Illustrative photo-style image: a desert data center campus under construction with a substation and cranes

Data center jobs · Phoenix

Data center jobs in Phoenix

24 verified open jobs7 employersPosted pay $40.00 to $70.00/hrChecked Nov 11, 2026

Phoenix data center work runs from central Phoenix out to Avondale and Glendale in the West Valley and Mesa, Chandler and Tempe in the East Valley. This hub lists 24 openings at 7 employers, including low voltage and fiber installers, commissioning and quality roles, electricians and critical facilities techs. We opened every posting on the employer's own site on November 11, 2026 and confirmed it was accepting applications. Each card gives a plain-English summary, the key requirements and an Apply button that goes straight to the employer.

Free for job seekers, and you choose what to share. Hiring in Phoenix? Feature your opening from $99 or email welcome@datacenterskilledtrades.com.

24

Verified open trade and operations jobs on this page, each opened on the employer's own site today.

Source: This page
7

Employers with open postings here, operators and contractors.

Source: This page
$61,210

Annual median pay for electricians in the Phoenix-Mesa-Chandler metro, May 2025.

Source: BLS OEWS
$61,170

Annual median pay for HVAC/R mechanics in the Phoenix-Mesa-Chandler metro, May 2025.

Source: BLS OEWS
$165

Phoenix lodging per night in November, GSA FY2027.

Source: GSA per diem

Phoenix open jobs, by trade (24)

Every posting below was opened on the employer's own job site or applicant system on November 11, 2026 and was accepting applications. The summaries are written from each posting in plain English, and pay appears only where the posting states it. Use the trade buttons or the search box to narrow the list, and sort by newest to see fresh postings first.

Showing 24 of 24 verified openings

Electrical

Journeyman - Electrical

EverOnMesa, AZType Full Time

Pay Not stated in the posting

EverOn is hiring a Journeyman - Electrical in Mesa, AZ.

The Journeyman should be a outside linemen, inside wiremen, installer technician, electrician, or Master Electrician who has been engaged at the trade for at least five (5) years.

The Journeyman will be responsible for performing journey-level electrical duties in the diagnosis, maintenance and repair of electrical equipment.

RESPONSIBILITIES.

Key requirements

  • At least five (5) years of experience in the trade.
  • Unlimited Electrical or Contractor's license (required).
  • Formal training in approved vocational schools in the fundamentals of the trade.
  • Ability to stand, walk, sit, climb, and balance.
Posted Nov 6, 2026. Checked open Nov 11, 2026.
Electrical

Electrician

Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time

Pay Not stated in the postingOpenings 2 with this title here

Faith Technologies is hiring an Electrician in Phoenix, AZ.

The Licensed Electrician I is responsible for electrical installations, troubleshooting, and maintenance within the commercial and industrial settings.

Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development.

All previous classification requirements must be continually satisfied.

Maintain current licensing and training requirements.

Key requirements

  • Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Posted Sep 8, 2026. Checked open Nov 11, 2026.
Mechanical and HVAC

Transitioning Military | Critical Facilities (Electrical or Mechanical) | 2026 -2027

Vantage Data CentersPhoenix, AZSchedule Weekend, on-callType Full Time

Pay $ 40/hour - $70/hour

Vantage Data Centers posted this opening for its Phoenix, AZ site.

The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.

The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.

New Albany, OH (Columbus).

New Sites not yet announced.

Key requirements

  • Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
  • Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
  • Ability to read commercial building blueprints and understand electrical single lines and schematics.
  • Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Posted Oct 16, 2026. Checked open Nov 11, 2026.
Mechanical and HVAC

Journeyman - Mechanical

EverOnMesa, AZType Full Time

Pay Not stated in the posting

EverOn is hiring a Journeyman - Mechanical in Mesa, AZ.

The Journeyman will be responsible for performing journey-level mechanical duties in the diagnosis, maintenance and repair of gasoline, diesel.

