipment and facilities.
Commissioning and QA/QC
Commissioning & Reliability Manager
Aligned Data CentersNorthern VirginiaType Full Time
Pay $135,000 - $165,000 a yearOpenings 2 with this title here
Aligned Data Centers is hiring a Commissioning & Reliability Manager in Northern Virginia.
Support coordination with third-party Commissioning Agents on assigned projects. Assist with review of scripts/deliverables.
Perform spot checks of field testing and documentation. Help ensure that passing a test requires adherence to the Sequence of Operations (SOO).
Key requirements
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, Facilities Engineering.
- Minimum of 3-6 years of experience in commissioning, reliability, or mission-critical facilities delivery.
- Experience supporting Level 4 functional testing and Level 5 Integrated Systems Testing (IST), including readiness tracking.
- Experience supporting issue management and closeout (Cx log), coordinating corrective actions across trades/vendors.
Commissioning and QA/QC
Commissioning Project Manager I
CyrusOneSterling, VAType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Commissioning Project Manager I in Sterling, VA.
Attend meetings with design, construction, operations, and third party commissioning teams to understand project goals, schedule, and commissioning requirements and to help ensure commissioning activities are completed in alignment with project milestones.
Participate in meetings with design, construction, operations, and third party commissioning teams to support alignment on project objectives.
Review commissioning related documentation, including equipment submittals, shop drawings, test scripts, operating sequences, and turnover materials.
The posting lists more than one location, and this city is one of them.
Key requirements
- Bachelor’s Degree in Mechanical, Electrical Engineering, Computer Science or equivalent work experience.
- 3-5 years of experience in commissioning, construction management, facility operations, startup, testing, project management.
- Experience supporting commissioning, turnover, startup, testing, construction closeout.
- Working knowledge of mechanical, electrical, controls, and critical infrastructure systems.
Critical facilities operations
Critical Operations Technician (Night Shift)
STACK InfrastructureLeesburg, VASchedule Night shift, weekend work, on-callType Full Time
Pay Not stated in the posting
STACK Infrastructure is hiring a Critical Operations Technician (Night Shift) in Leesburg, VA.
STACK is looking for a Critical Operations Technician (COT) to support a local data center campus.
As a member of STACK’s Critical Operations team, the Critical Operations Technician must possess strong knowledge in maintaining the mechanical, electrical, fire life safety, base building, and other various internal data center systems.
Operate, monitor, maintain, and respond to abnormal conditions in facilities systems. Areas include Electrical, Mechanical, Building Monitoring.
Tracking and trending operational characteristics.
Key requirements
- High school diploma or equivalent.
- Minimum of 3-5 years’ experience in a data center or other related mission-critical operations role.
- Experience working with various Microsoft Office applications and other database housing software.
- Ability to handle a multitude of tasks and work well in stressful situations.
Critical facilities operations
Critical Facilities Engineer, NA
Vantage Data CentersSterling, VASchedule Weekend work, on-callType Full Time
Pay $38-55 / hourOpenings 3 with this title here
Vantage Data Centers is hiring a Critical Facilities Engineer, NA in Sterling, VA.
The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.
The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.
Work under limited supervision, both independently and within a team environment.
Manage multiple one-time and/or ongoing projects.
Key requirements
- Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Critical facilities operations
Critical Operations Technician I
QTS Data CentersRichmond, VASchedule 24/7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Operations Technician I in Richmond, VA.
The Critical Operations Technician I is responsible for the installation, repair, and maintenance of IT, electrical, mechanical, plumbing/piping equipment, machinery and controls located in the interior and exterior of building.
This role monitors operations and conducts a routine and ongoing assessment of the building systems, operations, and performance.
Apply learning, knowledge, skills, and company policies to a wide range of tasks pertaining to IT, electrical and mechanical equipment, controls.
Leads, maintains, monitors, and performs preventive maintenance on mechanical and electrical equipment; records readings.
Key requirements
- Two or more years of technical training, military training, or workplace equivalency.
- Background in areas of IT, electrical, and/or mechanical.
- Proficiency with MS Office Suite.
- Customer focus with excellent interpersonal skills, and the ability to interface with all levels within the organization.
Critical facilities operations
Critical Facilities Engineer II
FlexentialRichmond, VASchedule Weekend work, on-call, 24/7
Pay $42.00 - $44.00
Flexential is hiring a Critical Facilities Engineer II in Richmond, VA.
