Electrical
Electrical Apprentice
EverOnMidlothian, TXType Full Time
Pay Not stated in the posting
EverOn is hiring an Electrical Apprentice in Midlothian, TX.
The Electrical Apprentice will be responsible for performing apprentice-level electrical duties in the diagnosis, maintenance.
Rack moves, deployments, and decommissioning.
Security gate repair.
Key requirements
- At least 1 year of experience in the trade.
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
- Ability to stoop, kneel, crouch and crawl using both arms and legs.
Electrical
Journeyman - Electrical
EverOnMidlothian, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a Journeyman - Electrical in Midlothian, TX.
The Journeyman should be a outside linemen, inside wiremen, installer technician, electrician, or Master Electrician who has been engaged at the trade for at least five (5) years.
The Journeyman will be responsible for performing journey-level electrical duties in the diagnosis, maintenance and repair of electrical equipment.
The first requirement listed is: formal training in approved vocational schools in the fundamentals of the trade.
Key requirements
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to pick-up minimum 60 lbs.
- Ability to see at close and distance ranges and the ability to see and correctly distinguish color.
Electrical
Electrical Journeyman
RosendinCoppell, TXSchedule WeekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring an Electrical Journeyman in Coppell, TX.
This position functions as a Journeyman Electrician for Rosendin; installing new electrical systems while maintaining compliance with national, state, and local electrical codes along with all Rosendin policies and procedures.
Install, repair, maintain, and test commercial and industrial electrical systems in full support of Rosendin safety, operations.
Communicate effectively with Foremen and crew members.
The posting lists more than one location, and this city is one of them.
Key requirements
- State Issued Electrical license, where applicable by state requirement.
- 5 years of Electrical Experience.
- Power, lighting, etc.
- Ability to verify compliance and functionality of installations.
Mechanical and HVAC
CDU & Mechanical Systems Specialist
CyrusOneAllen, TXType Full Time
Pay Not stated in the posting
CyrusOne is hiring a CDU & Mechanical Systems Specialist in Allen, TX.
Provide guidance and oversight of the operation and maintenance of all mechanical systems critical to the data center’s functioning.
Provide guidance to ensure that all mechanical systems are running efficiently, minimizing downtime.
Develop best practices and procedures for routine inspection, cleaning, troubleshooting.
Key requirements
- Bachelor’s degree in Mechanical Engineering, Facilities Management, or a related field (preferred), Equivalent military, trade school.
- 7+ years of experience in the maintenance and operation of critical mechanical systems.
- Demonstrated expertise in troubleshooting and resolving complex mechanical issues in high-availability environments.
- Strong understanding of energy management and efficiency practices for mechanical systems.
Mechanical and HVAC
Mechanical - HVAC
EverOnDenton, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a Mechanical - HVAC in Denton, TX.
The Journeyman will be responsible for performing journey-level mechanical duties in the diagnosis, maintenance and repair of gasoline, diesel, battery, and electric equipment.
The first requirement listed is: formal training in approved vocational schools in the fundamentals of the trade.
Key requirements
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to pick-up minimum 60 lbs.
- Ability to see at close and distance ranges and the ability to see and correctly distinguish color.
Mechanical and HVAC
Mechanical Apprentice
EverOnRed Oak, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a Mechanical Apprentice in Red Oak, TX.
The Journeyman will be responsible for performing journey-level mechanical duties in the diagnosis, maintenance and repair of gasoline, diesel.
RESPONSIBILITIES.
Break fix of all Electro-mechanical systems (HVAC, Hydronics, Appliances, Rollup doors, dock locks, air compressors, etc.).
Key requirements
- At least one (1) years of experience in the trade.
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
- Ability to stoop, kneel, crouch and crawl using both arms and legs.
Controls and BMS
DC Controls Engineer - Colo
Amazon Web Services (AWS)Dallas, TXSchedule On-callType Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring a DC Controls Engineer - Colo in Dallas, TX.
As part of the global controls team, you will work with highly motivated experts and innovators in the data center industry.
You will be responsible for troubleshooting, project management, and maintaining the building management system (BMS) and electrical power monitoring system (EPMS).
Train and assist internal customers and stakeholders with the creation, design, configuration, validation, installation, commissioning.
Provide technical assistance and support to operations during life cycle of the data center. Review results.
