Illustrative photo-style image: a technician dresses fiber into overhead trays above server racks

Data center jobs · Columbus

Data center jobs in Columbus, Ohio

22 verified open jobs5 employersPosted pay $40.00 to $72.00/hrChecked Nov 11, 2026

Central Ohio's data center hiring centers on New Albany, with more work in Columbus, Hilliard, Plain City and the AWS sites around Jeffersonville. This hub lists 22 openings at 5 employers, from data center engineering operations and controls to commissioning, safety and construction management. We opened every posting on the employer's own site on November 11, 2026 and confirmed it was accepting applications. Each card gives a plain-English summary, the key requirements and an Apply button that goes straight to the employer.

Free for job seekers, and you choose what to share. Hiring in Columbus? Feature your opening from $99 or email welcome@datacenterskilledtrades.com.

22

Verified open trade and operations jobs on this page, each opened on the employer's own site today.

Source: This page
5

Employers with open postings here, operators and contractors.

Source: This page
$64,700

Annual median pay for electricians in the Columbus metro, May 2025.

Source: BLS OEWS
$64,440

Annual median pay for HVAC/R mechanics in the Columbus metro, May 2025.

Source: BLS OEWS
$138

Columbus lodging per night, GSA FY2027.

Source: GSA per diem

Columbus open jobs, by trade (22)

Every posting below was opened on the employer's own job site or applicant system on November 11, 2026 and was accepting applications. The summaries are written from each posting in plain English, and pay appears only where the posting states it. Use the trade buttons or the search box to narrow the list, and sort by newest to see fresh postings first.

Showing 22 of 22 verified openings

Electrical

Critical Power Systems Specialist, NA

Vantage Data CentersNew Albany, OHType Full Time

Pay $70.00 - $72.00 per hour

Vantage Data Centers is hiring a Critical Power Systems Specialist, NA in New Albany, OH.

The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.

The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.

Perform detailed, specialized maintenance, troubleshooting, and operational tasks within your area of expertise.

Independently manage complex maintenance projects and system enhancements with minimal supervision.

Key requirements

  • Minimum 8 years (10+ years preferred) of direct hands-on experience specializing in maintenance.
  • Extensive knowledge of maintenance practices and operational standards relevant to your specialization.
  • Proven ability to read and interpret technical schematics, blueprints, and operational manuals.
  • Strong technical writing capabilities, with experience creating and updating method of procedures (MOPs).
Posted Oct 21, 2026. Checked open Nov 11, 2026.
Electrical

Data Center Electrician- 1st shift (Sunday- Wednesday)

CologixColumbus, OHType Full- Time - Temps Plein

Pay $50 - $55 per hour wage

Cologix posted this opening for its Columbus, OH site.

The first requirement listed is: licensed Electrician or equivalent electrical certification required.

Key requirements

  • Licensed Electrician or equivalent electrical certification required.
  • 5+ years of experience working with electrical systems in mission-critical, industrial, or similar environments.
  • Strong knowledge of electrical distribution systems, including UPS, generators, switchgear, and DC power systems.
  • Experience with installation, maintenance, and troubleshooting of AC and DC systems.
Posted Sep 30, 2026. Checked open Nov 11, 2026.
Mechanical and HVAC

Transitioning Military | Critical Facilities (Electrical or Mechanical) | 2026 -2027

Vantage Data CentersNew Albany, OHSchedule Weekend, on-callType Full Time

Pay $ 40/hour - $70/hour

Vantage Data Centers posted this opening for its New Albany, OH site.

The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.

The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.

New Albany, OH (Columbus).

New Sites not yet announced.

Key requirements

  • Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
  • Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
  • Ability to read commercial building blueprints and understand electrical single lines and schematics.
  • Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Posted Oct 16, 2026. Checked open Nov 11, 2026.
Controls and BMS

Data Center Controls Engineer

Amazon Web Services (AWS)New Albany, OHSchedule On-callType Full-Time

Pay Range shown on the AWS posting pageOpenings 7 with this title here

Amazon Web Services (AWS) is hiring a Data Center Controls Engineer in New Albany, OH.

As part of the global controls team, you will work with highly motivated experts and innovators in the data center industry.

You will be responsible for troubleshooting, project management, and maintaining the building management system (BMS) and electrical power monitoring system (EPMS).

