Electrical
Senior Facilities Service Manager - Electrical
OracleAbilene, TXSchedule 24/7Type Regular Employee
Pay $126,200 to $264,100 a year (posted U.S. hiring range)
Oracle is hiring a Senior Facilities Service Manager - Electrical in Abilene, TX.
As Senior Facilities Service Manager - Electrical, you will lead the onsite electrical service and maintenance team responsible for the safe, reliable, and disciplined execution of maintenance.
Reporting to the Facility Manager, this role serves as the immediate manager for Facilities Technicians and is accountable for field execution, response readiness, electrical safety, technician development, and service quality across the site.
Lead the onsite electrical facilities technician team responsible for maintenance, troubleshooting, repairs, switching support.
Serve as the direct manager for Electrical Facilities Technicians, providing day-to-day leadership, work prioritization, coaching.
Key requirements
- Strong troubleshooting judgment and disciplined incident response.
- Strong people leadership with the ability to coach technicians and reinforce accountability.
- Proven ability to improve maintenance reliability, field discipline, and service delivery.
- Strong operational judgment in high-risk or time-sensitive environments.
Electrical
Power Plant Maintenance Specialist
SpaceXStarbase, TXSchedule Weekend work
Pay Not stated in the posting
SpaceX is hiring a Power Plant Maintenance Specialist in Starbase, TX.
SpaceX is seeking process operators for its Starbase, TX facility.
Ideally, the operator has experience working with industrial processes that utilize gas/steam turbines, engines, motors, fluid piping, electrical equipment, and instrumented controls.
Identify equipment and process deviations and perform corrective actions.
Troubleshoot, maintain, and calibrate a variety of process equipment including centrifugal and reciprocating compressors, gas analyzers.
Key requirements
- Associate degree in mechanical or electrical engineering technology and 2+ years of experience working with automated processes in one of.
- Control room operations.
- Plant operations.
- Mechanic/millwright support.
Electrical
Staff Electrical Operator
FluidstackAbernathy, TXSchedule On callType Fulltime
Pay $202K to $258K a year
Fluidstack is hiring a staff electrical operator, with Abernathy, TX among the listed locations.
You would operate and troubleshoot 480V to 15kV+ distribution, generators, switchgear and UPS systems in buildings already running AI workloads.
The job covers switching, lockout and tagout and energization to NFPA 70E, often while construction and commissioning continue on the same electrical systems.
You would lead electrical incident response on shift and on call, and write the SOPs, MOPs and EOPs.
Key requirements
- Years of hands-on work on 480V to 15kV+ equipment in hyperscale or large colocation data centers.
- Experience with generators, medium-voltage switchgear, UPS and BMS or EPMS.
- Expert knowledge of NFPA 70E, arc flash and lockout and tagout.
- Shift-based or on-call critical facility experience.
Electrical
Journeyman Electricians
RosendinAmarillo, TXSchedule Weekend workType Full Time
Pay Not stated in the posting
Rosendin is hiring a Journeyman Electricians in Amarillo, TX.
This position functions as a Journeyman Electrician for Rosendin; installing new electrical systems while maintaining compliance with national, state, and local electrical codes along with all Rosendin policies and procedures.
Install, repair, maintain, and test commercial and industrial electrical systems in full support of Rosendin safety, operations.
Communicate effectively with Foremen and crew members.
Key requirements
- State Issued Electrical license, where applicable by state requirement.
- 5 years of Electrical Experience.
- Power, lighting, etc.
- Ability to verify compliance and functionality of installations.
Electrical
Master Electrician
SpaceXStarbase, TXSchedule Weekend work
Pay Not stated in the posting
SpaceX is hiring a Master Electrician in Starbase, TX.
Install or repair any of a variety of electrical equipment such as motor control centers, transformers, switchboards, controllers, circuit breakers.
Preventive maintenance on panels, computer/server rooms and all other aspects of electrical maintenance, repair and troubleshooting.
Determine the location and density of circuitry, evaluate load demand, isolate malfunctions, and incorporate engineering changes.
Key requirements
- High school diploma or equivalency certificate.
- 4+ years of work experience in commercial equipment maintenance and repair.
- Active electrician’s license.
- Must be able to work all shifts and available for overtime, weekends and holiday(s) as needed.
Mechanical and HVAC
HVAC Data Center Journeyman Mechanic (union)
Johnson ControlsLubbock, TXType Full Time
Pay Not stated in the posting
Johnson Controls is hiring a union HVAC journeyman mechanic for data center work, posted out of its Lubbock, TX branch.