Key requirements
- Experience with Industrial control systems, both hardware and software.
- 4+ years of general contractor and vendor management work.
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 5+ years of relevant.
- 5+ years of experience with industrial controls in critical environment.
Controls and BMS
Data Center Controls Tech
Amazon Web Services (AWS)Midlothian, TXType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Data Center Controls Tech in Midlothian, TX.
The candidate will possess technical background and experience in installation, troubleshooting, operations and/or maintenance of field sensors, controllers, wiring, networking and programming associated with the industrial controls systems.
The candidate may also have relevant experience operating and maintaining mission critical electrical and mechanical systems.
Primarily work in and support multiple data centers by deploying, servicing, and upgrading BMS and EPMS systems.
Mentor and train Facilities team members on the operation and control of BMS and EPMS systems.
Key requirements
- Walk job-sites in uneven terrain and work at heights and from ladders.
- Regularly walk, use hands and fingers, handle or feel, reach with hands and arms, stoop, kneel, crouch.
- On occasions, lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
- The mission of the Data Center Controls Engineering team is to manage the design, deployment.
Controls and BMS
Senior Controls Engineer
CyrusOneDallas, TXType Full Time
Pay Not stated in the posting
CyrusOne is hiring a Senior Controls Engineer in Dallas, TX.
Serve as the engineering lead and subject matter expert for BMS, EPMS, and related controls systems supporting mission-critical facilities.
Develop, review, and maintain controls design criteria, engineering standards, sequences of operation, controls narratives, points lists.
Support development of controls architecture and ensure designs align with operational, customer, and Engineering requirements.
Key requirements
- Translate customer requirements, operational requirements, and technical standards into clear engineering design criteria.
- Support customer design reviews and participate in technical discussions with hyperscale, enterprise, and colocation customers.
- Coordinate closely with design consultants and Engineers of Record to ensure customer requirements are incorporated into project.
- Participate in projects from pre-construction planning through commissioning and turnover.
Controls and BMS
Systems Engineer Protections and Controls III
RosendinDallas, TXType Full Time
Pay Not stated in the posting
Rosendin is hiring a Systems Engineer Protections and Controls III in Dallas, TX.
Want to be part of the team that design and develop complex power distribution systems for a hyper-scale data center campus?
Have strong problem-solving skills that you can make things work as intended?
Pre-construction design and development of the complete power system protection and control by deploying overcurrent protection relays.
Design and Develop site wide electrical distribution Sequence of Operation that ensures system reliability and resiliency.
Key requirements
- Bachelor’s degree in Electrical Engineering and minimum of 8+ years of engineering design experience in electrical power systems.
- Self-starting, avid learners on new technologies and products.
- Strong understanding on power distribution systems, relaying, automation systems.
- In-depth working knowledge of SEL-751, SEL-787, SEL-487E, SEL-2411, SEL-3350 RTAC, Siemens 7SX82/85, Siemens 7UT, ABB REF615 etc.
Commissioning and QA/QC
Quality Manager
RosendinLewisville, TXType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring a Quality Manager in Lewisville, TX.
This position owns the execution of project- and product-specific Quality Plans at the facility level and ensures that quality requirements are defined early, implemented consistently, and verified at each stage of design, procurement, fabrication, assembly.
This role reports to and is functionally managed by the Regional Quality Manager, who provides the overarching Quality Management System (QMS), policies, and guidelines.
Serve as the on-site quality authority, ensuring adherence to corporate and regional Quality Management Systems (QMS).
Approve and maintain facility-level Quality Plans, Inspection & Test Plans (ITPs), and all quality documentation.
Key requirements
- Bachelor’s degree in engineering, Quality, Manufacturing, or a related field (or equivalent experience).
- Minimum 10-12 years of quality experience in manufacturing, fabrication, construction, or industrial assembly environments.
- Experience with modular systems, skid-mounted equipment, enclosures, or industrial integration projects.
- Strong working knowledge of quality systems, inspections, and NCR/CAPA processes.
Commissioning and QA/QC
Commissioning Engineer
Amazon Web Services (AWS)Dallas, TXSchedule WeekendType Full-Time
Pay Range shown on the AWS posting pageOpenings 13 with this title here
Amazon Web Services (AWS) is hiring a Commissioning Engineer in Dallas, TX.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Are you experienced in Critical Infrastructure Commissioning and looking for a fast paced environment to work in.
