Controls and BMS
Electrical Field Controls Technician
Faith TechnologiesAtlanta, GASchedule Monday through Friday, weekend workType Full Time
Pay Not stated in the posting
Faith Technologies is hiring an electrical field controls technician, posted for Atlanta, GA.
The job deploys electrical power monitoring systems (EPMS) and building management systems (BMS) at data center facilities.
You would install and configure software, commission and troubleshoot power monitoring equipment and train customers on the finished system.
The posting lists 75% travel and a 6 a.m. to 6 p.m. weekday schedule that can include nights and weekends.
Key requirements
- Associate's degree in electrical engineering with a controls emphasis, or equivalent experience.
- Experience with power monitoring, building automation or systems integration.
- Experience around switchgear, generators and UPS systems.
- Able to travel up to 75%.
Controls and BMS
Data Center Controls Tech
Amazon Web Services (AWS)Lithia Springs, GASchedule On-callType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a data center controls technician in Lithia Springs, GA.
You would deploy, service and upgrade BMS and EPMS systems across several AWS data centers.
The work covers field sensors, controllers, wiring, networking and programming for industrial controls.
You would also train facilities staff on how the controls systems run.
Key requirements
- High school diploma or equivalent.
- Military or trade school diploma, or an associate degree, plus a year of controls or electrical or mechanical operations experience.
- A year working with computer components and operating systems.
- Able to work at heights and from ladders.
Controls and BMS
Data Center Controls Engineer
Amazon Web Services (AWS)Jackson, GASchedule On-callType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a data center controls engineer, posted for Jackson, GA.
The job manages the building management system (BMS) and electrical power monitoring system (EPMS) scope during construction of AWS data centers.
You would make sure controls are installed to the scope of work and specs, review MEP drawings and build the controls bill of materials.
The posting asks for a valid driver's license and travel at least 25% of the time.
Key requirements
- 4+ years of general contractor and vendor management work.
- Bachelor’s degree in Mechanical Engineering, Electrical Engineering, or an equivalent engineering science plus 5+ years of relevant.
- 5+ years with industrial controls in critical environment.
Commissioning and QA/QC
Electrical Assistant Project Manager, Commissioning
Faith TechnologiesAtlanta, GASchedule Monday - FridayType Full Time
Pay Not stated in the posting
Faith Technologies is hiring an assistant project manager for electrical QA/QC and commissioning work, posted for Atlanta, GA.
Working under a project or program manager, you would help run commissioning scopes on electrical and specialty systems.
The job includes ordering materials and supporting schedules on the construction side.
Knowledge of the electrical construction trade is preferred.
Key requirements
- Education: Bachelor’s Degree in Construction Management/Electrical Engineering.
- Experience: Minimum of 1-2 years of Project Management, Construction Management, Project Engineering.
Commissioning and QA/QC
Commissioning Associate Project Manager
Faith TechnologiesAtlanta, GAType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a commissioning associate project manager, posted for Atlanta, GA.
You would manage electrical and specialty systems QA/QC and commissioning projects and oversee the staff on them.
The job includes building the commissioning scope, schedule and budget and checking estimates before they go out.
Faith also expects this role to help win new work and keep customer relationships.
Key requirements
- Education: Bachelor's Degree in Construction Management, or Electrical Engineering, or equivalent technical training.
- Experience: Five years of Project Management, Construction Management, Project Engineering.
Commissioning and QA/QC
Data Center Commissioning Project Manager
Faith TechnologiesAtlanta, GASchedule Monday - FridayType Full Time
Pay Not stated in the posting
Faith Technologies is hiring a data center commissioning project manager, posted for Atlanta, GA.
You would manage electrical and specialty systems QA/QC and commissioning, including startup and commissioning schedules.
The job includes building the scope, budget and safety plan for each commissioning effort.
Faith asks for about five years of project management, construction management or project engineering.
Key requirements
- Education: Bachelor’s Degree in Engineering, Construction Management, or equivalent technical training/experience.
