Electrical
Journeyman - Electrical
EverOnMesa, AZType Full Time
Pay Not stated in the posting
EverOn is hiring a Journeyman - Electrical in Mesa, AZ.
The Journeyman should be a outside linemen, inside wiremen, installer technician, electrician, or Master Electrician who has been engaged at the trade for at least five (5) years.
The Journeyman will be responsible for performing journey-level electrical duties in the diagnosis, maintenance and repair of electrical equipment.
Key requirements
- At least five (5) years of experience in the trade.
- Unlimited Electrical or Contractor's license (required).
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
Electrical
Electrician
Faith TechnologiesPhoenix, AZSchedule Monday through Friday, weekend workType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring an Electrician in Phoenix, AZ.
The Licensed Electrician I is responsible for electrical installations, troubleshooting, and maintenance within the commercial and industrial settings.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Mechanical and HVAC
Transitioning Military, Critical Facilities (Electrical or Mechanical)
Vantage Data CentersPhoenix, AZSchedule Weekend work, on-callType Full Time
Pay $40/hour to $70/hour
Vantage is hiring transitioning service members for critical facilities roles, with New Albany, OH among the listed sites.
You would help keep the mechanical and electrical systems in Vantage's data halls running.
The site is staffed 24/7 with critical facility engineers on every shift, so the job includes weekend and on-call work.
Vantage asks for at least 3 years of hands-on maintenance and repair of industrial electrical or mechanical systems.
Key requirements
- Minimum 3 years, 5+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Mechanical and HVAC
Data Center Chiller Technician (Monday-Friday)(9:30am-6:00pm)
Iron MountainPhoenix, AZSchedule Weekend work, 24/7Type Full Time
Pay Not stated in the posting
Iron Mountain posted this opening for its Phoenix, AZ site.
As the skilled Chiller Plant Technician, we will rely on you to be responsible for the day-to-day operations, efficiency, maintenance, and troubleshooting of the chiller plant infrastructure in support of the attainment of 100% up time.
The Chiller Plant Technician is a key member of the Iron Mountain Critical Infrastructure (CI) team.
Monitor operation of chiller plant infrastructure; track performance data and key metrics and record as required.
Ensure chiller plant infrastructure is operated in a safe manner and all operating procedures are adhered to.
Key requirements
- EPA Universal Certification.
- 1-3 years progressively responsible experience in plant. equipment management in large facilities with exposure to the following: Trane.
- Multi tasking - we use several different systems to manage ticket queues and work tasks can change throughout the day.
- Attention to detail - ability to understand and follow a documented process and Iron Mountain’s safety code, role is very process driven.
Mechanical and HVAC
Journeyman - Mechanical
EverOnMesa, AZType Full Time
Pay Not stated in the posting
EverOn is hiring a Journeyman - Mechanical in Mesa, AZ.
The Journeyman will be responsible for performing journey-level mechanical duties in the diagnosis, maintenance and repair of gasoline, diesel.
Break fix of all Electro-mechanical systems (HVAC, Hydronics, Appliances, Rollup doors, dock locks, air compressors, etc.).
Key requirements
- At least five (5) years of experience in the trade.
- Unlimited Mechanical or Contractor's license (required).
- Formal training in approved vocational schools in the fundamentals of the trade.
- Ability to stand, walk, sit, climb, and balance.
Controls and BMS
Data Center Controls Technician
Amazon Web Services (AWS)Mesa, AZType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Data Center Controls Technician in Mesa, AZ.
As a member of the Global Controls Team, you will collaborate with highly motivated operators, engineers and technicians in the data center industry to maintain and optimize critical infrastructure systems.
AWS data centers utilize sophisticated industrial control systems to automatically operate mechanical equipment, maintaining optimal temperature and pressure conditions throughout the facilities.
The first requirement listed is: high school or equivalent diploma.
Key requirements
- High school or equivalent diploma.