RESPONSIBILITIES.

Break fix of all Electro-mechanical systems (HVAC, Hydronics, Appliances, Rollup doors, dock locks, air compressors, etc.).

Key requirements

  • At least five (5) years of experience in the trade.
  • Unlimited Mechanical or Contractor's license (required).
  • Formal training in approved vocational schools in the fundamentals of the trade.
  • Ability to stand, walk, sit, climb, and balance.
Posted Jul 1, 2026. Checked open Nov 11, 2026.
Controls and BMS

Data Center Controls Technician

Amazon Web Services (AWS)Avondale, AZType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Data Center Controls Technician in Avondale, AZ.

As a member of the Global Controls Team, you will collaborate with highly motivated operators, engineers and technicians in the data center industry to maintain and optimize critical infrastructure systems.

AWS data centers utilize sophisticated industrial control systems to automatically operate mechanical equipment, maintaining optimal temperature and pressure conditions throughout the facilities.

The first requirement listed is: high school or equivalent diploma.

Key requirements

  • High school or equivalent diploma.
  • Associate's degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
  • Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
  • 1+ years of experience working with low voltage controls, wiring, networking signals, electrical and mechanical systems, computers.
Controls and BMS

Systems Engineer Protections and Controls III

RosendinTempe, AZType Full Time

Pay Not stated in the posting

Rosendin is hiring a Systems Engineer Protections and Controls III in Tempe, AZ.

Want to be part of the team that design and develop complex power distribution systems for a hyper-scale data center campus?

Have strong problem-solving skills that you can make things work as intended?

Pre-construction design and development of the complete power system protection and control by deploying overcurrent protection relays.

Design and Develop site wide electrical distribution Sequence of Operation that ensures system reliability and resiliency.

Key requirements

  • Bachelor’s degree in Electrical Engineering and minimum of 8+ years of engineering design experience in electrical power systems.
  • Self-starting, avid learners on new technologies and products.
  • Strong understanding on power distribution systems, relaying, automation systems.
  • In-depth working knowledge of SEL-751, SEL-787, SEL-487E, SEL-2411, SEL-3350 RTAC, Siemens 7SX82/85, Siemens 7UT, ABB REF615 etc.
Posted Sep 23, 2026. Checked open Nov 11, 2026.
Commissioning and QA/QC

Commissioning Engineer

Amazon Web Services (AWS)Avondale, AZSchedule WeekendType Full-Time

Pay Range shown on the AWS posting pageOpenings 6 with this title here

Amazon Web Services (AWS) is hiring a Commissioning Engineer in Avondale, AZ.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

Are you experienced in Critical Infrastructure Commissioning and looking for a fast paced environment to work in.

Medium and low voltage power systems.

HVAC (Air Handlers / Exhaust Fans / VFD).

Key requirements

  • Regularly walk, use hands and fingers, reach with hands and arms, stoop, kneel, crouch or crawl.
  • Lift and/or move up to 49 pounds; and participate in group lifts for 50 pounds or more.
  • Work shifts longer than eight hours in duration with potential for night and weekends.
  • Work in environments that are colder or hotter than a normal office environment.
Commissioning and QA/QC

Data Center Commissioning Project Manager

Faith TechnologiesPhoenix, AZSchedule Monday - fridayType Full Time

Pay Not stated in the posting

Faith Technologies is hiring a Data Center Commissioning Project Manager in Phoenix, AZ.

The Cx Project Manager responsible for providing general management of electrical and/or specialty systems QAQC and Commissioning scopes of work, as well as successfully managing commissioning and startup schedules.

The ideal candidate must be proficient in the use of a PC and Microsoft Office Suite, must be proficient in the use of Google G-suit, and knowledge of the electrical construction trade is preferred.

Develop the QAQC/Cx scope, schedule, and budget. Reviews outgoing QAQC/Cx estimates with Estimating Department to ensure accuracy. Properly utilizes.