- Experience: 5 years of Project Management, Construction Management, Project Engineering.
Commissioning and QA/QC
Commissioning Engineer (I, II or III)
QTS Data CentersFayetteville, GASchedule Weekend work
Pay Not stated in the posting
QTS is hiring commissioning engineers at levels I, II and III for its Fayetteville, GA campus.
The team handles Level 1 through Level 5 commissioning of electrical, mechanical, EPMS and BMS systems, plus life safety and security systems.
You would write commissioning plans, track the work and coordinate with the QTS development team and outside contractors.
The posting asks for travel to other QTS sites as needed.
Key requirements
- Bachelor's degree in Construction Management, Project Management, Computer Science, or a related field or equivalent professional experience.
- Five or more years of work experience in data center engineering, commissioning, project management, or equivalent.
- Background in areas of building maintenance, CCTV and Access control systems, network, telecommunications.
- Ability to travel to other Data Center locations as required.
Commissioning and QA/QC
Quality Control Engineer
Amazon Web Services (AWS)Atlanta, GAType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a quality control engineer in Atlanta for its data center construction quality program.
The role runs QA/QC checks through the life of a data center build, so installed work meets AWS standards before turnover.
You would work across electrical and mechanical systems with contractors and commissioning teams.
AWS asks for commissioning and mission critical construction experience.
Key requirements
- 4+ years of industrial or commercial engineering in mission critical facilities including but not limited to: data centers.
- 4+ years of commissioning experience.
- 5+ years of engineering, installation, or startup/commissioning of electrical and mechanical systems experience.
- Bachelor's degree in Electrical Engineering or a related field.
Commissioning and QA/QC
Commissioning Engineer
Amazon Web Services (AWS)Atlanta, GASchedule Weekend workType Full-Time
Pay Range shown on the AWS posting pageOpenings 6 with this title here
AWS is hiring a data center commissioning engineer in the Atlanta area.
You would support vendors and contractors as they commission medium and low voltage power, generators, UPS, air handlers and chilled water systems.
The scope also includes BMS, EPMS, pumps, hydronic systems, and testing and balancing.
Expect job site work at heights and shifts longer than eight hours, with some nights and weekends.
Key requirements
- 5+ years of engineering, installation or startup and commissioning of electrical and mechanical systems.
- Engineering degree, or 5+ years of relevant work experience.
- Strong technical skill in mechanical, electrical or controls systems for critical infrastructure.
- Able to work shifts longer than eight hours.
Commissioning and QA/QC
Quality Assurance Senior Project Manager (data center construction)
QTS Data CentersFayetteville, GA
Pay Not stated in the posting
QTS is hiring a senior quality assurance project manager for data center construction at its Fayetteville, GA campus.
You would run the quality program on one or more projects and lead the project quality staff.
The job includes training project teams, trade partners and vendors on QTS quality expectations.
QTS asks for 5+ years of construction and 2+ years of quality management experience.
Key requirements
- The Quality Assurance Sr. Project Manager (QAM, Data Center Construction), is primarily responsible for leading the development.
- 5+ years of construction experience.
- 2+ years of quality related management experience, including plan development, training, implementation, and continuous improvement.
- Experience in Microsoft Office suite, specifically PowerPoint for presentation development and Excel for data compilation and analysis.
Critical facilities operations
Critical Facilities Engineer II
FlexentialNorcross, GASchedule Weekend work, on-call, 24/7
Pay $42.00 to $44.00 an hour
Flexential is hiring a level II critical facilities engineer at its Norcross, GA data center.
The job is preventive and corrective maintenance on the site's electrical, mechanical and HVAC equipment.
You would also manage vendors, schedule work and keep maintenance records current.
The role carries 24/7 on-call duty for the facility.
Key requirements
- 2 Years of data center experience.
- 4+ years of experience with root cause analysis and troubleshooting/problem solving.
- Experience working with building automation.
- 4+ years of experience within a critical infrastructure environment.