The first requirement listed is: experience with Industrial control systems, both hardware and software.

Key requirements

  • Experience with Industrial control systems, both hardware and software.
  • Bachelor’s degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 3+ years of relevant.
  • 3+ years of experience with industrial controls in critical environment.
  • 2+ years of general project or vendor management experience.
Controls and BMS

Controls Technician

Amazon Web Services (AWS)New Albany, OHType Full-Time

Pay Range shown on the AWS posting pageOpenings 4 with this title here

Amazon Web Services (AWS) is hiring a Controls Technician in New Albany, OH.

As a member of the Global Controls Team, you will collaborate with highly motivated operators, engineers and technicians in the data center industry to maintain and optimize critical infrastructure systems.

AWS data centers utilize sophisticated industrial control systems to automatically operate mechanical equipment, maintaining optimal temperature and pressure conditions throughout the facilities.

The first requirement listed is: high school or equivalent diploma.

Key requirements

  • High school or equivalent diploma.
  • Candidate must meet ITAR compliance.
  • Associate’s degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
  • Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
Commissioning and QA/QC

Project Manager, Quality & Commissioning, NA

Vantage Data CentersNew Albany, OHType Full Time

Pay Not stated in the postingOpenings 2 with this title here

Vantage Data Centers is hiring a Project Manager, Quality & Commissioning, NA in New Albany, OH.

The Construction team is responsible for the entire process flow of delivering the physical data centers from shovel ready state through commissioning, working with Sales, Operations, and management along the way.

Construction implements and executes upon the work product developed by the Development & Engineering (D&E) team.

Facilitate the mentoring of core Vantage team members within the area of quality and commissioning process.

Drive knowledge transfer of quality and commissioning procedures to Vantage team members and project stakeholders.

Key requirements

  • A Bachelor of Science in either Construction Management, Mechanical, Electrical, Computer Science, or Building Services Engineering.
  • 5+ years of experience in Commissioning, Construction Management, Automation Systems or related industries.
  • Expected travel is 25%, but may evolve over time.
Posted Nov 6, 2026. Checked open Nov 11, 2026.
Commissioning and QA/QC

Senior Engineer - Commissioning

CologixColumbus, OHType Full- Time - Temps Plein

Pay $150,000 - $165,000 per year salary

Cologix is hiring a Senior Engineer - Commissioning in Columbus, OH.

Engineer - Commissioning is responsible for directing and/or supporting planning, coordinating, and executing all commissioning activities associated with mission-critical data center projects.

This role ensures that mechanical, electrical, plumbing (MEP), controls, and security are designed, installed, tested, and operated in accordance with project requirements and industry best practices.

Posted Oct 27, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Clearable Engineering Operations Technician

Amazon Web Services (AWS)Hilliard, OHSchedule 12 hour, rotating shift, on callType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Clearable Engineering Operations Technician in Hilliard, OH.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

The Data Center Engineering Operations Technician (EOT) are Amazon’s front line responders for hands-on electrical and mechanical equipment troubleshooting and operation.

Operate and maintain mechanical and electrical, mechanical, emergency generator, and fire/life safety equipment within the data center.

Troubleshoot of facility and rack-level events within internal SLAs.

Key requirements

  • 2+ years of relevant work experience.
  • Experience in relevant work.
  • Can bend or twist the body into unusual positions while working.
  • Can use hands to manipulate small wires and objects.
Critical facilities operations

Data Center Chief Engineer - Nights

Amazon Web Services (AWS)Jeffersonville, OHType Full-Time

Pay Range shown on the AWS posting pageOpenings 6 with this title here

Amazon Web Services (AWS) is hiring a Data Center Chief Engineer - Nights in Jeffersonville, OH.

The Data Center Chief Engineer (CE) is responsible for ensuring that all electrical, mechanical, and fire/life safety equipment within the data center is operating at peak efficiency.

This involves both planned preventative maintenance of equipment, daily corrective work, and emergency response to emergent issues.

Oversee the day-to-day operations and maintenance of mechanical and electrical equipment in a data center.

Operate independently with limited direct management.