Develop the QAQC/Cx safety plan. Effectively involves internal safety departments to ensure a complete.

Key requirements

  • Education: Bachelor’s Degree in Engineering, Construction Management, or equivalent technical training/experience.
  • Experience: 5 years of Project Management, Construction Management, Project Engineering.
Posted Oct 27, 2026. Checked open Nov 11, 2026.
Commissioning and QA/QC

Construction Quality Manager, NA

Vantage Data CentersPhoenix, AZType Full Time

Pay Not stated in the posting

Vantage Data Centers is hiring a Construction Quality Manager, NA in Phoenix, AZ.

The project Construction team is responsible for the project execution, delivering the physical data centers from project planning and design through procurement to construction and commissioning, working with Sales, Operations, and management along the way.

The team manages Vantage’s design and build partners to success through technical feedback and review and actively participates in review of schedule and budget.

Participate in design and specification reviews - Identify quality risks and mitigation strategies - Align quality requirements with procurement.

Enforce QA/QC plans and inspection protocols - Perform first-work inspections and audits - Track.

Key requirements

  • 7+ years of construction QA/QC experience (data center or mission critical preferred) - Strong understanding of mechanical, electrical.
Posted Oct 13, 2026. Checked open Nov 11, 2026.
Commissioning and QA/QC

Commissioning Engineer II

QTS Data CentersPhoenix, AZSchedule Weekend

Pay Not stated in the posting

QTS Data Centers is hiring a Commissioning Engineer II in Phoenix, AZ.

The Commissioning Engineer II is responsible for but not limited to Level 1, 2, 3, 4 and 5 commissioning of base building systems, security systems, life safety systems, Electrical, Mechanical, and EPMS/BMS systems of a Data Center environment.

This role will oversee, document, and track various aspects of commissioning activities.

The first requirement listed is: Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.

The posting lists more than one location, and this city is one of them.

Key requirements

  • Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
  • Five or more years of work experience in data center engineering, commissioning, project management, or equivalent.
  • Background in areas of building maintenance, CCTV and Access control systems, network, telecommunications.
  • Ability to travel to other Data Center locations as required.
Posted Oct 9, 2026. Checked open Nov 11, 2026.
Commissioning and QA/QC

QTS Commissioning Team

QTS Data CentersGlendale, AZSchedule Weekend

Pay Not stated in the posting

QTS Data Centers is hiring a QTS Commissioning Team in Glendale, AZ.

The Commissioning Engineers I, II, & III are responsible for but not limited to Level 1, 2, 3, 4 and 5 commissioning of base building systems, security systems, life safety systems, Electrical, Mechanical, and EPMS/BMS systems of a Data Center environment.

This role will oversee, document, and track various aspects of commissioning activities.

Assist in all site construction activity and installations, in coordination with QTS Development Team, external construction resources.

Develop comprehensive commissioning plans for Level 1, Level 2, Level 3, Level 4, and Level 5 systems, including connectivity.

Key requirements

  • Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
  • Five or more years of work experience in data center engineering, commissioning, project management, or equivalent.
  • Background in areas of building maintenance, CCTV and Access control systems, network, telecommunications.
  • Ability to travel to other Data Center locations as required.
Posted Aug 24, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Data Center Facility Manager

Amazon Web Services (AWS)Mesa, AZSchedule On-call, 24x7Type Full-Time

Pay Range shown on the AWS posting pageOpenings 2 with this title here

Amazon Web Services (AWS) is hiring a Data Center Facility Manager in Mesa, AZ.

Data Center Facility Manger role acts as Amazon’s front line when it comes to hands-on electrical and mechanical equipment troubleshooting.

Mechanical equipment includes CRAC units, centrifugal chillers, cooling towers/water chemical systems, air handlers and associated systems, pumps, and motors.

Oversee all aspects of the data center's critical physical infrastructure. Ensure that all work performed within the space is done to high quality.