Critical facilities operations
OSC Facilities Support Engineer I
QTS Data CentersAtlanta Suwanee, GASchedule Weekend workType Full Time
Pay Not stated in the posting
QTS is hiring a facilities support engineer for its Operations Service Center in Suwanee, GA.
You would watch EPMS and BMS alarm dashboards for QTS sites, troubleshoot remotely and run the call when a major incident happens.
The job includes change control, incident reports and escalation under QTS service levels.
The center runs 24/7, so the role is shift work that can include weekends and holidays.
Key requirements
- AAS or BS degree in Mechanical or Electrical Engineering, or a related field or equivalent professional experience.
- Two or more years of experience in a data center or other critical environment.
- One or more years of experience with CMMS, ticketing, and monitoring platforms, such as ScienceLogic, ServiceNow, or similar applications.
- One or more years of experience with monitoring systems such as BMS and EPMS.
Critical facilities operations
Critical Operations Technician I
QTS Data CentersAtlanta Metro, GASchedule 24/7Type Full Time
Pay Not stated in the posting
QTS is hiring a level I critical operations technician at its Atlanta metro data center.
You would install, repair and maintain electrical, mechanical, plumbing and controls equipment inside and outside the building.
The job includes routine rounds, readings and preventive maintenance on critical systems.
The site runs 24/7, and QTS counts technical or military training toward the requirements.
Key requirements
- Two or more years of technical training, military training, or workplace equivalency.
- Background in areas of IT, electrical, and/or mechanical.
- Proficiency with MS Office Suite.
- Customer focus with excellent interpersonal skills, and the ability to interface with all levels within the organization.
Critical facilities operations
Supervisor, Critical Operations
QTS Data CentersAtlanta, GA
Pay Not stated in the posting
QTS is hiring a critical operations supervisor at its Atlanta data center.
You would lead the team that maintains electrical, mechanical, fire and life safety, plumbing and controls equipment.
The job covers emergency response planning, preventive and corrective maintenance, parts budgets and vendor service contracts.
The site runs 24/7, and the role is fully on site.
Low voltage and fiber
Network Deployment Technician
Amazon Web Services (AWS)Covington, GASchedule 24/7Type Full-Time
Pay Range shown on the AWS posting pageOpenings 2 with this title here
AWS is hiring a network deployment technician at its Covington, GA data center site.
The role supports network buildout across several data center locations and helps with day-to-day capacity work.
You would coordinate with internal teams and outside vendors and track work through a ticketing system.
The site runs 24/7, and the role joins a primary responder rotation.
Key requirements
- 1+ years of computer networking experience.
- 1+ years with Linux operating systems.
- Able to lift and rack equipment up to 40 pounds.
- Hardware troubleshooting and repair experience.
Low voltage and fiber
Network Install Technician
Amazon Web Services (AWS)Covington, GASchedule 24/7Type Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a network install technician at its Covington, GA data center site.
The work is hands-on: moving and installing large network equipment, running fiber and copper cable and patching between racks.
The site runs 24/7, and the role joins a primary responder rotation with some after-hours support.
Expect to lift up to 40 pounds and work in cramped, elevated or noisy spaces.
Key requirements
- 1+ years of hardware repair, infrastructure cabling, network deployment or data center operations, or a similar vocational role.
- High school diploma or equivalent.
- Able to lift up to 40 pounds.
- Able to join a 24/7 responder rotation.
Construction leadership
Construction Manager
Amazon Web Services (AWS)Atlanta, GAType Full-Time
Pay Range shown on the AWS posting page
AWS is hiring a construction manager in Atlanta to oversee data center infrastructure builds.
You would be AWS's main representative on site, managing general contractors and specialty subcontractors.
The job runs from groundbreaking through power facilities handoff and substantial completion, with safety, schedule, budget and AWS standards in your hands.
AWS lists a degree in electrical or mechanical engineering and experience with power management and power monitoring systems.
Key requirements
- Degree in electrical or mechanical engineering or a related field.
- Experience with power management and power monitoring systems.
- Experience taking projects from concept into deployment.
- Comfort with Excel and Word.