Key requirements

  • Walk job sites in uneven terrain.
  • Work at heights and from ladders.
  • Regularly lift and/or move up to 39 pounds; and participate in group lifts for 40 pounds or more.
  • Coordinate body movements when using tools or equipment.
Critical facilities operations

Data Center Operations Technician IV

Amazon Web Services (AWS)Plain City, OHSchedule WeekendType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Data Center Operations Technician IV in Plain City, OH.

You will perform hands-on work across the full lifecycle of data center IT infrastructure , installing, maintaining, troubleshooting, and decommissioning the servers, racks, and cabling that our customers depend on every day.

Your technical judgment and ability to execute procedures safely and accurately will directly impact customer capacity and service reliability.

Perform procedures on data center IT infrastructure including rack installation and decommission, server deployment, component replacement.

Troubleshoot and resolve hardware and systems issues by gathering data, conducting root cause analysis, documenting findings.

Key requirements

  • 2+ years of computer/server hardware troubleshooting experience, or experience related IT.
  • 2+ years of computer layer 1/2 networking (including troubleshooting and repair) experience.
  • Work flexible schedule including weekends, nights, and holidays.
Critical facilities operations

Data Center Facility Manager II

Amazon Web Services (AWS)New Albany, OHSchedule 24x7Type Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Data Center Facility Manager II in New Albany, OH.

Data Center Facility Manger role acts as Amazon’s front line when it comes to hands-on electrical and mechanical equipment troubleshooting.

Mechanical equipment includes CRAC units, centrifugal chillers, cooling towers/water chemical systems, air handlers and associated systems, pumps, and motors.

Oversee all aspects of the data center's critical infrastructure. Ensure that all work performed within the space is done to high quality.

Oversee the safety, security, availability, quality, and performance of the team, while driving a positive customer experience across multiple shift.

Key requirements

  • 5+ years of in a managerial/supervisory role with 5 or more direct reports experience.
  • 3+ years of electrical or mechanical experience.
  • 3+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
Critical facilities operations

Structural Engineer

Amazon Web Services (AWS)Columbus, OHType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Structural Engineer in Columbus, OH.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

The Structural Engineer in Fleet remediation engineering, Civil Structural and Architectural (FRE-CSA) team has the ability to understand the customer demand as well as the technology & business opportunities that exist in order to achieve the organization’s.

Work with a team of multi-disciplinary professionals on a wide variety of conceptual design, build, and retrofit projects at existing data center.

Create, review and release data center structural improvements and designs.

Key requirements

  • Experience with the design, construction, operation, or maintenance of mission critical facilities, especially data centers.
  • Bachelor's degree or equivalent in Structural Engineering.
  • Experience reading and interpreting construction drawings and specifications, or experience reading and writing procedures.
  • Travel up to 50% domestic travel with short notice.
Critical facilities operations

Critical Environments Operator I

CyrusOneNew Albany, OHType Full Time

Pay Not stated in the posting

CyrusOne is hiring a Critical Environments Operator I in New Albany, OH.

The first requirement listed is: ability to organize, prioritize, and expedite projects from conception to closure.

Key requirements

  • Project Leadership - Ability to organize, prioritize, and expedite projects from conception to closure. .
  • Problem Identification / Resolution - Ability to identify malfunctions and deviations in equipment performance and control.
  • Supervision Required - Ability to interface effectively with managers and more experienced technicians as well as work independently when.
  • Decision Making Capability / Impact - Ability to make the best choice with the available information at hand. Experience, training.
Posted Oct 16, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Critical Facilities Engineer, NA

Vantage Data CentersNew Albany, OHType Full Time

Pay Not stated in the posting

Vantage Data Centers is hiring a Critical Facilities Engineer, NA in New Albany, OH.

The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.

The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.

Work under limited supervision, both independently and within a team environment.

Manage multiple one-time and/or ongoing projects.

Key requirements

  • Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
  • Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
  • Ability to read commercial building blueprints and understand electrical single lines and schematics.
  • Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Posted Oct 8, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Critical Environments Operator IV

CyrusOneNew Albany, OHSchedule 24/7Type Full Time

Pay Not stated in the posting

CyrusOne is hiring a Critical Environments Operator IV in New Albany, OH.

Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.

The first requirement listed is: cheerful and enthusiastic attitude.

The posting mentions 24/7 work.