The role covers startup, commissioning and aftermarket service on air-cooled and water-cooled chillers, industrial chillers, air handlers and large rooftop units.
You would lead large repairs and retrofits, including centrifugal compressors, absorption chillers and screw chillers.
Johnson Controls provides factory certification through its Service Technical Academy, plus tools, uniforms and a company vehicle.
Key requirements
- Member of, or willing to join, the United Association (UA) of plumbers and pipefitters.
- Hands-on experience with air-cooled and water-cooled chillers, AHUs or large rooftop units.
- Strong HVAC and mechanical troubleshooting.
- Able to lead large, complex repairs and retrofits.
Mechanical and HVAC
Senior Facilities Service Manager - Mechanical
OracleAbilene, TXSchedule 24/7Type Regular Employee
Pay $126,200 to $264,100 a year (posted U.S. hiring range)Openings 11 with this title here
Oracle is hiring a Senior Facilities Service Manager - Mechanical in Abilene, TX.
As Senior Facilities Service Manager - Mechanical, you will lead the onsite mechanical service and maintenance team responsible for the safe, reliable, and efficient operation of mission-critical cooling.
Reporting to the Facility Manager, this role serves as the immediate manager for Facilities Technicians and is accountable for execution quality, service readiness, technician development.
Lead the onsite mechanical facilities technician team responsible for maintenance, troubleshooting, repairs.
Serve as the direct manager for Mechanical Facilities Technicians, providing day-to-day leadership, work prioritization, coaching.
Key requirements
- Strong crisis management and service leadership in high-availability environments.
- Proven ability to improve maintenance quality, service reliability, and execution discipline.
- Strong people leadership with the ability to develop technicians and reinforce accountability.
- Clear communicator who can coordinate across operations, engineering, and vendor teams.
Mechanical and HVAC
Facilities Operations Manager - Mechanical
OracleAbilene, TXSchedule 24/7Type Regular Employee
Pay $102,300 to $209,500 a year (posted U.S. hiring range)
Oracle is hiring a Facilities Operations Manager - Mechanical in Abilene, TX.
As Facilities Operations Manager - Mechanical, you will lead the safe, reliable, and efficient operation of mission-critical mechanical systems supporting OCI data centers.
Reporting to the Senior Critical Facilities Manager, this role owns mechanical plant operations, maintenance execution, vendor performance, operational readiness, and technician leadership across cooling and HVAC infrastructure.
Lead daily operations, maintenance, and service execution for critical mechanical and HVAC infrastructure.
Own mechanical plant readiness, including preventive maintenance, corrective work, inspections, restoration activities.
Key requirements
- 5-8 years of experience in mechanical plant operations, HVAC service, critical cooling maintenance.
- 1-3+ years of experience leading technicians, maintenance teams, or service providers in a live operational environment.
- Strong knowledge of chilled water systems, cooling towers, pumps, CRAHs, AHUs, CDUs, and related controls platforms.
- Experience managing vendors, maintenance programs, incident response, and service execution in 24x7 operations.
Mechanical and HVAC
Staff Mechanical Operator
FluidstackLubbock, TXSchedule Rotating shift, on-callType Fulltime
Pay $202K to $258K a year
Fluidstack is hiring a staff mechanical operator, with Lubbock, TX among the listed locations.
You would be the top mechanical escalation point on shift for chiller plants, CRAC and CRAH units, air handlers, pumps and direct-to-chip liquid cooling loops.
The job covers preventive maintenance from scheduling through vendor supervision and QA, plus root cause analysis on mechanical failures.
You would also write the mechanical SOPs, MOPs and EOPs as new capacity comes online.
Key requirements
- 8+ years of hands-on mechanical or critical facilities operations in data centers.
- Deep knowledge of chillers, cooling towers, CRAC and CRAH units, pumps and hydronic loops.
- Fluency with BMS trends, alarms and fault diagnosis.
- Experience owning root cause analysis and preventive maintenance programs.
Mechanical and HVAC
Mechanical SME, Data Centers
JLLAmarillo, TXSchedule 24/7Type Full Time
Pay Not stated in the posting
JLL is hiring a Mechanical SME, Data Centers in Amarillo, TX.
Oversee HVAC, electrical, and plumbing systems specific to data center operations.
Implement and maintain critical environment protocols and Method of Procedure (MOP) processes.
Conduct regular performance analyses of facility mechanical and electrical systems.
The posting lists more than one location, and this city is one of them.
Key requirements
- Lifting up to 80 lbs.
- Working from heights.