- Associate's degree, trade school certification, or other certified training in a related technical field with 1+ years of relevant.
- Basic understanding of Industrial controls system, knowledge of meters, devices, sensors, relays.
- 1+ years of experience working with low voltage controls, wiring, networking signals, electrical and mechanical systems, computers.
Commissioning and QA/QC
Construction Quality Manager, NA
Vantage Data CentersPhoenix, AZType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Construction Quality Manager, NA in Phoenix, AZ.
The project Construction team is responsible for the project execution, delivering the physical data centers from project planning and design through procurement to construction and commissioning, working with Sales, Operations, and management along the way.
The team manages Vantage’s design and build partners to success through technical feedback and review and actively participates in review of schedule and budget.
Participate in design and specification reviews - Identify quality risks and mitigation strategies - Align quality requirements with procurement.
Enforce QA/QC plans and inspection protocols - Perform first-work inspections and audits - Track.
Key requirements
- 7+ years of construction QA/QC experience (data center or mission critical preferred) - Strong understanding of mechanical, electrical.
Commissioning and QA/QC
Commissioning Engineer II
QTS Data CentersPhoenix, AZSchedule Weekend work
Pay Not stated in the posting
QTS Data Centers is hiring a Commissioning Engineer II in Phoenix, AZ.
The Commissioning Engineer II is responsible for but not limited to Level 1, 2, 3, 4 and 5 commissioning of base building systems, security systems, life safety systems, Electrical, Mechanical, and EPMS/BMS systems of a Data Center environment.
This role will oversee, document, and track various aspects of commissioning activities.
The first requirement listed is: Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
The posting lists more than one location, and this city is one of them.
Key requirements
- Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
- Five or more years of work experience in data center engineering, commissioning, project management, or equivalent.
- Background in areas of building maintenance, CCTV and Access control systems, network, telecommunications.
- Ability to travel to other Data Center locations as required.
Commissioning and QA/QC
Mechanical Commissioning Engineer
Faith TechnologiesPhoenix, AZSchedule Monday through FridayType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring a Mechanical Commissioning Engineer in Phoenix, AZ.
The Mechanical Commissioning Engineer is responsible for the successful development, implementation, and coordination of project commissioning plans and documents, as well as conducting on-site/jobsite coordination and execution of commissioning activities.
This work is completed under the general oversight of an upper-level Commissioning Engineer or Commissioning Field Manager.
Work with Preconstruction Managers and Project Managers at the beginning of projects to define commissioning requirements.
Assist with creating LOTO plans and start-up scripts.
Key requirements
- Education: Bachelor of Science in Mechanical Engineering or equivalent experience.
- Experience: 3 to 8 years of related experience or 5 to 12 years of mechanical commissioning experience.
Commissioning and QA/QC
Commissioning Engineer (I, II or III)
QTS Data CentersGlendale, AZSchedule Weekend work
Pay Not stated in the posting
QTS is hiring commissioning engineers at levels I, II and III for its Fayetteville, GA campus.
The team handles Level 1 through Level 5 commissioning of electrical, mechanical, EPMS and BMS systems, plus life safety and security systems.
You would write commissioning plans, track the work and coordinate with the QTS development team and outside contractors.
The posting asks for travel to other QTS sites as needed.
Key requirements
- Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
- Five or more years of work experience in data center engineering, commissioning, project management, or equivalent.
- Background in areas of building maintenance, CCTV and Access control systems, network, telecommunications.
- Ability to travel to other Data Center locations as required.
Commissioning and QA/QC
Commissioning Electrician
Faith TechnologiesMesa, AZSchedule Monday through Friday, weekend workType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring a Commissioning Electrician in Mesa, AZ.
Conduct quality inspections for layout conduit systems, various lighting systems, and basic control systems and feeders.
Conduct quality inspections of installation of motor feeders and makes standard motor connections.
The posting lists more than one location, and this city is one of them.
