Electrical
Critical Power Systems Specialist, NA
Vantage Data CentersNew Albany, OHType Full Time
Pay $70.00 to $72.00 per hour
Vantage is hiring a critical power systems specialist at its New Albany, OH campus.
You would handle specialized maintenance, troubleshooting and operations work on critical electrical systems.
The job includes running complex maintenance projects and system upgrades with little supervision.
Vantage staffs the site 24/7 with critical facility engineers on every shift.
Key requirements
- Minimum 8 years (10+ years preferred) of direct hands-on experience specializing in maintenance.
- Extensive knowledge of maintenance practices and operational standards relevant to your specialization.
- Proven ability to read and interpret technical schematics, blueprints, and operational manuals.
- Strong technical writing capabilities, with experience creating and updating method of procedures (MOPs).
Electrical
Data Center Electrician, 1st shift (Sunday to Wednesday)
CologixColumbus, OHType Full- Time - Temps Plein
Pay $50 to $55 per hour wage
Cologix is hiring a data center electrician at its Columbus, OH site.
You would operate, maintain and troubleshoot utility feeds, generators, UPS systems, switchgear and distribution.
The job includes installing and energizing AC and DC power circuits for customers, tracking capacity and leading repairs during outages.
The shift is Sunday through Wednesday, 6 a.m. to 4 p.m.
Key requirements
- Licensed electrician or equivalent electrical certification.
- 5+ years on electrical systems in mission critical or industrial settings.
- Knowledge of UPS, generators, switchgear and DC power.
- Able to read single-line diagrams and as-builts.
Mechanical and HVAC
Transitioning Military, Critical Facilities (Electrical or Mechanical)
Vantage Data CentersNew Albany, OHSchedule Weekend work, on-callType Full Time
Pay $40/hour to $70/hour
Vantage is hiring transitioning service members for critical facilities roles, with New Albany, OH among the listed sites.
You would help keep the mechanical and electrical systems in Vantage's data halls running.
The site is staffed 24/7 with critical facility engineers on every shift, so the job includes weekend and on-call work.
Vantage asks for at least 3 years of hands-on maintenance and repair of industrial electrical or mechanical systems.
Key requirements
- Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Controls and BMS
Controls Technician
Amazon Web Services (AWS)New Albany, OHType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a controls technician at its New Albany, OH data centers.
You would maintain and tune the industrial control systems that run cooling equipment and hold temperature and pressure in the halls.
The work is with operators, engineers and technicians on the controls team.
AWS accepts a high school diploma plus a trade certificate or related training with at least a year of experience.
Key requirements
- High school or equivalent diploma.
- Associate’s degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
- Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
- 1+ years of experience working with low voltage controls, wiring, networking signals, electrical and mechanical systems, computers.
Controls and BMS
Controls Technician
Amazon Web Services (AWS)Wheatfield, INType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a controls technician, posted for Wheatfield, IN in northwest Indiana.
You would maintain and tune the industrial control systems that run cooling equipment in AWS data centers.
The work is with operators, engineers and technicians on the controls team.
AWS lists a high school diploma plus a trade certificate or related technical training.
Key requirements
- High school diploma or equivalent.
- Associate degree, trade school certification or other technical training in industrial or HVAC controls.
- Basic understanding of industrial controls, meters, sensors and relays.
- Low voltage controls and wiring experience.
Controls and BMS
Data Center Controls Tech
Amazon Web Services (AWS)New Carlisle, INType Full-Time
Pay Range shown on the AWS posting pageOpenings 3 with this title here
AWS is hiring a data center controls technician at its New Carlisle, IN campus.
You would maintain and tune the industrial control systems that run cooling equipment and hold temperature and pressure in the halls.
The work is with operators, engineers and technicians on the controls team.
AWS asks for a trade certificate or related training and several years of low voltage controls experience.
Key requirements
- High school or equivalent diploma.
- Associate’s degree, trade school certification, or other certified training in a related technical field with 4+ years of relevant.
- Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
- 3+ years of experience working with low voltage controls, wiring, networking signals, electrical and mechanical systems, computers.
Commissioning and QA/QC
Commissioning Engineer
Amazon Web Services (AWS)New Carlisle, INSchedule Weekend workType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
AWS is hiring a data center commissioning engineer at its New Carlisle, IN campus.
You would support contractors as they commission power systems, generators, UPS, HVAC, chilled water, BMS and EPMS.
The job means job site work, including climbing ladders and working at heights.
Shifts can run longer than eight hours, with some nights and weekends.
Key requirements
- 3+ years of engineering, installation or startup and commissioning of electrical and mechanical systems.
- Knowledge of critical data center mechanical and electrical equipment.
- Experience with mission critical facilities, especially data centers.
- Able to work at heights and from ladders.