Key requirements

  • Cheerful and enthusiastic attitude.
  • Strong verbal and written communication skills.
  • Good problem solving, decision-making skills.
  • Strong PC skills including word processing and spreadsheets.
Posted Oct 6, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Critical Operations Technician I

QTS Data CentersNew Albany, OHSchedule 24x7

Pay Not stated in the posting

QTS Data Centers is hiring a Critical Operations Technician I in New Albany, OH.

The Critical Operations Technician I is responsible for the installation, repair, and maintenance of IT, electrical, mechanical, plumbing/piping equipment, machinery and controls located in the interior and exterior of building.

This role monitors operations and conducts a routine and ongoing assessment of the building systems, operations, and performance.

Apply learning, knowledge, skills, and company policies to a wide range of tasks pertaining to IT, electrical and mechanical equipment, controls.

Leads, maintains, monitors, and performs preventive maintenance on mechanical and electrical equipment; records readings.

Key requirements

  • Two or more years of technical training, military training, or workplace equivalency.
  • Background in areas of IT, electrical, and/or mechanical.
  • Proficiency with MS Office Suite.
  • Customer focus with excellent interpersonal skills, and the ability to interface with all levels within the organization.
Posted Sep 1, 2026. Checked open Nov 11, 2026.
Construction leadership

Construction Manager

Amazon Web Services (AWS)Jeffersonville, OHType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Construction Manager in Jeffersonville, OH.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.

As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.

Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.

Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.

Key requirements

  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
  • Experience carrying new design concepts through exploration, development, and into deployment or mass production.
  • Experience in MS Excel, Word, and Windows Operating Systems.
  • Experience with power management and power monitoring systems.
Construction leadership

Construction Manager

Amazon Web Services (AWS)New Albany, OHType Full-Time

Pay Range shown on the AWS posting pageOpenings 2 with this title here

Amazon Web Services (AWS) is hiring a Construction Manager in New Albany, OH.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.

As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.

Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.

Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.

Key requirements

  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
  • Experience carrying new design concepts through exploration, development, and into deployment or mass production.
  • Experience in MS Excel, Word, and Windows Operating Systems.
  • Experience with power management and power monitoring systems.
Construction leadership

Project Engineer

Amazon Web Services (AWS)New Albany, OHType Full-Time

Pay Range shown on the AWS posting pageOpenings 6 with this title here

Amazon Web Services (AWS) is hiring a Project Engineer in New Albany, OH.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.

As our Data Center Project Engineer, you will support the teams that build some of the most interesting electrical and mechanical systems in the world.

Leading cross-functional communication and coordination between regional general contractors, stakeholders, and internal teams.

Developing and maintaining comprehensive tracking systems for design modifications, RFIs, and change orders.

Key requirements

  • 3+ years of vendor management experience.
  • 4+ years of relevant work in a data center or other critical environment experience.
  • 5+ years of data center engineering or operations experience.
  • 5+ years of Microsoft Office including Outlook, Word, and Excel experience.
Construction leadership

Construction Manager

Amazon Web Services (AWS)Plain City, OHType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Construction Manager in Plain City, OH.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we're looking for talented people who want to help.

You will build some of the most interesting electrical and mechanical systems in the world.

Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.

Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.

Key requirements

  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
  • Experience carrying new design concepts through exploration, development, and into deployment or mass production.
  • Experience in MS Excel, Word, and Windows Operating Systems.
  • Experience with power management and power monitoring systems.
Safety

Health & Safety Manager - LCK

Amazon Web Services (AWS)Hilliard, OHType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Health & Safety Manager - LCK in Hilliard, OH.

As the Regional Safety Engineer you will own the Health and Safety function of your respective area.

They are working with electrical switching equipment, large scale air handling mechanical systems, and critical IT gear.

Implement health and safety standards, policies and practices including but not limited to; safety management systems, training, risk assessments.

Conduct health and safety audits of data centers and active construction sites to ensure compliance with health.

Key requirements

  • Bachelor's degree or equivalent.
  • Experience handling confidential information.
  • Bachelor’s Degree and 4+ years of compliance program management, legal, governance, audit, risk prevention.
  • Implement health and safety standards, policies and practices including but not limited to; safety management systems, training.
Safety

Construction Safety Manager

Amazon Web Services (AWS)Jeffersonville, OHType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Construction Safety Manager in Jeffersonville, OH.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

Review due diligence risk assessments with real estate, preconstruction, construction operations on H&S aspects of the AWS H&S management program to.