Commissioning and QA/QC
Commissioning & Reliability Manager
Aligned Data CentersPhoenix area, AZType Full Time
Pay Not stated in the posting
Aligned Data Centers is hiring a commissioning and reliability manager in the Phoenix area.
You would work with third-party commissioning agents, review scripts and witness testing, and spot-check field tests against the sequence of operations.
The role manages the commissioning issue log, ranks issues by severity and drives root cause analysis for Level 4 and Level 5 problems.
It also gates systems between commissioning levels and works with site operations on open deficiencies.
Key requirements
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, Facilities Engineering.
- Minimum of 3-6 years of experience in commissioning, reliability, or mission-critical facilities delivery.
- Experience supporting Level 4 functional testing and Level 5 Integrated Systems Testing (IST), including readiness tracking.
- Experience supporting issue management and closeout (Cx log), coordinating corrective actions across trades/vendors.
Critical facilities operations
Data Center Chief Engineer
Amazon Web Services (AWS)Mesa, AZType Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring a Data Center Chief Engineer in Mesa, AZ.
The Data Center Chief Engineer (CE) is responsible for ensuring that all electrical, mechanical, and fire/life safety equipment within the data center is operating at peak efficiency.
This involves planned preventative maintenance of equipment, daily corrective work, and emergency response.
The first requirement listed is: regularly walk, use hands and fingers, handle or feel, reach with hands and arms, stoop, kneel, crouch or crawl, climb stairs, twist, bend.
Key requirements
- Regularly walk, use hands and fingers, handle or feel, reach with hands and arms, stoop, kneel, crouch or crawl, climb stairs, twist, bend.
- Willingness to temporarily work at alternative sites during training periods or until assigned facility is operational.
- Travel frequency will vary based on business needs and operational status of assigned facility.
- Candidates must be able to travel (over 50 miles) or commute (less than 50 miles) to active data center sites as required by business needs.
Critical facilities operations
Data Center Facility Manager
Amazon Web Services (AWS)Mesa, AZSchedule On-call, 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 4 with this title here
Amazon Web Services (AWS) is hiring a Data Center Facility Manager in Mesa, AZ.
Data Center Facility Manger role acts as Amazon’s front line when it comes to hands-on electrical and mechanical equipment troubleshooting.
Mechanical equipment includes CRAC units, centrifugal chillers, cooling towers/water chemical systems, air handlers and associated systems, pumps, and motors.
Oversee all aspects of the data center's critical physical infrastructure. Ensure that all work performed within the space is done to high quality.
Manage teams of 24x7 engineering technicians in all facets of their career.
Key requirements
- 2+ years of in a managerial/supervisory role with 5 or more direct reports experience.
- 3+ years of in industrial electrical or mechanical systems experience.
- 3+ years of administrative experience including Microsoft Office products experience.
Critical facilities operations
Chief Engineer, Data Centers
JLLChandler, AZType Full Time
Pay Not stated in the posting
JLL is hiring a Chief Engineer, Data Centers in Chandler, AZ.
The Chief Engineer oversees the efficient, safe and responsible operation of all building systems and equipment while also leading the engineering team.
The Chief Engineer is responsible for protecting and improving the value of the client’s assets and will be expected to provide recommendations for operational and capital improvements.
Supervise and manage engineers and maintenance staff including hiring, training, coaching and personal development.
Identify maintenance objectives of the facility and incorporate those objectives into a documented plan that includes preventive, predictive.
Critical facilities operations
Critical Facilities Engineer, NA
Vantage Data CentersPhoenix, AZSchedule 4x10, weekend work, on-callType Full Time
Pay Not stated in the posting
Vantage Data Centers is hiring a Critical Facilities Engineer, NA in Phoenix, AZ.
The Site Operations Department is responsible for the overall health of all mechanical and electrical systems, building maintenance, and performance of all data modules in our data centers.
The team is staffed 24 x 7 onsite with Critical Facility Engineers (CFEs) on each shift.