Commissioning and QA/QC
Network Cabling Quality Technician
Amazon Web Services (AWS)Dublin, OHType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a network cabling quality technician in Dublin, OH.
You would work with network deployment and vendor teams to build quality checks into cable installation.
The job includes reviewing cabling design documents and training material against AWS standards.
AWS asks for knowledge of cabling, optic types and test equipment, plus two years of data center or cabling experience.
Key requirements
- Knowledge of network cabling, optic types, and test equipment.
- 2+ years of data center experience, or experience with cabling infrastructure best practices and methodologies.
- Associate's degree in Telecommunications or related discipline, or equivalent work experience.
- Knowledge of basic quality tools (e.g., defect categorization, root cause analysis, or quality reporting systems).
Commissioning and QA/QC
Mechanical Commissioning Technician
Faith TechnologiesLebanon, INSchedule Monday through FridayType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring a mechanical commissioning technician in Lebanon, IN.
You would support startup, testing and commissioning of mechanical systems on data center construction projects.
Systems include CRAH and CRAC units, chilled water, cooling towers and pumps.
The goal is to have each system installed, tested and running before turnover.
Key requirements
- Experience: Experience in mission critical or large scale commercial projects. Background in HVAC, Controls, Operations.
Commissioning and QA/QC
Electrical Quality Control Field Manager
Faith TechnologiesBeaver Dam, WISchedule Monday through Friday, weekend workType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring an electrical quality control field manager, with Beaver Dam, WI among the listed locations.
You would deliver commissioning services, including carrying out the commissioning plan and auditing job site quality.
The job includes coaching and training crews to raise installation quality and safety.
Faith asks for 10+ years of field experience, 5 as a superintendent, a journeyman or master license and up to 75% travel.
Key requirements
- Experience: 10 plus years of field experience, including not less than 5 years of successful experience as a project superintendent.
Commissioning and QA/QC
Mechanical QAQC Technician
Faith TechnologiesLebanon, INSchedule Monday through FridayType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a mechanical QA/QC technician in Lebanon, IN.
You would run quality control on mechanical and piping systems during construction of mission critical data centers.
Systems include CRAH and CRAC units, chilled water, cooling towers and pumps.
The job includes applying the project's quality procedures so work meets standard before turnover.
Key requirements
- Experience: Experience in mission critical or large scale commercial projects. Background in HVAC, Controls, Operations.
Commissioning and QA/QC
Commissioning & Reliability Manager
Aligned Data CentersConesville, OHType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Aligned is hiring a commissioning and reliability manager for its Conesville, OH campus.
You would work with third-party commissioning agents, review scripts and spot-check field tests against the sequence of operations.
The job supports Level 4 functional testing and Level 5 integrated systems testing, plus the issues log through closeout.
Aligned asks for 3 to 6 years in commissioning, reliability or mission critical delivery.
Key requirements
- Degree in mechanical, electrical or facilities engineering.
- 3 to 6 years in commissioning, reliability or mission critical facilities delivery.
- Experience supporting Level 4 and Level 5 testing.
- Experience managing a commissioning issues log through closeout.
Critical facilities operations
Critical Environment Technician
MicrosoftMount Pleasant, WISchedule 12-hour, weekend workType Full-Time
Pay $23.65 to $37.07 per hour
Microsoft is hiring a critical environment technician at its Fairwater data center campus in Mount Pleasant, WI.
You would monitor and inspect power and cooling equipment, do maintenance and help troubleshoot failures.
The job also includes enforcing safety rules and learning to write and follow MOPs and SOPs.
Expect 12-hour shifts that can fall on nights, weekends and holidays, with up to 25% travel.
Key requirements
- High school diploma, GED or equivalent.
- Preferred: an associate degree or trade certificate, or a year in a critical environment such as a data center, refinery or hospital.
- Must pass the Microsoft Cloud background check.
- Able to work 12-hour shifts, including nights and weekends.
Critical facilities operations
Senior Critical Environment Technician
MicrosoftMount Pleasant, WISchedule 12-hour, weekend workType Full-Time
Pay $34.13 to $56.54 per hour
Microsoft is hiring a senior critical environment technician at its Mount Pleasant, WI data center campus.
You would maintain power and cooling equipment, respond to incidents and coordinate with vendors and other facilities staff.
The job includes mentoring other technicians and using telemetry to watch equipment performance.
Expect 12-hour shifts that can fall on nights, weekends and holidays.
Key requirements
- High School Diploma, GED, or equivalent.
- 5+ years mission critical services work/applied learning experience.
- 1+ year(s) experience in a specialized area (e.g., mechanical field, electrical field, controls field) or related field.
- Ability to meet Microsoft, customer and/or government security screening requirements are required for this role. These requirements.