Medium and low voltage power systems.
HVAC (Air Handlers / Exhaust Fans / VFD).
Key requirements
- Regularly walk, use hands and fingers, reach with hands and arms, stoop, kneel, crouch or crawl.
- Lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
- Work shifts longer than eight hours in duration with potential for night and weekends.
- Work in environments that are colder or hotter than a normal office environment.
Commissioning and QA/QC
Quality & Reliability Manager
Aligned Data CentersPlano, TXSchedule 24/7Type Full Time
Pay Not stated in the posting
Aligned Data Centers is hiring a Quality & Reliability Manager in Plano, TX.
It's fun to work in a company where people truly BELIEVE in what they're doing.
We're committed to bringing passion and customer focus to the business.
Enforce the project’s QA/QC Policy. Define exactly what a passing installation looks like.
Don’t just track individual issues, identify systemic patterns, quantify risk, and drive closure. When repeat failures occur.
Key requirements
- Minimum 3-6 years experience creating documents used in creating standards for building, testing, repairs, troubleshooting.
- Fluent in technical and common office software.
- Strong oral and written communication skills.
- Ability to prioritize and execute tasks in a fast-paced environment.
Critical facilities operations
Critical Operations Technician I
STACK InfrastructurePlano, TXSchedule Weekend, on-callType Full Time
Pay Not stated in the posting
STACK Infrastructure is hiring a Critical Operations Technician I in Plano, TX.
STACK is looking for a Critical Operations Technician (COT) to support a local data center campus.
As a member of STACK’s Critical Operations team, the Critical Operations Technician must possess strong knowledge in maintaining the mechanical, electrical, fire life safety, base building, and other various internal data center systems.
Operate, monitor, maintain, and respond to abnormal conditions in facilities systems. Areas include Electrical, Mechanical, Building Monitoring.
Tracking and trending operational characteristics.
Key requirements
- High school diploma or equivalent.
- Minimum of 1-3 years' experience in a data center or other related mission-critical operations role.
- Experience working with various Microsoft Office applications and other database housing software.
- Ability to handle a multitude of tasks and work well in stressful situations.
Critical facilities operations
Critical Environment Engineer
QTS Data CentersFort Worth, TXSchedule 24x7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Environment Engineer in Fort Worth, TX.
Provide technical support to all aspects of data center operations including the operation, maintenance.
Assist in all site construction activity and installations, in coordination with QTS Development Team, external construction resources.
Provide technical support for all local customer installations, in coordination with key stakeholders to coordinate site technical solutions.
The posting lists more than one location, and this city is one of them.
Key requirements
- Bachelor’s degree or professional equivalent.
- Five or more years of direct experience with engineering related activities in a technical or critical environment.
- HVAC or critical power certifications or equivalent professional experience.
- Ability to travel up to 50% to other Data Center locations as required.
Critical facilities operations
Critical Facilities Technician
Aligned Data CentersPlano, TXSchedule 12 hour, weekend, 24x7Type Full Time
Pay $35.00-45.00
Aligned Data Centers is hiring a Critical Facilities Technician in Plano, TX.
It's fun to work in a company where people truly BELIEVE in what they're doing.
We're committed to bringing passion and customer focus to the business.
Maintains, monitors, and performs preventive, predictive, and corrective maintenance on critical and non-critical equipment.
Mechanical areas to include operation and maintenance of multiple components within the HVAC system, plumbing installation/maintenance.
Key requirements
- High school diploma and minimum 3-5 years’ experience in electrical or mechanical critical facilities support.
- Electrical/Mechanical certifications preferred.
- Able to work overtime and longer shifts (12 hour).
- Shifts may require work day/night/weekend/holiday .
Critical facilities operations
Critical Facilities Maintenance Technician
Aligned Data CentersDallas-Fort Worth area, TXSchedule WeekendType Full Time
Pay $35.00 - $45.00/hr
Aligned Data Centers is hiring a Critical Facilities Maintenance Technician in Dallas-Fort Worth area, TX.
It's fun to work in a company where people truly BELIEVE in what they're doing.
We're committed to bringing passion and customer focus to the business.
Under supervision, assist with maintenance of multiple mechanical areas including components within the HVAC system.
Maintain and monitor electronic work-order ticketing system(s) to perform and track all preventive, predictive.