- Frequently climbing, bending, lifting, kneeling, stooping, and working/extending overhead.
- Working in adverse conditions (i.e., extreme cold, extreme hot).
Mechanical and HVAC
HVAC Industrial Mechanic (union) PERMIAN BASIN
Johnson ControlsLubbock, TXType Full Time
Pay Not stated in the posting
Johnson Controls is hiring a union HVAC industrial mechanic for the Permian Basin, posted out of its Lubbock, TX branch.
The job is maintenance, repair and replacement on commercial heating and cooling systems, including rooftop units, pumps, fans, towers, boilers and chillers.
Servicemen may partner with journeymen on centrifugal, steam turbine and open-drive screw chillers.
The posting also lists shaft alignment and vibration work, and Johnson Controls supplies tools, uniforms and a company vehicle.
Key requirements
- Member of, or willing to join, the United Association (UA) of plumbers and pipefitters.
- 3+ years of commercial or industrial HVAC mechanical troubleshooting.
- Experience with rooftop units, pumps, towers, boilers, chillers and compressors.
- Shaft alignment with dial indicators.
Controls and BMS
Controls Engineer - Data Center Operations
FluidstackLubbock, TXType Fulltime
Pay $202K to $258K a year
Fluidstack is hiring a controls engineer for data center operations, with Lubbock, TX among the listed locations.
You would run the BMS, SCADA and EPMS systems that keep live data halls cooled and powered while new halls are still under construction.
The job includes writing operating procedures, alarm response runbooks and control sequences, and fixing controls faults on the floor.
You would also tune setpoints to hold efficiency and reliability targets as load ramps.
Key requirements
- Experience operating controls in live mission-critical data center, industrial or power facilities.
- Deep working knowledge of BMS, SCADA and EPMS platforms.
- Experience writing operating procedures and alarm response runbooks.
- Experience resolving live controls faults under load.
Controls and BMS
Senior Automation Construction Manager, NA
Vantage Data CentersShackelford County, TXType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Senior Automation Construction Manager, NA in Shackelford County, TX.
The Construction team is responsible for the entire process flow of delivering the physical data centers from shovel ready state through commissioning, working with Sales, Operations, and management along the way.
Construction implements and executes upon the work product developed by the Development & Engineering (D&E) team.
Manage project scope, schedule, budget, and execution for automation and controls-related construction activities.
Lead installation and integration of Building Management Systems (BMS), Electrical Power Monitoring Systems (EPMS).
Key requirements
- Bachelor's degree in Engineering, Construction Management, Industrial Automation, Controls Engineering, Mechanical Engineering.
- 7+ years of experience managing automation, controls, industrial systems, HVAC controls, or mission critical construction projects.
- Experience with Building Automation Systems (BAS), Building Management Systems (BMS), and SCADA platforms required.
- Experience with automation control strategies supporting HVAC, cooling plants, environmental conditioning systems.
Commissioning and QA/QC
Staff Commissioning Engineer, Electrical
CrusoeAmarillo, TXType Fulltime
Pay $140,000 to $170,000 a year
Crusoe is hiring a staff electrical commissioning engineer based in Amarillo, TX.
You would be the on-site electrical expert for commissioning and the main escalation point for technical problems on the project.
The work includes reviewing submittals, shop drawings and test procedures, overseeing third-party commissioning agents and witnessing factory tests.
You would approve the Cx plan and Level 2 to Level 5 test scripts, run first-of-kind inspections and drive issues to closure across construction, controls and operations.
Key requirements
- 7+ years in data center commissioning, construction or critical infrastructure delivery.
- Bachelor's degree in electrical engineering or related field, or equivalent commissioning experience.
- Deep knowledge of commissioning Levels 1 to 5 and their documentation.
- Hands-on experience with power distribution and EPMS.
Critical facilities operations
Catalyst Data Center Technician Training Program - Abilene, TX
OracleAbilene, TXSchedule Night shift, weekend workType Temporary Employee
Pay $13.03 to $24.81 an hour (posted U.S. hiring range)
Oracle is hiring for its Catalyst data center technician training program in Abilene, TX.
Oracle says the program is built for people with no prior IT background, including recent high school graduates and people coming from the military, retail, hospitality or construction.
Trainees handle shipping and receiving, inventory and asset records, and safely move and stage equipment.
They also support hardware installation and removal and coordinate with construction, engineering and vendors. Oracle lists it as a temporary position.
Key requirements
- High school diploma or equivalent.
- A strong interest in starting a data center operations career.
- Willingness to learn technical skills and follow processes precisely.
- Basic math and computer skills.