Critical facilities operations
Critical Environments Operator III
CyrusOneNew Albany, OHSchedule 24/7Type Full Time
Pay Not stated in the posting
CyrusOne is hiring a level III critical environments operator at its New Albany, OH data center.
You would carry out operations and maintenance work, tracking every job in the maintenance management system.
The job includes alarm response, critical switching, lockout and tagout, and setting up safe work areas for contractors.
The site needs coverage 24/7, including during emergencies.
Key requirements
- Journeyman-level skills in electrical, mechanical or HVAC/R.
- Associate's degree or equivalent trade training.
- Comfortable with maintenance software and spreadsheets.
- Available for extended hours during emergencies.
Critical facilities operations
Critical Facilities Maintenance Technician
Aligned Data CentersConesville, OHSchedule Weekend workType Full Time
Pay $35.00 to $45.00/hrOpenings 2 with this title here
Aligned is hiring a critical facilities maintenance technician at its new campus in Conesville, OH.
Under supervision, you would help maintain mechanical equipment, including the parts of the HVAC system.
The job includes tracking preventive, predictive and corrective work in the work order system.
Aligned lists 2 to 5 years of work experience and says electrical or mechanical critical facilities knowledge is a plus.
Key requirements
- High school diploma or GED and minimum 2-5 years’ working experience.
- Working knowledge of electrical and/or mechanical critical facilities systems a plus.
- Able to work 40 hours plus occasional overtime.
Critical facilities operations
Critical Facilities Technician
Aligned Data CentersConesville, OHSchedule 12 hour, weekend work, 24/7Type Full Time
Pay $35.00 to 45.00 an hourOpenings 2 with this title here
Aligned is hiring a critical facilities technician at its new campus in Conesville, OH.
You would do preventive, predictive and corrective maintenance on critical and non-critical equipment.
Mechanical work includes HVAC components and plumbing, alongside electrical systems.
Shifts can run 12 hours and include nights, weekends and holidays.
Key requirements
- High school diploma and minimum 3-5 years’ experience in electrical or mechanical critical facilities support.
- Electrical/Mechanical certifications preferred.
- Able to work overtime and longer shifts (12 hour).
- Shifts may require work day/night/weekend/holiday .
Critical facilities operations
Maintenance Manager
Aligned Data CentersConesville, OHType Full Time
Pay Not stated in the posting
Aligned is hiring a maintenance manager for its Conesville, OH data center campus.
You would plan and control preventive and predictive maintenance on mechanical, electrical and instrumentation equipment.
The job includes the preventive maintenance calendar, vendor service contracts and oversight of BMS, fire and life safety, plumbing and electrical systems.
You would work alongside the facility managers to keep the site at full uptime.
Low voltage and fiber
Network Deploy Technician
Amazon Web Services (AWS)Jeffersonville, OHSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a network deploy technician in Jeffersonville, OH.
The role supports network buildout across several data center locations and helps with day-to-day capacity work.
You would coordinate with internal teams and vendors and track work through a ticketing system.
The site runs 24/7, and the role joins a primary responder rotation.
Key requirements
- 2+ years of computer hardware troubleshooting and repair.
- 1+ years of computer networking experience.
- High school diploma or equivalent.
- Able to join a 24/7 responder rotation.
Construction leadership
Construction Project Engineer
MicrosoftMilwaukee, WIType Full-Time
Pay $97,600 to $188,400 a year (Microsoft's base range for U.S. roles)
Microsoft is hiring a construction project engineer for its Wisconsin data center program, posted for Milwaukee and Mount Pleasant.
You would track tasks, schedules and action items from project start through closeout.
The job includes coordinating vendor work and engineering site visits and keeping drawings, logs and turnover packages in order.
Microsoft asks for at least three years on large, complex construction projects, including experience in the region.
Key requirements
- Bachelor's Degree in Construction Project Management, Architecture, Engineering, or related field AND 5+ years related experience OR.
- Minimum 3 years experience working on large scale, complex ICI construction projects.
- Minimum 3 years of local, in region project experience.
- Experience with the substantial completion and closeout of at least 1 large scale complex construction project.
Construction leadership
Senior Project Engineer, NA
Vantage Data CentersPort Washington, WIType Full Time
Pay Not stated in the posting
Vantage is hiring a senior project engineer, based on site in Port Washington, WI, where it is building the Lighthouse campus.
You would run submittal and RFI workflow, change orders, design coordination and closeout.
The job also covers payment application reviews and safety reporting with partner contractors.
Vantage asks for 3+ years as a project engineer, and data center experience is preferred.
Key requirements
- Bachelor of Science in Construction Management, Architecture, Engineering, or similar field, or equivalent experience.
- 3+ years of experience as a Project Engineer in assisting or supervising construction projects of increasing complexity required.