Work under limited supervision, both independently and within a team environment.
Manage multiple one-time and/or ongoing projects.
Key requirements
- Minimum 1 year, 3+ years preferred, of “hands on” experience with the maintenance and repair of industrial electrical.
- Demonstrate knowledge in operating, maintaining, repairing, inspecting and testing critical electrical distribution systems.
- Ability to read commercial building blueprints and understand electrical single lines and schematics.
- Knowledge of commonly-used concepts, practices, and procedures related to mechanical & electrical systems needed to run data centers.
Critical facilities operations
Critical Environment Engineer
QTS Data CentersPhoenix, AZSchedule 24/7
Pay Not stated in the posting
QTS Data Centers is hiring a Critical Environment Engineer in Phoenix, AZ.
This role requires work hours to support a 7X24X365 data center environment.
Provide technical support to all aspects of data center operations including the operation, maintenance.
Assist in all site construction activity and installations, in coordination with QTS Development Team, external construction resources.
Key requirements
- Bachelor’s degree or professional equivalent.
- Five or more years of direct experience with engineering related activities in a technical or critical environment.
- HVAC or critical power certifications or equivalent professional experience.
- Ability to travel up to 50% to other Data Center locations as required.
Critical facilities operations
DoW SkillBridge Data Center Technician Apprentice
NTT Global Data CentersMesa, AZSchedule Monday through FridayType Full Time
Pay Not stated in the postingOpenings 2 with this title here
NTT Global Data Centers posted this opening for its Mesa, AZ site.
Electrical areas of responsibility include: electrical/critical power distribution from the Utility/Generator main entrance switchgear through the.
Plumbing areas of responsibility include: all water supply piping, fixtures, meters, backflow preventers, water heaters, boilers.
Control system areas of responsibility include: electrical and mechanical controls, monitoring and alarm systems and their operations.
Key requirements
- Entry level knowledge of information technology (IT), the electrical and mechanical systems used in a data center environment, including.
- Entry level knowledge of NEC, NFPA 70E, NFPA 72, NFPA 25, and compliance issues, as well as building codes in regard to fire life safety.
- Entry level knowledge in industrial safety best practices (i.e. lockout/tag out, arc flash protection, OSHA and state regulations).
- Ability to rapidly learn and use PC based, integrated critical monitoring and control systems.
Critical facilities operations
Critical Environments Operator (Level 1-4) - NIGHT SHIFT
CyrusOneChandler, AZSchedule Night shift, overnight, on-callType Full Time
Pay Not stated in the posting
CyrusOne posted this opening for its Chandler, AZ site.
Monitor and operate data center mechanical, electrical, and HVAC/R systems to ensure continuous uptime and reliability.
Respond to building system alarms, prioritizing critical load protection, equipment preservation, and root cause analysis.
Execute Preventive Maintenance work orders and follow SOPs, MOPs, EOPs, and MMRs as appropriate.
The posting lists more than one location, and this city is one of them.
Key requirements
- This is an evergreen posting that supports hiring across four levels. The right level for you will be determined based on your experience.
- No prior data center experience required. Ideal for candidates eager to learn data center O&M, with 0-2 years in operations, maintenance.
- 3-5 years of experience in Tier 2, 3, or 4 data centers or a technical facility maintenance role. Entry-level skills in electrical.
- 5-7 years of data center or building engineering experience. Journeyman-level skills in electrical, mechanical.
Critical facilities operations
Critical Environments Operator (Level 1-4)
CyrusOneChandler, AZSchedule On-call, 24/7Type Full Time
Pay Not stated in the posting
CyrusOne is hiring a Critical Environments Operator (Level 1-4) in Chandler, AZ.
Monitor and operate data center mechanical, electrical, and HVAC/R systems to ensure continuous uptime and reliability.
Respond to building system alarms, prioritizing critical load protection, equipment preservation, and root cause analysis.