Critical facilities operations
Facility Technician, NA
Vantage Data CentersShackelford County, TXSchedule Monday to Friday, weekend work, on-callType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Facility Technician, NA in Shackelford County, TX.
The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.
The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.
Work both independently and collaboratively within a team environment.
Perform facility maintenance, inspections, troubleshooting, and repair activities across assigned buildings and campus infrastructure.
Key requirements
- Minimum 2+ years of relevant hands-on experience, with 5+ years preferred, in facilities maintenance, commercial building operations.
- Candidates with experience that aligns with Facility Technician Levels II, III, or IV are encouraged to apply.
- The position may be filled under the Facility Technician II, III, or IV job profile based on the selected candidate’s relevant experience.
- Data center or mission-critical facility experience preferred.
Critical facilities operations
Operations & Maintenance Technician II
CrusoeAbilene, TXSchedule 12-hour, rotating shiftType Fulltime
Pay $41 to $47 an hour
Crusoe is hiring an operations and maintenance technician for the power facility at its Abilene, TX campus.
You would operate and maintain a simple cycle generating plant and its auxiliary equipment, including heat recovery steam generators, air compressors and fire suppression.
The job covers troubleshooting and repairing pumps, valves, gearboxes and emissions monitoring (CEMS) equipment, plus routine rounds that log temperatures, vibration, fluid levels and water chemistry.
The posting asks for 12-hour rotating shifts and call-ins as needed.
Key requirements
- High school diploma or equivalent.
- Working knowledge of power plant operations and sound judgment in emergencies.
- Able to read mechanical drawings, electrical one-lines, logic drawings and P&IDs.
- Able to troubleshoot mechanical, instrumentation and electrical equipment.
Critical facilities operations
Facility Operator
FluidstackLubbock, TXType Fulltime
Pay $140K to $200K a year
Fluidstack is hiring a facility operator, with Lubbock, TX among the listed locations.
You would be the on-site expert for the site's power and cooling infrastructure and handle escalations across the data halls and support systems.
The job includes running change management for high-risk maintenance, auditing partner and vendor maintenance programs and acting as first responder when something fails.
Fluidstack's Abernathy campus north of Lubbock is its West Texas site.
Key requirements
- Experience operating or leading critical facilities operations in a live data center.
- Working knowledge of data center power and cooling systems.
- Experience with change management, MOPs and EOPs.
- Calm incident response, including off-hours.
Critical facilities operations
Control Room Operator
CrusoeAbilene, TXType Fulltime
Pay $50 to $58 an hour
Crusoe is hiring a control room operator for the power facility at its Abilene, TX campus.
This senior role coordinates all on-shift plant operations, from cold startups to emergency response during plant upsets.
You would run equipment from the distributed control system (DCS), adjust operating parameters and make calls on non-routine technical problems with limited supervision.
The role also covers chemical analysis on steam, cooling and condensate systems, lockout and tagout, and compliance with local, state and federal rules.
Key requirements
- Generally 10+ years of directly related power plant experience.
- Experience with DCS operation, test equipment and plant control software.
- Strong mechanical aptitude and a working grasp of chemistry, physics and electricity.
- Able to lift up to 50 pounds and climb.
Critical facilities operations
Data Center Technician
SpaceXStarbase, TXSchedule Weekend work, on-call
Pay Not stated in the posting
SpaceX is hiring a Data Center Technician in Starbase, TX.
Monitor and resolve networking, compute and rack power distribution infrastructure incidents in multiple data centers.
Manage complete lifecycle for data center hardware including selection, deployment, operation, maintenance and decommission.
Physically rack and cable data center equipment.
Key requirements
- High school diploma or equivalency certificate.
- Professional experience working in a data center environment or with enterprise grade IT hardware.
- Willingness to work overtime hours and weekends as needed.
- Willing to participate in after-hours on-call rotation.
Low voltage and fiber
Security Systems Technician
FluidstackLubbock, TXType Fulltime
Pay $109K to $128K a year
Fluidstack is hiring a security systems technician, with Lubbock, TX among the listed locations.
You would keep the campus's cameras, card readers, door controllers, intercoms and the servers and switches behind them online and reporting.
The job includes terminating, testing and certifying copper and fiber cabling and troubleshooting from the device up through PoE, ports and VLANs.
You would also repair failed drives, power supplies and optics and hold integrators to the spec on punch lists.
Key requirements
- Experience maintaining security devices at data center scale.
- Able to terminate, test and certify copper and fiber cabling.
- Hands-on work in a live data center or other critical facility.