Key requirements
- High school diploma or GED and minimum 2-5 years’ working experience.
- Working knowledge of electrical and/or mechanical critical facilities systems a plus.
- Able to work 40 hours plus occasional overtime.
Critical facilities operations
Data Center Technician L2
NTT Global Data CentersGarland, TXSchedule WeekendType Full Time
Pay $27.80 - $50.00Openings 3 with this title here
NTT Global Data Centers is hiring a Data Center Technician L2 in Garland, TX.
Key Roles and Responsibilities: Develops creative approaches to keep operational costs to a minimum, improves efficiency, and implements new strategies.
Tests performance of electromechanical assemblies and electronic voltmeters.
The posting mentions weekend work.
Low voltage and fiber
Infra Delivery Technician
Amazon Web Services (AWS)Wilmer, TXSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 3 with this title here
Amazon Web Services (AWS) is hiring an Infra Delivery Technician in Wilmer, TX.
We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.
Traveling within and outside of the regional work area is required.
The first requirement listed is: 1+ years of computer networking experience.
Key requirements
- 1+ years of computer networking experience.
- High school or equivalent diploma.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Garland, TXSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting page
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Garland, TX.
Transform network infrastructure by joining our dynamic team.
Infra Delivery Install Technicians will collaborate with cross-functional teams, troubleshoot.
Moving and implementing large enterprise equipment.
Installing Fiber and Copper cabling and patching cabling between equipment.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Working in cramped and/or elevated and/or noisy environments.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Construction leadership
Electrical General Foreman
RosendinCoppell, TXSchedule WeekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring an Electrical General Foreman in Coppell, TX.
The General Foreman is responsible for Rosendin; managing the labor, materials and production for electrical construction projects.
Provide technical expertise in installing and troubleshooting electrical wiring and equipment.
Responsible for supervision of all field production activities; provide assistance to the Foreman in planning the job, ordering materials.
Work with appropriate Project Managers and Superintendents to establish project goals at the beginning of the project.
Key requirements
- State Issued Electrical license, where applicable by state requirement.
- 5 years of Electrical Experience.
- A minimum of three to five years of experience working as an Electrical Foreman/General Foreman or in a similar role in electrical.
- Advanced abilities in reading and interpreting electrical plans and specifications with in-depth knowledge of the NFPA codes.
Construction leadership
Electrical Foreman
RosendinCoppell, TXSchedule WeekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Rosendin is hiring an Electrical Foreman in Coppell, TX.
The Foreman is responsible for monitoring installations and ensuring work is performed according to Rosendin standards and project specifications.
Achieve Rosendin productivity objectives by effectively managing and assigning tasks to crew members.
Establish project goals and monitor success in reaching those objectives on an ongoing basis.
The posting lists more than one location, and this city is one of them.
Key requirements
- State Issued Electrical license, where applicable by state requirement.
- 5 years of Electrical Experience.
- Experience in a Foreman, Superintendent or other electrical leadership role.
Construction leadership
MEP Superintendent
EverOnDenton, TXType Full Time
Pay Not stated in the posting
EverOn is hiring a MEP Superintendent in Denton, TX.
We’re the only solutions provider in the data center.
The Quality Superintendent is responsible for overseeing and executing field quality activities to ensure all construction, MEP systems, and commissioning-related installations comply with project specifications, client requirements, company standards.
Lead field execution of QA/QC activities for assigned project areas and disciplines.
Verify installations comply with approved drawings, specifications, submittals, manufacturer requirements, and project standards.
Key requirements
- Bachelor's degree in Engineering, Construction Management, Quality Management, or related field preferred.
- Equivalent combination of education, military service, technical training, and industry experience may be considered.
- 5-8 years of experience in construction, QA/QC, commissioning, or related technical disciplines.
- Experience in mission-critical, hyperscale data center, industrial, healthcare, pharmaceutical.
Construction leadership
Superintendent II
Faith TechnologiesDallas, TXSchedule Monday through friday, weekendType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring a Superintendent II in Dallas, TX.
Superintendents are responsible for leading our electrical teams on the job site.
Superintendents have a well versed knowledge of the National Electric Code (NEC) and a strong passion for safety, training, leadership development, and commitment to excellence.
All previous classification requirements must be continually satisfied.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).