Manage teams of 24x7 engineering technicians in all facets of their career.

Key requirements

  • 2+ years of in a managerial/supervisory role with 5 or more direct reports experience.
  • 3+ years of in industrial electrical or mechanical systems experience.
  • 3+ years of administrative experience including Microsoft Office products experience.
Critical facilities operations

Critical Environments Operator I

CyrusOneChandler, AZType Full Time

Pay Not stated in the posting

CyrusOne is hiring a Critical Environments Operator I in Chandler, AZ.

The first requirement listed is: ability to organize, prioritize, and expedite projects from conception to closure.

Key requirements

  • Project Leadership - Ability to organize, prioritize, and expedite projects from conception to closure. .
  • Problem Identification / Resolution - Ability to identify malfunctions and deviations in equipment performance and control.
  • Supervision Required - Ability to interface effectively with managers and more experienced technicians as well as work independently when.
  • Decision Making Capability / Impact - Ability to make the best choice with the available information at hand. Experience, training.
Posted Nov 4, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Facility Manager

CyrusOneChandler, AZType Full Time

Pay Not stated in the posting

CyrusOne is hiring a Facility Manager in Chandler, AZ.

Manage day to day operations of cooling (production & distribution) and electrical systems.

Troubleshoot issues related to the critical infrastructure using test equipment, observation and automation, monitoring and control applications.

Proactively develop and implement maintenance activities to include both critical infrastructure.

Key requirements

  • Extensive experience and knowledge of electrical and mechanical equipment and systems operations and maintenance including.
  • Cable plant design and management.
  • Experience with building automation, monitoring and control systems.
  • Energy audits.
Posted Nov 3, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Critical Environments Operator IV

CyrusOneChandler, AZSchedule 24/7Type Full Time

Pay Not stated in the postingOpenings 3 with this title here

CyrusOne is hiring a Critical Environments Operator IV in Chandler, AZ.

Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.

The first requirement listed is: demonstrated desire to provide the highest levels of customer service.

The posting mentions 24/7 work.

Key requirements

  • Demonstrated desire to provide the highest levels of customer service.
  • Cheerful and enthusiastic attitude.
  • Strong verbal and written communication skills.
  • Good problem solving, decision-making skills.
Posted Oct 30, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Critical Operations Technician

QTS Data CentersPhoenix, AZSchedule 24x7

Pay Not stated in the posting

QTS Data Centers is hiring a Critical Operations Technician in Phoenix, AZ.

The Critical Operations Technician I is responsible for the installation, repair, and maintenance of IT, electrical, mechanical, plumbing/piping equipment, machinery and controls located in the interior and exterior of building.

This role monitors operations and conducts a routine and ongoing assessment of the building systems, operations, and performance.

Apply learning, knowledge, skills, and company policies to a wide range of tasks pertaining to IT, electrical and mechanical equipment, controls.

Leads, maintains, monitors, and performs preventive maintenance on mechanical and electrical equipment; records readings.

Key requirements

  • Two or more years of technical training, military training, or workplace equivalency.
  • Background in areas of IT, electrical, and/or mechanical.
  • Proficiency with MS Office Suite.
  • Customer focus with excellent interpersonal skills, and the ability to interface with all levels within the organization.
Posted Oct 29, 2026. Checked open Nov 11, 2026.
Critical facilities operations

Critical Environments Operator II-7

CyrusOneChandler, AZSchedule 24/7Type Full Time

Pay Not stated in the posting

CyrusOne is hiring a Critical Environments Operator II-7 in Chandler, AZ.

Use and teaches others to use the Computerized Maintenance Management system (CMMS) to track all maintenance work, labor hours.

The first requirement listed is: cheerful and enthusiastic attitude.

The posting mentions 24/7 work.