- Data Center experience is a preferred.
- Experience in CSA (civil, structural, architectural) and MEP.
Construction leadership
Field Engineer Technician (Hourly)
Holder ConstructionConesville, OHSchedule Weekend work
Pay Not stated in the posting
Holder Construction is hiring an hourly field engineer technician for its project in Conesville, OH.
You would run total stations, automatic levels and other survey gear to lay out the work.
The job includes setting stakes, lines, elevations and grades and checking layout for foundations, anchor bolts, embeds, slabs and walls.
Holder asks for prior construction layout experience.
Key requirements
- Must have previous construction layout experience.
- Experience operating total stations, automatic levels.
- Working knowledge of common field tools, including tape measures, hammers, torpedo levels, stick rulers, framing squares.
- Working knowledge of construction layout principles, surveying calculations, and field measurements.
Construction leadership
Construction Manager
Amazon Web Services (AWS)New Carlisle, INType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a construction manager at its New Carlisle, IN data center campus.
You would own scope, quality, schedule and budget on new builds and capital projects.
The job covers project management and oversight of the construction work on site.
AWS lists experience with power management and power monitoring systems.
Key requirements
- Degree in electrical or mechanical engineering or a related field.
- Experience with power management and power monitoring systems.
- Experience taking projects from concept into deployment.
- Comfort with Excel and Word.
Construction leadership
Assistant Superintendent, Operations
Holder ConstructionNew Albany, OH
Pay Not stated in the posting
Holder Construction is hiring an assistant superintendent for its project in New Albany, OH.
You would oversee on-site crews and coordinate daily scope, sequencing and inspection of installed work.
The job includes enforcing OSHA and company safety rules and supporting the schedule and quality goals.
Holder accepts a construction degree or 3+ years of equivalent work experience.
Key requirements
- Bachelor’s degree in construction/engineering-related field OR 3+ years of equivalent work experience.
- Ability to work collaboratively in a team environment.
- Strong critical thinking and problem-solving skills.
- Outstanding communication and time management abilities.
Construction leadership
MEP Assistant Superintendent
Holder ConstructionNew Albany, OH
Pay Not stated in the posting
Holder Construction is hiring an MEP assistant superintendent for its project in New Albany, OH.
You would oversee installation of mechanical, electrical and plumbing systems to the project specs.
The job includes leading MEP trade partners and equipment vendors and supporting QA/QC and the energy control and safety program.
Holder asks for 5+ years of commercial construction on large MEP systems, such as data centers.
Key requirements
- 5+ years of commercial construction experience with large, sophisticated MEP systems.
- Proven ability to manage workforce requirements, monitor project progress, and resolve technical challenges.
- Experience managing construction of complex MEP infrastructure projects such as data centers, airports, or other special-use facilities.
- Strong communication and leadership skills for managing client and trade partner relationships.
Construction leadership
Associate Construction Manager
Aligned Data CentersConesville, OHType Full Time
Pay Not stated in the posting
Aligned is hiring an associate construction manager, posted for Conesville, OH.
You would support day-to-day management of data center construction projects.
Aligned notes that travel may be required for projects elsewhere in North America.
The posting asks for 2+ years managing commercial construction and knowledge of lean construction.
Key requirements
- Bachelor’s degree or equivalent in engineering, construction management or a related field.
- 2+ years progressive experience in successfully managing commercial construction projects or programs.
- Knowledge of lean construction methodologies and tools.
- Active listening and collaboration skills to engage all stakeholders in decision making processes.
Safety
Safety Coordinator
Holder ConstructionConesville, OH
Pay Not stated in the posting
Holder Construction is hiring a safety coordinator for its project in Conesville, OH.
You would run the project safety program in assigned work areas and support trade partners.
The job includes daily safety inspections and documenting what you find.
Holder requires OSHA 30.
Key requirements
- 2+ years of experience in construction, safety, or a related field preferred.
- OSHA 30 required.
- Working knowledge of construction means, methods, and sequencing.
- Ability to communicate and reinforce expectations with field personnel.
Safety
Senior Safety Coordinator
Holder ConstructionConesville, OH
Pay Not stated in the posting
Holder Construction is hiring a senior safety coordinator for its project in Conesville, OH.
You would lead safety for major scopes, trades or phases of the work and mentor junior safety staff.
The job includes reviewing and approving critical job hazard analyses and methods of procedure.
Holder requires OSHA 30 and prefers OSHA 500 and a BCSP certification.
Key requirements
- 3+ years of relevant construction safety experience preferred.
- OSHA 30 required; OSHA 500 preferred.
- BCSP certification (ASP, CSP, or CHST preferred).
- Competent Person training (e.g., cranes, rigging, NFPA 70E).