Coordinate with DCPD managers to prioritize H&S in planning and execution in all phases of DCPD projects.

Key requirements

  • 5+ years of program or project Management experience.
  • 6+ years of construction health & safety experience on active construction projects.
  • 2+ years experience leading EHS Programs on construction projects.
  • Construction Health & Safety Technician (CHST) Certification OR one of the Preferred Qualification Certifications.

Pay ranges in the Columbus metro

These are BLS OEWS May 2025 figures for all employers in the metro, not data center premiums. The small print shows the 10th to 90th percentile spread and how many people hold the job. Data center operators and contractors often pay toward the upper half, and travel jobs add per diem and overtime. Compare offers in the pay calculator.

OccupationColumbus metro
Electricians (47-2111)$64,700 median
$46,090 to $94,410 (10th to 90th percentile)
7,210 employed
HVAC/R mechanics (49-9021)$64,440 median
$40,680 to $100,590 (10th to 90th percentile)
3,000 employed
Plumbers, pipefitters, steamfitters (47-2152)$63,260 median
$40,820 to $103,000 (10th to 90th percentile)
3,060 employed
Maintenance and repair workers, general (49-9071)$52,800 median
$35,860 to $76,700 (10th to 90th percentile)
10,970 employed

Unions, apprenticeships and training

Most data center electricians come up through a registered apprenticeship, either a joint IBEW and NECA program or a merit-shop program. Pipefitters and HVAC techs follow the same pattern through their own locals and contractors. Compare the two paths in the union vs merit shop guide, and use the official pages below to find a program near you.

Electrical union

IBEW Local 683

The IBEW local for Columbus, Ohio, with its own apprenticeship office.

Apprenticeship locator

electrical training ALLIANCE

The national IBEW and NECA training organization. Its program locator finds the inside wireman apprenticeship that covers your ZIP code.

Any trade

Apprenticeship.gov finder

The Department of Labor's search for registered apprenticeship programs by ZIP code and trade.

Commute and per diem

The GSA FY2027 per diem for Columbus (Franklin County) is $138 lodging and $80 meals and incidentals all year. Licking, Madison and Fayette County ZIP codes use the standard rate of $113 and $68. Employers set their own per diem, so use these federal rates as a benchmark when you compare travel offers. See travel and per diem for construction work.

About this list

This list replaces the November 6, 2026 feed that this hub used before. We pulled current postings from operator and contractor career sites, kept trade and facilities roles, and dropped design, estimating, IT and office jobs. Each posting was opened on November 11, 2026, and any that had closed were removed. The employers on this page are Amazon Web Services (AWS), Cologix, CyrusOne, QTS Data Centers and Vantage Data Centers. A checked list is a sample, not a census, so check those employers' career sites for more roles.

Role guides that match these jobs include the data center electrician pay guide, critical facilities HVAC technician and the commissioning Level 1 to 5 pathway. The other hubs are Northern Virginia, Dallas-Fort Worth, Atlanta, Phoenix. Start from data center jobs for the full board or data center markets for regional guides. Build a free placement profile so recruiters can reach you for roles that are not posted yet.

Wider region

Where new campuses are being built beyond this metro, and which trades they need.

  • Midwest data center market: New Albany, Conesville and Lordstown in Ohio, plus Indiana and Wisconsin campuses, utility deals, pay and per diem.

All regions: data center markets.

For employers hiring in Columbus

Can’t fill a data center trade seat in Columbus?

Readers of this hub came here to look at data center work in Columbus. Pin your opening at the top of it for 30 days, with a link straight to your own posting.

72,700

Electrician openings projected each year, 2025 to 2035. BLS names data center demand as one driver.

Source: BLS Occupational Outlook Handbook
40,600

HVAC/R openings projected each year, with 11% growth. BLS lists data center construction as a growth driver.

Source: BLS Occupational Outlook Handbook
31

Data center trade listings across 5 metro hubs on this site. Employer links checked November 10, 2026.

Source: DCST job board

Feature your opening here

One-time payment, no auto-renew. Live usually within one business day. We don’t promise views or hires.

Sold by JRin Media. Charges appear on your card statement as JRIN MEDIA. Terms · Privacy