- Network troubleshooting skills, including PoE, VLANs and DHCP.
Low voltage and fiber
Fiber Supervisor
SpaceXStarbase, TXSchedule Weekend work
Pay Not stated in the posting
SpaceX is hiring a Fiber Supervisor in Starbase, TX.
As a Fiber Supervisor at SpaceX’s Starbase data center, you’ll lead the fiber optic installation and maintenance teams that keep critical network infrastructure online.
Working onsite with project management and superintendents, you’ll plan work, direct technicians, and own quality, safety, and schedule on datacenter fiber projects.
Supervise fiber technicians through all phases of datacenter installation projects, in coordination with the Project Manager and Superintendent.
Assign daily work, set priorities, and track progress so installations, splices, and repairs finish on schedule and to standard.
Key requirements
- High school diploma or equivalency certificate.
- 3+ years of direct data center experience installing and routing optical fiber in large-scale Tier 3 or 4 facilities as a commercial fiber.
- 2+ years of experience supervising or leading fiber optic technicians on commercial or data center installation projects.
- Work is often performed in tight quarters and physical dexterity is necessary to perform job functions.
Construction leadership
Senior Project Engineer, NA
Vantage Data CentersShackelford County, TXType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Vantage Data Centers is hiring a Senior Project Engineer, NA in Shackelford County, TX.
In partnership with Development & Engineering (D&E), the team is a key contributor to the development of project strategies, plans, and technical solutions, providing delivery expertise throughout planning, design, procurement, construction, and commissioning.
Project Delivery leads project execution and is responsible for project performance, cost, and schedule from initial design through turnover to Operations.
Lead and develop Vantage team members to include third-party project resources.
Key requirements
- Bachelor’s degree in construction management, or similar field, or equivalent experience.
- 3+ years of experience as a project engineer in assisting or supervising construction projects of increasing complexity required.
- Experience in CSA (civil, structural, architectural) and/or MEP (mechanical, electrical, plumbing) construction management is a requirement.
- Complex and technical construction experience is required.
Construction leadership
Construction Manager, NA
Vantage Data CentersShackelford County, TXType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Construction Manager, NA in Shackelford County, TX.
The Construction team is responsible for the entire process flow of delivering the physical data centers from shovel ready state through commissioning, working with Sales, Operations, and management along the way.
Construction implements and executes upon the work product developed by the Development & Engineering (D&E) team.
Lead and develop Vantage team members to include third-party project resources.
Key requirements
- Bachelor’s degree in construction management, or similar field, or equivalent experience.
- 5+ years of experience as a project engineer in assisting or supervising construction projects of increasing complexity required.
- Experience in CSA (civil, structural, architectural) and/or MEP (mechanical, electrical, plumbing) construction management is a requirement.
- Complex and technical construction experience is required.
Safety
Health, Safety, and Environmental (HSE) Specialist, Power Operations
CrusoeAbilene, TXType Fulltime
Pay $95,000 to $115,000 a year
Crusoe is hiring a health, safety and environmental (HSE) specialist for its power operations team in Abilene, TX.
The job is to find the real risks in day-to-day plant work and turn them into action plans, procedures, checklists and training.
You would monitor compliance with federal and state rules and Crusoe policy, support audits, and lead incident investigations and root cause analysis.
You would also follow corrective actions through to closure and deal with contractors, clients and regulators on HSE issues.
Key requirements
- 5+ years of relevant industry experience, preferably in oil and gas, refineries, power generation or other heavy industry.
- Working knowledge of federal and state HSE rules and hands-on experience putting them into practice.
- Strong written and verbal communication.
- Comfort with HSE management and reporting software.
Safety
Environment, Health and Safety (EHS) Manager - Data Center Operations
OracleAbilene, TXType Regular Employee
Pay $91,400 to $187,000 a year (posted U.S. hiring range)
Oracle posted this opening for its Abilene, TX site.
We are seeking an experienced EHS Manager who will work onsite in one of the following locations: Abilene, TX, Santa Teresa, NM, Saline, MI, or Port Washington, WI to lead EHS execution across hyperscale data center operations.
This role will directly manage a team of EHS Specialists and partner closely with Data Center Operations, Construction, and Facilities teams to ensure consistent application of EHS standards and regulatory compliance.
Lead, coach, and develop a team of EHS Specialists supporting hyperscale data centers.
Establish clear performance expectations, goals, and accountability measures.
Key requirements
- Lockout/Tagout (LOTO).
- Arc Flash / Electrical Safety.
- Contractor Safety Management.
- High-risk work controls.