Execute Preventive Maintenance work orders and follow SOPs, MOPs, EOPs, and MMRs as appropriate.
The posting lists more than one location, and this city is one of them.
Key requirements
- This is an evergreen posting that supports hiring across four levels. The right level for you will be determined based on your experience.
- No prior data center experience required. Ideal for candidates eager to learn data center O&M, with 0-2 years in operations, maintenance.
- 3-5 years of experience in Tier 2, 3, or 4 data centers or a technical facility maintenance role. Entry-level skills in electrical.
- 5-7 years of data center or building engineering experience. Journeyman-level skills in electrical, mechanical.
Critical facilities operations
Lead Critical Facilities Technician (5:30am-4pm)(Wednesday-Saturday)
Iron MountainPhoenix, AZSchedule Weekend work, 24/7Type Full Time
Pay Not stated in the posting
Iron Mountain posted this opening for its Phoenix, AZ site.
The Lead Critical Facilities Technician provides technical and facility support in a 24x7 data center environment, including maintenance and oversight of electrical, HVAC, and building management systems.
Employee Assistance Program.
Annual Merit Increases, 2 Weeks Paid Vacation, 7 Paid Holidays + Sick Pay.
Key requirements
- 3-5 years experience in a critical operations environment and/or data center experience preferred, but not required.
- Experience running projects or supervising people is preferred.
- Effective communicator - clearly convey messages & requirements to inform our customers effectively.
- Multi tasking - we use several different systems to manage ticket queues and work tasks can change throughout the day.
Low voltage and fiber
Senior Data Center Low Voltage Engineer
OraclePhoenix, AZSchedule Weekend workType Regular Employee
Pay $74,100 to $148,300 a year (posted U.S. hiring range)Openings 2 with this title here
Oracle is hiring a senior data center low voltage engineer in Phoenix, AZ.
The role deploys structured cabling for new data center builds and expansions and troubleshoots patch panel and patch cord connectivity problems.
It follows Oracle's global cabling and infrastructure standards and keeps the build documentation current.
The engineer also reviews bills of materials and works with vendors on infrastructure build-outs.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Mesa, AZSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Mesa, AZ.
Traveling within and outside of the regional work area is required.
The first requirement listed is: regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
- Ascending and descending ladders, stairs, and gangways safely and without limitation.
Low voltage and fiber
Infra Delivery Install Technician
Amazon Web Services (AWS)Avondale, AZSchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
Amazon Web Services (AWS) is hiring an Infra Delivery Install Technician in Avondale, AZ.
Traveling within and outside of the regional work area is required.
The first requirement listed is: regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
Key requirements
- Regularly lift and/or move up to 40 pounds; and participate in group lifts for 41+ pounds.
- Ability to work in an environment that operates 24/7 with an ability to participate in primary responder rotation.
- Bending, lifting, stretching, reaching, standing and walking for up to 8+ hours a day.
- Ascending and descending ladders, stairs, and gangways safely and without limitation.
Construction leadership
Electrical Superintendent
Faith TechnologiesPhoenix, AZSchedule Monday through Friday, weekend workType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring an Electrical Superintendent in Phoenix, AZ.
Licensed Superintendents are responsible for leading our electrical teams on the job site.
Superintendents have a well versed knowledge of the National Electric Code (NEC) and a strong passion for safety, training, leadership development, and commitment to excellence.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).
Construction leadership
Electrical Foreman
Faith TechnologiesPhoenix, AZSchedule Monday through Friday, weekend workType Full Time
Pay Not stated in the postingOpenings 2 with this title here
Faith Technologies is hiring an Electrical Foreman in Phoenix, AZ.
The Licensed Foreman I is responsible for supervising electrical installations, troubleshooting, and maintenance within the commercial and industrial settings.
Maintain current licensing and training requirements.
Key requirements
- Education: Completion of an apprenticeship or equivalent work experience (8,000 hours).