Key requirements

  • Cheerful and enthusiastic attitude.
  • Strong verbal and written communication skills.
  • Good problem solving, decision-making skills.
  • Strong PC skills including word processing and spreadsheets.
Posted Oct 20, 2026. Checked open Nov 11, 2026.
Low voltage and fiber

Installation Technician

Amazon Web Services (AWS)Avondale, AZSchedule 24/7Type Full-Time

Pay Range shown on the AWS posting pageOpenings 32 with this title here

Amazon Web Services (AWS) is hiring an Installation Technician in Avondale, AZ.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

Moving and implementing large enterprise equipment.

Installing Fiber and Copper cabling and patching cabling between equipment.

Key requirements

  • Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
  • Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
  • Working in cramped and/or elevated and/or noisy environments.
  • Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber

Installation Technician

Amazon Web Services (AWS)Mesa, AZSchedule 24/7Type Full-Time

Pay Range shown on the AWS posting pageOpenings 38 with this title here

Amazon Web Services (AWS) is hiring an Installation Technician in Mesa, AZ.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

Moving and implementing large enterprise equipment.

Installing Fiber and Copper cabling and patching cabling between equipment.

Key requirements

  • Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
  • Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
  • Working in cramped and/or elevated and/or noisy environments.
  • Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
Low voltage and fiber

Infra Delivery Install Technician

Amazon Web Services (AWS)Avondale, AZSchedule 24/7Type Full-Time

Pay Range shown on the AWS posting pageOpenings 2 with this title here

Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Avondale, AZ.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

Traveling within and outside of the regional work area is required.

The first requirement listed is: regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.

Key requirements

  • Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
  • Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
  • Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
  • Ascending and descending ladders, stairs, and gangways safely and without limitation.
Low voltage and fiber

Electrical Apprentice/Low Voltage Apprentice

Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time

Pay Not stated in the posting

Faith Technologies is hiring an Electrical Apprentice/Low Voltage Apprentice in Phoenix, AZ.

The Faith Apprentice I is responsible for electrical and specialty systems installations, troubleshooting and maintenance through well-versed knowledge of the National Electric Code (NEC).

Our job site professionals thrive under self-directed management to complete projects safely and on time.

Travel to customer premises to install, maintain, and provide basic troubleshooting of electrical and specialty systems.

Install and bends conduit using manual, mechanical, and hydraulic benders.

Posted Oct 8, 2026. Checked open Nov 11, 2026.
Construction leadership

Construction Manager

Amazon Web Services (AWS)Avondale, AZType Full-Time

Pay Range shown on the AWS posting page

Amazon Web Services (AWS) is hiring a Construction Manager in Avondale, AZ.

We work on the most challenging problems, with thousands of variables impacting the supply chain , and we’re looking for talented people who want to help.

As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world.

Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.

Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.

Key requirements

  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field.
  • Experience carrying new design concepts through exploration, development, and into deployment or mass production.
  • Experience in MS Excel, Word, and Windows Operating Systems.
  • Experience with power management and power monitoring systems.
Construction leadership

Electrical Superintendent

Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time

Pay Not stated in the postingOpenings 2 with this title here

Faith Technologies is hiring an Electrical Superintendent in Phoenix, AZ.

Licensed Superintendents are responsible for leading our electrical teams on the job site.

Superintendents have a well versed knowledge of the National Electric Code (NEC) and a strong passion for safety, training, leadership development, and commitment to excellence.

All previous classification requirements must be continually satisfied.

Maintain current licensing and training requirements.

Key requirements

  • Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Posted Sep 8, 2026. Checked open Nov 11, 2026.
Construction leadership

Electrical Foreman

Faith TechnologiesPhoenix, AZSchedule Monday through friday, weekendType Full Time

Pay Not stated in the postingOpenings 2 with this title here

Faith Technologies is hiring an Electrical Foreman in Phoenix, AZ.

The Licensed Foreman I is responsible for supervising electrical installations, troubleshooting, and maintenance within the commercial and industrial settings.

Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development.

All previous classification requirements must be continually satisfied.

Maintain current licensing and training requirements.