The Critical Infrastructure Engineer II is responsible for utilizing advanced skills to perform preventative and corrective maintenance of all electrical, mechanical, and HVAC equipment for all data center(s) assigned.
Other responsibilities include vendor management, scheduling and documentation control.
24x7 facility on-call responsibility.
Monitor and maintain the operations, maintenance and repair of all mission-critical equipment.
Key requirements
- 2 Years of data center experience.
- 4+ years of experience with root cause analysis and troubleshooting/problem solving.
- Experience working with building automation.
- 4+ years of experience within a critical infrastructure environment.
Critical facilities operations
Critical Environments Operator IV
CyrusOneSterling, VASchedule Night shift, rotating shift, weekend workType Full Time
Pay Not stated in the postingOpenings 2 with this title here
CyrusOne is hiring a Critical Environments Operator IV in Sterling, VA.
Perform operations and maintenance activities for critical data center infrastructure, including electrical, mechanical, and HVAC/R systems.
Utilize and maintain the Computerized Maintenance Management System (CMMS) to manage preventive and corrective maintenance activities.
Execute and adhere to approved SOPs, MOPs, EOPs, and MMRs to ensure safe and reliable facility operations.
Critical facilities operations
OSC Facilities Support Engineer I
QTS Data CentersAshburn, VASchedule Weekend workType Full Time
Pay Not stated in the posting
QTS is hiring a facilities support engineer for its Operations Service Center in Suwanee, GA.
You would watch EPMS and BMS alarm dashboards for QTS sites, troubleshoot remotely and run the call when a major incident happens.
The job includes change control, incident reports and escalation under QTS service levels.
The center runs 24/7, so the role is shift work that can include weekends and holidays.
Key requirements
- AAS or BS degree in Mechanical or Electrical Engineering, or a related field or equivalent professional experience.
- Two or more years of experience in a data center or other critical environment.
- One or more years of experience with CMMS, ticketing, and monitoring platforms, such as ScienceLogic, ServiceNow, or similar applications.
- One or more years of experience with monitoring systems such as BMS and EPMS.
Critical facilities operations
Critical Environment Engineer
QTS Data CentersManassas, VASchedule 24/7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Environment Engineer in Manassas, VA.
Provide technical support to all aspects of data center operations including the operation, maintenance.
Assist in all site construction activity and installations, in coordination with QTS Development Team, external construction resources.
Provide technical support for all local customer installations, in coordination with key stakeholders to coordinate site technical solutions.
The posting lists more than one location, and this city is one of them.
Key requirements
- Bachelor’s degree or professional equivalent.
- Five or more years of direct experience with engineering related activities in a technical or critical environment.
- HVAC or critical power certifications or equivalent professional experience.
- Ability to travel up to 50% to other Data Center locations as required.
Critical facilities operations
Critical Environments Operator III
CyrusOneSterling, VASchedule 12 hour, weekend work, on-callType Full Time
Pay Not stated in the postingOpenings 2 with this title here
CyrusOne is hiring a Critical Environments Operator III in Sterling, VA.
Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.
The first requirement listed is: journeyman level skills in electrical, mechanical, HVAC/R disciplines. These skills maybe acquired by obtaining an associate’s degree or in.
The posting mentions 12 hour, weekend, on-call work.
Key requirements
- Journeyman level skills in electrical, mechanical, HVAC/R disciplines. These skills maybe acquired by obtaining an associate’s degree or in.
- 5 to 7 years working in Tier 2, Tier 3 or Tier 4 Data Center(s) or experience in operations & maintenance and/or building engineering roles.
- Familiarity and knowledge of Work Order Control procedures and Computerized Maintenance Management Systems.
- Experienced with subcontractor and vendor contract management.
Critical facilities operations
Critical Environments Operator I
CyrusOneSterling, VASchedule 12 hour, weekend work, on-callType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Critical Environments Operator I in Sterling, VA.
Performing related services such as janitorial tasks, inventory management, and internal departmental tasks as required.
The first requirement listed is: ability to organize, prioritize, and expedite projects from conception to closure.
The posting mentions 12 hour, weekend, on-call work.
Key requirements
- Project Leadership - Ability to organize, prioritize, and expedite projects from conception to closure. .
- Problem Identification / Resolution - Ability to identify malfunctions and deviations in equipment performance and control.
- Supervision Required - Ability to interface effectively with managers and more experienced technicians as well as work independently when.
- Decision Making Capability / Impact - Ability to make the best choice with the available information at hand. Experience, training.
Critical facilities operations
Supervisor, Critical Facilities Operations
NTT Global Data CentersAshburn, VASchedule Weekend workType Full Time
Pay $108,900 - $155,600
NTT Global Data Centers is hiring a Supervisor, Critical Facilities Operations in Ashburn, VA.
Supervise the Data Center Technicians and the Facilities Technicians.
Operate and maintains data center in such a condition as to assure the most optimal uptime to customers for facilities services.
Task out the CFOps team in such a way that complies with all local, state, and federal requirements for fire, health and Life Safety.
Key requirements
- Strong background in electrical and mechanical systems design review, layout, installation, commissioning and operations.
- Expert knowledge of low voltage systems, including fire, security and PLCs.
- Expert knowledge of NFPA Electrical, Fire and Life Safety and building codes.
- Expert knowledge of NEC, NFPA 70E, NFPA 72, NFPA 25 and compliance issues.
Critical facilities operations
Supervisor, Critical Facilities Operations
NTT Global Data CentersGainesville, VASchedule Weekend workType Full Time
Pay $108,900 - $155,600
NTT Global Data Centers is hiring a Supervisor, Critical Facilities Operations in Gainesville, VA.
Supervise the Data Center Technicians and the Facilities Technicians.
Operate and maintains data center in such a condition as to assure the most optimal uptime to customers for facilities services.
Task out the CFOps team in such a way that complies with all local, state, and federal requirements for fire, health and Life Safety.
Key requirements
- Strong background in electrical and mechanical systems design review, layout, installation, commissioning and operations.
- Expert knowledge of low voltage systems, including fire, security and PLCs.
- Expert knowledge of NFPA Electrical, Fire and Life Safety and building codes.
- Expert knowledge of NEC, NFPA 70E, NFPA 72, NFPA 25 and compliance issues.
Critical facilities operations
Data Center Technician L1
NTT Global Data CentersAshburn, VASchedule Weekend workType Full Time
Pay $33.00 - $61.25Openings 3 with this title here
NTT Global Data Centers is hiring a Data Center Technician L1 in Ashburn, VA.
Develop creative approaches to keep operational costs to a minimum, improve efficiency.
Mechanical responsibilities will include chilled water systems and components, HVAC systems such as roof top units, CRAC/CRAH units.
Electrical responsibilities will include electrical/critical power distribution from the Utility/Generator main switchgear through the UPS systems.
Key requirements
- Possess an understanding of the mechanical, electrical, and fire life safety systems used in a data center environment including.
- Knowledge of NEC, NFPA 70E, NFPA 72, NFPA 25, and compliance issues as well as building codes in regard to fire life safety.
- Current knowledge in industrial safety best practices (i.e. lockout/tag out, arc flash protection, OSHA and state regulations).
- Familiarity with data trending / tracking and analysis and the ability to utilize a PC based integrated critical monitoring systems.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Aldie, VASchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 5 with this title here
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Aldie, VA.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Mineral, VASchedule 24/7Type Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Mineral, VA.
Traveling within and outside of the regional work area is required.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Construction leadership
Construction Manager
Amazon Web Services (AWS)Stafford, VAType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Construction Manager in Stafford, VA.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Construction leadership
Construction Manager
Amazon Web Services (AWS)Manassas, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Construction Manager in Manassas, VA.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Key requirements
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
- Experience carrying new design concepts through exploration, development, and into deployment or mass production.
- Experience in MS Excel, Word, and Windows Operating Systems.
- Experience with power management and power monitoring systems.
Safety
Health and Safety Manager
Amazon Web Services (AWS)Ashburn, VAType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a Health and Safety Manager in Ashburn, VA.
As the Regional Safety Engineer you will own the Health and Safety function of your respective area.
They are working with electrical switching equipment, large scale air handling mechanical systems, and critical IT gear.
The first requirement listed is: Bachelor's degree or equivalent.
Key requirements
- Bachelor's degree or equivalent.
- Experience handling confidential information.
- Knowledge of global environmental, health and safety regulations.
- 3+ years of risk management or safety management experience in industrial, construction, data center, or similar high-hazard environments.