Key requirements

  • Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Posted Sep 8, 2026. Checked open Nov 11, 2026.

Pay ranges in the Phoenix-Mesa-Chandler metro

These are BLS OEWS May 2025 figures for all employers in the metro, not data center premiums. The small print shows the 10th to 90th percentile spread and how many people hold the job. Data center operators and contractors often pay toward the upper half, and travel jobs add per diem and overtime. Compare offers in the pay calculator.

OccupationPhoenix-Mesa-Chandler metro
Electricians (47-2111)$61,210 median
$46,920 to $86,800 (10th to 90th percentile)
17,240 employed
HVAC/R mechanics (49-9021)$61,170 median
$38,210 to $83,180 (10th to 90th percentile)
8,070 employed
Plumbers, pipefitters, steamfitters (47-2152)$63,750 median
$46,530 to $100,710 (10th to 90th percentile)
9,270 employed
Maintenance and repair workers, general (49-9071)$48,930 median
$36,610 to $78,300 (10th to 90th percentile)
26,350 employed

Unions, apprenticeships and training

Most data center electricians come up through a registered apprenticeship, either a joint IBEW and NECA program or a merit-shop program. Pipefitters and HVAC techs follow the same pattern through their own locals and contractors. Compare the two paths in the union vs merit shop guide, and use the official pages below to find a program near you.

Pipe trades

UA Local 469

Arizona plumbers, pipefitters, welders and HVAC techs, with apprenticeship information on its site.

Apprenticeship locator

electrical training ALLIANCE

The national IBEW and NECA training organization. Its program locator finds the inside wireman apprenticeship that covers your ZIP code.

Any trade

Apprenticeship.gov finder

The Department of Labor's search for registered apprenticeship programs by ZIP code and trade.

Commute and per diem

The GSA FY2027 per diem for Phoenix and Scottsdale (Maricopa County) is $165 lodging and $86 meals in November. Lodging rises to $232 in February and March and drops to $122 from June through August, so summer travel jobs cost employers less. Employers set their own per diem, so use these federal rates as a benchmark when you compare travel offers. See travel and per diem for construction work.

About this list

This list replaces the November 6, 2026 feed that this hub used before. We pulled current postings from operator and contractor career sites, kept trade and facilities roles, and dropped design, estimating, IT and office jobs. Each posting was opened on November 11, 2026, and any that had closed were removed. The employers on this page are Amazon Web Services (AWS), CyrusOne, EverOn, Faith Technologies, QTS Data Centers, Rosendin and Vantage Data Centers. A checked list is a sample, not a census, so check those employers' career sites for more roles.

Role guides that match these jobs include the data center electrician pay guide, critical facilities HVAC technician and the commissioning Level 1 to 5 pathway. The other hubs are Northern Virginia, Dallas-Fort Worth, Atlanta, Columbus. Start from data center jobs for the full board or data center markets for regional guides. Build a free placement profile so recruiters can reach you for roles that are not posted yet.

Wider region

Where new campuses are being built beyond this metro, and which trades they need.

All regions: data center markets.

For employers hiring in Phoenix

Can’t fill a data center trade seat in Phoenix?

Readers of this hub came here to look at data center work in Phoenix. Pin your opening at the top of it for 30 days, with a link straight to your own posting.

72,700

Electrician openings projected each year, 2025 to 2035. BLS names data center demand as one driver.

Source: BLS Occupational Outlook Handbook
40,600

HVAC/R openings projected each year, with 11% growth. BLS lists data center construction as a growth driver.

Source: BLS Occupational Outlook Handbook
31

Data center trade listings across 5 metro hubs on this site. Employer links checked November 10, 2026.

Source: DCST job board

Feature your opening here

One-time payment, no auto-renew. Live usually within one business day. We don’t promise views or hires.

Sold by JRin Media. Charges appear on your card statement as JRIN MEDIA. Terms · Privacy